In mathematical modeling the estimation of the model parameters is one of the most common problems. The goal is to seek parameters that fit to the measurements as well as possible. There is always error in the measurements which implies uncertainty to the model estimates. In Bayesian statistics all the unknown quantities are presented as probability distributions. If there is knowledge about parameters beforehand, it can be formulated as a prior distribution. The Bays’ rule combines the prior and the measurements to posterior distribution. Mathematical models are typically nonlinear, to produce statistics for them requires efficient sampling algorithms. In this thesis both Metropolis-Hastings (MH), Adaptive Metropolis (AM) algorithms and Gibbs sampling are introduced. In the thesis different ways to present prior distributions are introduced. The main issue is in the measurement error estimation and how to obtain prior knowledge for variance or covariance. Variance and covariance sampling is combined with the algorithms above. The examples of the hyperprior models are applied to estimation of model parameters and error in an outlier case.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mitosis is under the stringent quality control of the spindle assembly checkpoint (SAC). However, in cancer cells this control can fail, leading to excessive cellular proliferation and ultimately to the formation of a tumor. Novel cancer cell selective therapies are needed to stop the uncontrolled cell proliferation and tumor growth. The aim of the research presented in this thesis was to identify microRNAs (miRNAs) that could play a role in cancer cell proliferation as well as low molecular weight (LMW) compounds that could interfere with cell division. The findings could be used to develop better cancer diagnostics and therapies in the future. First, a high-throughput screen (HTS) was performed to identify LMW compounds that possess a similar chemical interaction field as rigosertib, an anti-cancer compound undergoing clinical trials. A compound termed Centmitor-1 was discovered that phenocopied the cellular impact of rigosertib by affecting the microtubule dynamics. Next, another HTS aimed at identifying compounds that would target the Hec1 protein, which mediates the interaction between spindle microtubules and chromosomes. Perturbation of this connection should prevent cell division and induce cell death. A compound termed VTT-006 was discovered that abrogated mitosis in several cell line models and exhibited binding to Hec1 in vitro. Lastly, using a cell-based HTS two miRNAs were identified that affected cancer cell proliferation via Aurora B kinase, which is an important mitotic regulator. MiR-378a-5p was found to indirectly suppress the production of the kinase whereas let-7b showed direct binding to the 3’UTR of Aurora B mRNA and repressed its translation. The miRNA-mediated perturbation of Aurora B induced defects in mitosis leading to abnormal chromosome segregation and induction of aneuploidy. The results of this thesis provide new information on miRNA signaling in cancer, which could be utilized for diagnostic purposes. Moreover, the thesis introduces two small compounds that may benefit future drug research.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Communications play a key role in modern smart grids. New functionalities that make the grids ‘smart’ require the communication network to function properly. Data transmission between intelligent electric devices (IEDs) in the rectifier and the customer-end inverters (CEIs) used for power conversion is also required in the smart grid concept of the low-voltage direct current (LVDC) distribution network. Smart grid applications, such as smart metering, demand side management (DSM), and grid protection applied with communications are all installed in the LVDC system. Thus, besides remote connection to the databases of the grid operators, a local communication network in the LVDC network is needed. One solution applied to implement the communication medium in power distribution grids is power line communication (PLC). There are power cables in the distribution grids, and hence, they may be applied as a communication channel for the distribution-level data. This doctoral thesis proposes an IP-based high-frequency (HF) band PLC data transmission concept for the LVDC network. A general method to implement the Ethernet-based PLC concept between the public distribution rectifier and the customerend inverters in the LVDC grid is introduced. Low-voltage cables are studied as the communication channel in the frequency band of 100 kHz–30 MHz. The communication channel characteristics and the noise in the channel are described. All individual components in the channel are presented in detail, and a channel model, comprising models for each channel component is developed and verified by measurements. The channel noise is also studied by measurements. Theoretical signalto- noise ratio (SNR) and channel capacity analyses and practical data transmission tests are carried out to evaluate the applicability of the PLC concept against the requirements set by the smart grid applications in the LVDC system. The main results concerning the applicability of the PLC concept and its limitations are presented, and suggestion for future research proposed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The research of power-line communications has been concentrated on home automation, broadband indoor communications and broadband data transfer in a low voltage distribution network between home andtransformer station. There has not been carried out much research work that is focused on the high frequency characteristics of industrial low voltage distribution networks. The industrial low voltage distribution network may be utilised as a communication channel to data transfer required by the on-line condition monitoring of electric motors. The advantage of using power-line data transfer is that it does not require the installing of new cables. In the first part of this work, the characteristics of industrial low voltage distribution network components and the pilot distribution network are measured and modelled with respect topower-line communications frequencies up to 30 MHz. The distributed inductances, capacitances and attenuation of MCMK type low voltage power cables are measured in the frequency band 100 kHz - 30 MHz and an attenuation formula