8 resultados para management projects
em Cochin University of Science
Resumo:
The present study aims at the investigation of the 1ysico—chemical features of a tropical tidal river viz. we Muvattupuzha river. This river is expected to receive Jderate to heavy pollution loads in years to come, from we lone industrial unit, already set up on its bank. ilike other rivers, the geographical disposition of this Lver attains unique importance as regards its dynamics for 3) availability of natural runoff water from catchment :eas, which becomes very heavy during the monsoon season 3) regular steady availability of tail race water from a /dro—electric power station throughout the yearThe study also aims at arriving at the balancing forces of inherent self~purification of the river verses pollution loads from the factory effluents. The investigation period falls ahead of actual pollution occurrence and so the ambient conditions for a period of nearly one-and-a—half years were investigated, the analyses of which providflz to formulate the inter-relations of parameters varying with seasons. Tracer experiments were carried out which revealed the dispersion and dilution characteristics of the river in the vicinity of effluent outfall. The studv covers the trial—cum-capacity production periods of the factory during which effluents of various strength and quantity were discharged into the river; a few computed values arQ’cjmpgrQdl ... with the observed values. The base data along with the profiles of Oxygen sag equation have been utilized fb develop a mathematical model of the river with regard to its water quality
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.
Resumo:
Soil erosion is more detrimental and affects the chemical, physical and biological properties of the soil. Degradation of soil and water resources is a worldwide problem. Over the next two decades, it is expected that the world will need 17% more water to grow food for the increasing population in developing countries and that total water use will increase by 40%. The total land area subjected to human-induced soil degradation is estimated as 20 x 106 (km)2 Hence conservation of soil and water is essential for the subsistence of life. This can be made possible through sustainable watershed management. This thesis aims at investigating the condition under which sustainable watershed management is possible in Kerala, in South India. The research has been carried out in three stages. In the first stage a conceptual framework is formulated (Chapter 3) based on the relevant literature (Chapter 2) in the field of watershed management. In the second stage this framework is applied to two existing case studies in Kerala State (Chapter 4). In the third stage, the methodology is used to test out geo textile innovation (Chapter 5) in two field experiments (Chapter 6).
Resumo:
Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.
Resumo:
This paper aims to describe recent developments in the services provided by Indian electronic thesis and dissertation (ETD) repositories. It seeks to explore the prospect of knowledge formation and diffusion in India and to discuss the potential of open access e-theses repositories for knowledge management.This study is based on literature review and content analysis of IndianETDrepository websites. Institutional repositories and electronic thesis and dissertation projects in India were identified through a literature survey as well as internet searching and browsing. The study examines the tools, type of contents, coverage and aims of Indian ETD repositories.The paper acknowledges the need for knowledge management for national development. It highlights the significance of an integrated platform for preserving, searching and retrieving Indian theses. It describes the features and functions of Indian ETD repositories.The paper provides insights into the characteristics of the national repository of ETDs of India, which encourage and support open access to publicly-funded research