25 resultados para Integrated projects
em Cochin University of Science
Resumo:
The present investigation on the Muvattupuzha river basin is an integrated approach based on hydrogeological, geophysical, hydrogeochemical parameters and the results are interpreted using satellite data. GIS also been used to combine the various spatial and non-spatial data. The salient finding of the present study are accounted below to provide a holistic picture on the groundwaters of the Muvattupuzha river basin. In the Muvattupuzha river basin the groundwaters are drawn from the weathered and fractured zones. The groundwater level fluctuations of the basin from 1992 to 2001 reveal that the water level varies between a minimum of 0.003 m and a maximum of 3.45 m. The groundwater fluctuation is affected by rainfall. Various aquifer parameters like transmissivity, storage coefficient, optimum yield, time for full recovery and specific capacity indices are analyzed. The depth to the bedrock of the basin varies widely from 1.5 to 17 mbgl. A ground water prospective map of phreatic aquifer has been prepared based on thickness of the weathered zone and low resistivity values (<500 ohm-m) and accordingly the basin is classified in three phreatic potential zones as good, moderate and poor. The groundwater of the Muvattupuzha river basin, the pH value ranges from 5.5 to 8.1, in acidic nature. Hydrochemical facies diagram reveals that most of the samples in both the seasons fall in mixing and dissolution facies and a few in static and dynamic natures. Further study is needed on impact of dykes on the occurrence and movement of groundwater, impact of seapages from irrigation canals on the groundwater quality and resources of this basin, and influence of inter-basin transfer of surface water on groundwater.
Resumo:
The present study focuses on the stability of the coast, exploitation of the coastal resources, human activities within the study are that extends from Fort Cochin at north to Thottappally at south, central Kerala State and hinterlands, socio-economic problems of the coastal community and the environmental issues arising in the recent past due to human activities. The objective of the study is critically analyse the coastal zone region and prevailing situation and to propose a comprehensive management plan for the sustainable development of the region under study. The thesis covers varied aspects of coastal uses like fisheries, tourism, land use, water resources etc. To critically examine the above scenarios, the ILWIS (Integrated Land and Water Information Systems) – GIS software has been used. A satellite image of the area has been used for the coastline change detection and land use patterns. The outcome of the present study will be beneficial to the various stakeholders within the coastal region and its hinterlands. To further add, this study should find better applications to similar or near-similar situations of Southeast Asia where identical scenarios are noticeable.
Resumo:
compact microstrip antenna integrated with an amplifier having an area reduction of 70%, compared to the standard circular microstrip patch antenna, is presented. The antenna also provides an enhanced gain of 10-dB more than its passive counter part. The measured 2:1 VSWR band width is -4% at 790 MHz, which is 2.5 times larger than that of the passive microstrip antenna
Resumo:
novel design of at internal PIFA integrated with an RF-shielding metal case for application in a clamshell or fielder-tvpe mobile phone is presented. The integrated PIFA has a bent and tapered radiating arm in order to easily fit in the casing of the clamshell mobile phone as an internal antenna. The integrated PlEA can also provide a wide operating bandwidth fir UM7S (1920-2170 MHz) operation. In addition, for the clamshell mobile phone in either the talk or standby condition, only a small effect on the operating bandwidth of the integrated PIFA is obtained. The experimental results of the proposed design are presented
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Resumo:
Upwelling regions occupies only a small portion of the global ocean surface. However it accounts for a large fraction of the oceanic primary production as well as fishery. Therefore understanding and quantifying the upwelling is of great importance for the marine resources management. Most of the coastal upwelling zones in the Arabian Sea are wind driven uniform systems. Mesoscale studies along the southwest coast of India have shown high spatial and temporal variability in the forcing mechanism and intensity of upwelling. There exists an equatorward component of wind stress as similar to the most upwelling zones along the eastern oceanic boundaries. Therefore an offshore component of surface Ekman transport is expected throughout the year. But several studies supported with in situ evidences have revealed that the process is purely recurring on seasonal basis. The explanation merely based on local wind forcing alone is not sufficient to support the observations. So, it is assumed that upwelling along the South Eastern Arabian Sea is an effect of basin wide wind forcing rather than local wind forcing. In the present study an integrated approach has been made to understand the process of upwelling of the South Eastern Arabian Sea. The latitudinal and seasonal variations (based on Sea Surface Temperature, wind forcing, Chlorophyll a and primary production), forcing mechanisms (local wind and remote forcing) and the factors influencing the system (Arabian Sea High Saline Water, Bay of Bengal water, runoff, coastal geomorphology) are addressed herewith.
