8 resultados para Engineering Science and Materials

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper analyzes the possibilities of integrating cost information and engineering design. Special emphasis is put on finding the potential of using the activity-based costing (ABC) method. Today, the problem of cost estimation in engineering design is that there are two separate extremes of knowledge. On the one extreme, the engineers model the technical parametres behindcosts in great detail but do not get appropriate cost information to their elegant models. On the other extreme, the accounting professionals are stuck with traditional cost accounting methods driven by the procedures and cycles of financial accounting. Therefore, in many cases, the cost information needs of various decision making groups, for example design engineers, are not served satisfactorily. This paper studies if the activity-based costing (ABC) method could offer a compromise between the two extremes. Recognizing activities and activity chains as well as activity and cost drivers could be specially beneficial for design engineers. Also, recognizing the accurate and reliable product costs of existing products helps when doing variant design. However, ABC is not at its best if the cost system becomes too complicated. This is why a comprehensive ABC-cost information system with detailed cost information for the use of design engineers should be examined critically. ABC is at its best when considering such issues as which activities drive costs, the cost of product complexity, allocating indirect costs on the products, the relationships between processes and costs, and the cost of excess capacity.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this master’s thesis is to study how Agile method (Scrum) and open source software are utilized to produce software for a flagship product in a complex production environment. The empirical case and the used artefacts are taken from the Nokia MeeGo N9 product program, and from the related software program, called as the Harmattan. The single research case is analysed by using a qualitative method. The Grounded Theory principles are utilized, first, to find out all the related concepts from artefacts. Second, these concepts are analysed, and finally categorized to a core category and six supported categories. The result is formulated as the operation of software practices conceivable in circumstances, where the accountable software development teams and related context accepts a open source software nature as a part of business vision and the whole organization supports the Agile methods.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Presentation at the Nordic Perspectives on Open Access and Open Science seminar, Helsinki, October 15, 2013

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Presentation of Kristiina Hormia-Poutanen at the 25th Anniversary Conference of The National Repository Library of Finland, Kuopio 22th of May 2015.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this Master’s Thesis is to develop project logistics functions in large scale en-gineering, procurement and construction projects. The background of the research topic is compounded from two separate subjects; OPAL Program and case study of an actual EPC project. The purpose is to examine Project Logistics process in accordance with OPAL Program as well as logistics process in focus EPC project. Both entities are researched by using the case study research methodology. Logistics process of the focus EPC project is described as well as presented and in addi-tion, logistics related findings and observations are introduced. Significant findings and observations are found from logistics costs as well as shipment volume estimations in the early phase of the focus ECP project. A notable finding is also that because goods were transported as readily assembled as possible it caused expensive oversized cargo deliveries. From findings and observation of the focus EPC project it can be derived that logistics has to be involved in the early sales phase in order to receive more accurate logistics cost esti-mations for project deliveries. It is also noticed that in order to obtain savings in logistics costs, oversized deliveries must be avoided.