7 resultados para gear assembly

em Cochin University of Science


Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the present work, we report the third order nonlinear optical properties of ZnO thin films deposited using self assembly, sol gel process as well as pulsed laser ablation by z scan technique. ZnO thin films clearly exhibit a negative nonlinear index of refraction at 532 nm and the observed nonlinear refraction is attributed to two photon absorption followed by free carrier absorption. Although the absolute nonlinear values for these films are comparable, there is a change in the sign of the absorptive nonlinearity of the films. The films developed by dip coating and pulsed laser ablation exhibit reverse saturable absorption whereas the self assembled film exhibits saturable absorption. These different nonlinear characteristics in the self assembled films can be mainly attributed to the saturation of linear absorption of the ZnO defect states.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trawling, despite being heavily energy expensive, still continues to be the most energy expensive fishing method particularly so in View of the export oriented nature of the Indian seafood industry. This study therefore aims at analyzing the efficiency of trawls operation from Cochin, an important fishing center along the southwest coast of India. The analysis is made along two perspectives - economic and technological. Even though technological efficiency complement economic efficiency, in the fishing parlance, parameters like the size composition of the catch, selectivity factors, etc., will have a direct bearing on the technological qualities of the trawl, and which parameters will have a significant impact on the effective exploitation of a fishery stock. Whereas the technological analysis aims at improving the efficiency with regard to the effective utilization of fuel and fishery stocks, economic analysis ascertains the present status of the trawling operations from the commercial angle.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The preceding discussion and review of literature show that studies on gear selectivity have received great attention, while gear efficiency studies do not seem to have received equal consideration. In temperate waters, fishing industry is well organised and relatively large and well equipped vessels and gear are used for commercial fishing and the number of species are less; whereas in tropics particularly in India, small scale fishery dominates the scene and the fishery is multispecies operated upon by nmltigear. Therefore many of the problems faced in India may not exist in developed countries. Perhaps this would be the reason for the paucity of literature on the problems in estimation of relative efficiency. Much work has been carried out in estimating relative efficiency (Pycha, 1962; Pope, 1963; Gulland, 1967; Dickson, 1971 and Collins, 1979). The main subject of interest in the present thesis is an investigation into the problems in the comparison of fishing gears. especially in using classical test procedures with special reference to the prevailing fishing practices (that is. with reference to the catch data generated by the existing system). This has been taken up with a view to standardizing an approach for comparing the efficiency of fishing gear. Besides this, the implications of the terms ‘gear efficiency‘ and ‘gear selectivity‘ have been examined and based on the commonly used selectivity model (Holt, 1963), estimation of the ratio of fishing power of two gear has been considered. An attempt to determine the size of fish for which a gear is most efficient.has also been made. The work has been presented in eight chapters

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Assembly job shop scheduling problem (AJSP) is one of the most complicated combinatorial optimization problem that involves simultaneously scheduling the processing and assembly operations of complex structured products. The problem becomes even more complicated if a combination of two or more optimization criteria is considered. This thesis addresses an assembly job shop scheduling problem with multiple objectives. The objectives considered are to simultaneously minimizing makespan and total tardiness. In this thesis, two approaches viz., weighted approach and Pareto approach are used for solving the problem. However, it is quite difficult to achieve an optimal solution to this problem with traditional optimization approaches owing to the high computational complexity. Two metaheuristic techniques namely, genetic algorithm and tabu search are investigated in this thesis for solving the multiobjective assembly job shop scheduling problems. Three algorithms based on the two metaheuristic techniques for weighted approach and Pareto approach are proposed for the multi-objective assembly job shop scheduling problem (MOAJSP). A new pairing mechanism is developed for crossover operation in genetic algorithm which leads to improved solutions and faster convergence. The performances of the proposed algorithms are evaluated through a set of test problems and the results are reported. The results reveal that the proposed algorithms based on weighted approach are feasible and effective for solving MOAJSP instances according to the weight assigned to each objective criterion and the proposed algorithms based on Pareto approach are capable of producing a number of good Pareto optimal scheduling plans for MOAJSP instances.