5 resultados para cost control

em Cochin University of Science


Relevância:

100.00% 100.00%

Publicador:

Resumo:

It is a fact that there now exists a sound framework of accounting theory to ascertain the working results and the investment status of hospitals. Yet, there is no system of accounting in practice to conduct its activities with utmost efficiency. No attempts have hitherto been made for the continuous improvement in the servics rendered by hospitals. Personal investments in hospitals have made the interaction of business to some extent.Planning, decision making and control assume increasing importance as hospitals grow in size and complexity. Moreover, wise and effective utilisation of resources should be ensured. The importance of cost cannot be overlooked in this context. Cost is the most effective factor in the determination of the prices of hospital services rendered. The important managerial functions have to rely heavily on accurate and timely cost information. More people can be provided with services if no services cost more than what is a must to provide the necessary level of care. The price paid for high cost technology for a few is no technology at all for the many. Hence no pains must be spared in ascertaining, presenting, controlling and reducing costs. An effective system of Cost Accountancy and Cost Control is imperative for the survival of hospitals in the intensely competitive conditions of today. The valuable objective of "better patient care" can be attained only if the management can make use of the various tools and techniques to ascertain, control and reduce each item of cost in hospitals. Constant efforts must be made by the management to continuously improve their services and bring down costs and prices of all hospital services. Cost Accountancy has made its impresssive impact on almost all the spheres of human activities. It is high time a comprehensive Cost Accountancy and Cost Control system be implemented in hospitals. The problem under study thus is the designing of a sound and full-fledged Cost Accountancy and Cost Control system that suits the requirements of hospitals. It is for the first time in India during the evolution of Cost Accountancy that a comprehensive cost system is tried in hospitals.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In this Letter we numerically investigate the dynamics of a system of two coupled chaotic multimode Nd:YAG lasers with two mode and three mode outputs. Unidirectional and bidirectional coupling schemes are adopted; intensity time series plots, phase space plots and synchronization plots are used for studying the dynamics. Quality of synchronization is measured using correlation index plots. It is found that for laser with two mode output bidirectional direct coupling scheme is found to be effective in achieving complete synchronization, control of chaos and amplification in output intensity. For laser with three mode output, bidirectional difference coupling scheme gives much better chaotic synchronization as compared to unidirectional difference coupling but at the cost of higher coupling strength. We also conclude that the coupling scheme and system properties play an important role in determining the type of synchronization exhibited by the system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present study consists of nine chapters including the introductory chapter. Chapter II makes a brief review of environmental literature and examines various measures adopted at the global level to protect the environment. The environmental problems often transgress national sovereignity and geographical boundaries. Therefore, attempts must be made at the national and international levels to protect the environment, the resources of which are the common property of mankind. The protection of the national environment from the ancient till the present forms the content of Chapter III. These chapters together provide a background to understand the issues analysed in the subsequent chapters. Carefully worked out theoretical framework is a pre-requisite for the successful study of a complex subject. Some of the theoretical issues of ‘environomics’ are examined in Chapter IV. The theoretical issues involved in estimating the costs and benefits of environmental protection constitute the theme of Chapter V. The state of environment in Eloor-Edayar Industrial belt andthe impact analysis of pollution of the area are discussed in Chapter VI and VII respectively. Chapter VIII makes the financial estimate of environmental protection of the project And finally, Chapter IX presents the findings of the study