Resumo:
National Centre for Aquatic Animal Health, Cochin University of Science and Technology
Resumo:
The study has wider policy implications as it identifies the possible variables which influence the sustainability of participatory productive sector projects. The method which is developed to study the sustainability of projects under People’s Planning in Chempu Panchayat could be used for studying the same in other panchayats also. Unlike the case of the standard features of sustainability identified, the independent variables vary according to the nature of the project. Hence, this needs to be modified accordingly while applying the method in a dissimilar domain. Selection of a single panchayat for the present study is relevant on the basis of a common package of inputs for decentralised planning which is forwarded by the State Planning Board respectively for the three-tier panchayat system in Kerala. The dynamic filed realities could be brought out in view of a comprehensive planning approach through an in depth study of specific cases.The assessment of the nature and pattern of productive sector projects in the selected Village Panchayat puts the projects under close scrutiny. The analysis has depended largely on secondary sources of information, especially from panchayat level plan documents, and also on the primary information obtained using direct observation and on-site inspection of project sites. An analysis of the nature and pattem of productive sector projects is important as it gives all necessary information regarding follow-up, monitoring/evaluation and even termination of a particular project. It has also revealed the tendencies of including infrastructure and service sector projects under ‘productive’ category, especially for maintaining the stipulated ratio (40:30:30) of grant-in-aid distribution. The study regarding the allocation and expenditure pattern of plan funds is vital in policy level as it reveals the under-noticed allocation and expenditure pattern of plan funds other than grant-in-aid. One major limitation of the study has been the limited availability of secondary data, especially regarding project-wise expenditure and monitoring/evaluation reports of various project committees.
Resumo:
The present work deals with the An integrated study on the hydrogeology of Bharathapuzha river basin ,south west coast of india. To study the spatial and temporal behaviour of the groundwater system of the Bharathapuzha river basin.To discover the sub-surface parameter by ground resistivity surveys.T o determine the groundwater quality of the Bharathapuzha river basin for the different seasons {pre monsoon and post monsoon with reference to the domestic and irrigational water quality standards.Present study will provide a good database on the hydrogeological aspects within the river basin.The study area covers l7 block Panchayats. Of these, Chitoor block is ‘over exploited’, Kollengode, Trithala, and Palakkad are ‘critical’ in category and Kuttippuram and Sreekrishnapuram blocks are ‘semi critical’ in terms of groundwater development.Comparison of Geomorphology map with drainage map shows that the geomorphology has a clear control on the drainage net work of the basin. The structural hill area shows a highest drainage network, where as pediment shows lowest drainage network.There are many discontinuous lineament in the Bharathapuzha river basin which can be connected by a straight line.Ground water flow directions are generally towards the western portions of the study area. From the northern region Water flows towards the central and also water from the eastern and southern side confluences at the centre and move towards western side of the basin.The positive correlation of transmissivity and storativity values show good aquifer conditions exists in the present study area .
Resumo:
Despite various intervensions, artisanal fishermen remain one of the weaker sections in Kerala's society. Host of the welfare and developmental programmes introduced for them had produced very little impact on their living conditions. Further, they are unable to compete with mechanised sector for fishing. Host of the technological development which had taken place after Indo-Norvegean Project favoured the growth of mechanised sector. As a consequence of this, fishing become unviable for artisanal fishermen who propagate the idea of ” sustainable development” in the fishing industry. It is commonly believed that an integrated approach may help them to improve their living conditions substantially. In the light of the above background the scholar has made an attempt to study the impact of Integrated Marine Fisheries Development Project among artisanal fishermen in Kerala It is realised from the findings of the study that the most important needs of artisanal fishermen arecredit facilities and marketing support. Without marketing linkages effective credit management is not possible. Marketing activities and credit management are interdependent
Resumo:
Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.
Resumo:
The present study is intended to provide a new scientific approach to the solution of the worlds cost engineering problems encountered in the chemical industries in our nation. The problem is that of cost estimation of equipments especially of pressure vessels when setting up chemical industries .The present study attempts to develop a model for such cost estimation. This in turn is hoped would go a long way to solve this and related problems in forecasting the cost of setting up chemical plants.
Resumo:
Poor project planning, implementation and control and the subsequent cost and time overruns are ubiquitous features that have been posing serious concern at all levels - state, national and international. It results in wastage of the nation's scarce resources and retards the socio-economic progress. Although several studies peripheral on project overruns have been made at the national level, no serious attempt has been made at the state level to identify the magnitude of overruns, their causes and impacts on industrial projects. The present study "Time and Cost Overruns of Industrial Projects in Kerala" is an earnest attempt to probe in depth the time and cost overruns and their impact on industrial projects. The study places emphasise on the identification of the real reasons behind the cost and time overruns. It also covers the present project management practices of industrial projects in Kerala.