206 resultados para Stockbridge, Mr. (Francis Brown), 1826-1894.


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of estimate of work done on the Port Dalhousie and Thorold Railway by Messrs. Brown and McDonell, contractors, on sections 1, 2, and 3 ending at St. Catharines for the month of Nov., 1855. This document is water damaged and full of holes. The list of prices is almost completely illegible. The document is signed by S.D. Woodruff, Dec. 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Note stating that John Brown has done grading in the section of railway between Geneva Street and Slabtown. This document is signed by S.D. Woodruff, Dec. 12, 1855.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mr. Woodward’s timetable regarding the suspension bridge to Toronto via the Great Western Railway and Port Dalhousie Railway (1 page, handwritten), Jan. 22, 1856

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Chart of estimate for work done on the Port Dalhousie and Thorold Railway by John Brown, contractor regarding the section between Geneva Street and the Thorold Station up to the 30th of June 1856. This document is burned on the edges. This does not affect the text, 1856

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Port Dalhousie and Thorold Railway wages paid to John Brown (2 pages, handwritten) from Aug. 1855 – May 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Schedule of prices for Brown and McDonell, contractors, for sections 1, 2 and 3 of the Port Dalhousie Thorold Railway (1 page, handwritten), Sept. 24, 1856.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Second copy of the memorandum respecting differences between the approximate and final estimate but this one has “memorandum of extras of Brown and McDonall contract” written on the outer page (3 pages, handwritten), n.d.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pay roll voucher #14 from the Engineer Department of Port Dalhousie and Thorold Railway Extension for the Southern Division for the month of April, 1857 approved by F. Shanly, chief engineer and Francis A. Doyle, assistant engineer, April 28, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pay roll voucher #21 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Southern Division approved by F. Shanly, chief engineer and Francis A. Doyle, assistant engineer (copy) June 29, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pay roll voucher #26 from the Engineer Department of Port Dalhousie and Thorold Railway Extension, for the Southern Division, for the month of July, 1857 approved by F. Shanly, chief engineer and Francis A. Doyle (copy), July 28, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Voucher from the Engineer Department of Port Dalhousie and Thorold Railway Extension to Francis A. Doyle for fees at the Fonthill Registry Office (copy), July 28, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to S.D. Woodruff regarding resolution #5 of the Board of Directors. Mr. Woodruff is requested to take steps to ensure the early completion of the Port Dalhousie and Thorold macadamized road. This is signed by James McCoppen, president. The letter is stained and worn torn in spots. This does not affect the text, July 11, 1857.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

1 handwritten 1 page letter addressed to Mr. Josiah Matlock of Smithville from John Pleddall of Chippawa. Mr. Pleddall states that he has just heard from James Carlaw that George is to sell and move to Boston. William Macklem wants to see him, if he is not gone. There is no mention of George’s last name. It is noted within the body of the letter that the post office is closed and 5 cents are enclosed to pay for the letter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to S.D. Woodruff from Mr. Tisdale stating that William B. Hunter will only pay $60 for shooting for this year. He asks if Mr. Woodruff will accept this. There is a reply at the bottom of the letter in which [S.D. Woodruff] replies that he will not accept $60, but $100 will be acceptable, Sept. 7, 1870.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to Mr. William Leary, steward of the Long Point Company, from S.D. Woodruff regarding the painting of the new building at Long Point (2 ½ pages, handwritten), June 11, 1875.