8 resultados para Pedagogic projects

em Cochin University of Science


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Indian marine engineers are renowned for employment globally due to their knowledge, skill and reliability. This praiseworthy status has been achieved mainly due to the systematic training imparted to marine engineering cadets. However, in an era of advancing technology, marine engineering training has to remain dynamic to imbibe latest technology as well as to meet the demands of the shipping industry. New subjects of studies have to be included in the curriculum in a timely manner taking into consideration the industry requirements and best practices in shipping. Technical competence of marine engineers also has to be subjected to changes depending upon the needs of the ever growing and over regulated shipping industry. Besides. certain soft skills are to be developed and improved amongst the marine engineers in order to alter or amend the personality traits leading to their career success.If timely corrective action is taken. Indian marine engineers can be in still greater demand for employment in global maritime field. In order to enhance the employability of our mmine engineers by improving their quality, a study of marine engineers in general and class IV marine engineers in particular was conducted based on three distinct surveys, viz., survey among senior marine engineers, survey among employers of marine engineers and survey of class IV marine engineers themselves.The surveys have been planned and questionnaires have been designed to focus the study of marine engineer officer class IV from the point of view of the three distinct groups of maritime personnels. As a result of this, the strength and weakness of class IV marine engineers are identified with regard to their performance on board ships, acquisition of necessary technical skills. employability and career success. The criteria of essential qualities of a marine engineer are classified as academic, technical, social, psychological. physical, mental, emergency responsive, communicative and leadership, and have been assessed for a practicing marine engineer by statistical analysis of data collected from surveys. These are assessed for class IV marine engineers from the point of view of senior marine engineers and employers separately. The Endings are delineated and graphically depicted in this thesis.Besides. six pertinent personality traits of a marine engineer viz. self esteem. learning style. decision making. motivation. team work and listening self inventory have been subjected to study and their correlation with career success have been established wherever possible. This is carried out to develop a theoretical framework to understand what leads a marine engineer to his career attainment. This enables the author to estimate the personality strengths and weaknesses of a serving marine engineer and eventually to deduce possible corrective measures or modifications in marine engineering training in India.Maritime training is largely based on International Conventions on Standard of Training. Certification and Watch keeping for Seafarers 1995. its associated Code and Merchant Shipping (STCW for Seafarers) Rules 1998. Further, Maritime Education, Training and Assessment (META) Manual was subjected to a critical scrutiny and relevant Endings of thc surveys arc superimposed on the existing rule requirement and curriculum. Views of senior marine engineers and executives of various shipping companies are taken into account before arriving at the revision of syllabus of marine engineering courses. Modifications in the pattern of workshop and sea service for graduate mechanical engineering trainees are recommended. Desirable age brackets of junior engineers and chief engineers. use of Training and Assessment Record book (TAR Book) during training etc. have also been evaluated.As a result of the pedagogic introspection of the existing system of marine engineering training in India. in this thesis, a revised pattern of workshop training of six months duration for graduate mechanical engineers. revised pattern of sea service training of one year duration and modified now diagram incorporating the above have been arrived at. Effects of various personality traits on career success have been established along with certain findings for improvement of desirable personality traits of marine engineers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study has wider policy implications as it identifies the possible variables which influence the sustainability of participatory productive sector projects. The method which is developed to study the sustainability of projects under People’s Planning in Chempu Panchayat could be used for studying the same in other panchayats also. Unlike the case of the standard features of sustainability identified, the independent variables vary according to the nature of the project. Hence, this needs to be modified accordingly while applying the method in a dissimilar domain. Selection of a single panchayat for the present study is relevant on the basis of a common package of inputs for decentralised planning which is forwarded by the State Planning Board respectively for the three-tier panchayat system in Kerala. The dynamic filed realities could be brought out in view of a comprehensive planning approach through an in depth study of specific cases.The assessment of the nature and pattern of productive sector projects in the selected Village Panchayat puts the projects under close scrutiny. The analysis has depended largely on secondary sources of information, especially from panchayat level plan documents, and also on the primary information obtained using direct observation and on-site inspection of project sites. An analysis of the nature and pattem of productive sector projects is important as it gives all necessary information regarding follow-up, monitoring/evaluation and even termination of a particular project. It has also revealed the tendencies of including infrastructure and service sector projects under ‘productive’ category, especially for maintaining the stipulated ratio (40:30:30) of grant-in-aid distribution. The study regarding the allocation and expenditure pattern of plan funds is vital in policy level as it reveals the under-noticed allocation and expenditure pattern of plan funds other than grant-in-aid. One major limitation of the study has been the limited availability of secondary data, especially regarding project-wise expenditure and monitoring/evaluation reports of various project committees.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study aimed to study the evolution and substance of microfinance as a major tool for combating poverty at the global and national level. The development of micro finance in Kerala is briefly discussed. It also indicates the importance and role of microcredit in bringing the poor up in the society through entrepreneurial initiatives. The current trends in the field are also discussed, leading to the need of the present research.