for the cables is formed based on the measurements. The input impedances of electric motors (15-250 kW) are measured using several signal couplings and measurement based input impedance model for electric motor with a slotted stator is formed. The model is designed for the frequency band 10 kHz - 30 MHz. Next, the effect of DC (direct current) voltage link inverter on power line data transfer is briefly analysed. Finally, a pilot distribution network is formed and signal attenuation in communication channels in the pilot environment is measured. The results are compared with the simulations that are carried out utilising the developed models and measured parameters for cables and motors. In the second part of this work, a narrowband power-line data transfer system is developed for the data transfer ofon-line condition monitoring of electric motors. It is developed using standardintegrated circuits. The system is tested in the pilot environment and the applicability of the system for the data transfer required by the on-line condition monitoring of electric motors is analysed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Electricity distribution network operation (NO) models are challenged as they are expected to continue to undergo changes during the coming decades in the fairly developed and regulated Nordic electricity market. Network asset managers are to adapt to competitive technoeconomical business models regarding the operation of increasingly intelligent distribution networks. Factors driving the changes for new business models within network operation include: increased investments in distributed automation (DA), regulative frameworks for annual profit limits and quality through outage cost, increasing end-customer demands, climatic changes and increasing use of data system tools, such as Distribution Management System (DMS). The doctoral thesis addresses the questions a) whether there exist conditions and qualifications for competitive markets within electricity distribution network operation and b) if so, identification of limitations and required business mechanisms. This doctoral thesis aims to provide an analytical business framework, primarily for electric utilities, for evaluation and development purposes of dedicated network operation models to meet future market dynamics within network operation. In the thesis, the generic build-up of a business model has been addressed through the use of the strategicbusiness hierarchy levels of mission, vision and strategy for definition of the strategic direction of the business followed by the planning, management and process execution levels of enterprisestrategy execution. Research questions within electricity distribution network operation are addressed at the specified hierarchy levels. The results of the research represent interdisciplinary findings in the areas of electrical engineering and production economics. The main scientific contributions include further development of the extended transaction cost economics (TCE) for government decisions within electricity networks and validation of the usability of the methodology for the electricity distribution industry. Moreover, DMS benefit evaluations in the thesis based on the outage cost calculations propose theoretical maximum benefits of DMS applications equalling roughly 25% of the annual outage costs and 10% of the respective operative costs in the case electric utility. Hence, the annual measurable theoretical benefits from the use of DMS applications are considerable. The theoretical results in the thesis are generally validated by surveys and questionnaires.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The focus in this thesis is to study both technical and economical possibilities of novel on-line condition monitoring techniques in underground low voltage distribution cable networks. This thesis consists of literature study about fault progression mechanisms in modern low voltage cables, laboratory measurements to determine the base and restrictions of novel on-line condition monitoring methods, and economic evaluation, based on fault statistics and information gathered from Finnish distribution system operators. This thesis is closely related to master’s thesis “Channel Estimation and On-line Diagnosis of LV Distribution Cabling”, which focuses more on the actual condition monitoring methods and signal theory behind them.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Recent Storms in Nordic countries were a reason of long power outages in huge territories. After these disasters distribution networks' operators faced with a problem how to provide adequate quality of supply in such situation. The decision of utilization cable lines rather than overhead lines were made, which brings new features to distribution networks. The main idea of this work is a complex analysis of medium voltage distribution networks with long cable lines. High value of cable’s specific capacitance and length of lines determine such problems as: high values of earth fault currents, excessive amount of reactive power flow from distribution to transmission network, possibility of a high voltage level at the receiving end of cable feeders. However the core tasks was to estimate functional ability of the earth fault protection and the possibility to utilize simplified formulas for operating setting calculations in this network. In order to provide justify solution or evaluation of mentioned above problems corresponding calculations were made and in order to analyze behavior of relay protection principles PSCAD model of the examined network have been created. Evaluation of the voltage rise in the end of a cable line have educed absence of a dangerous increase in a voltage level, while excessive value of reactive power can be a reason of final penalty according to the Finish regulations. It was proved and calculated that for this networks compensation of earth fault currents should be implemented. In PSCAD models of the electrical grid with isolated neutral, central compensation and hybrid compensation were created. For the network with hybrid compensation methodology which allows to select number and rated power of distributed arc suppression coils have been offered. Based on the obtained results from experiments it was determined that in order to guarantee selective and reliable operation of the relay protection should be utilized hybrid compensation with connection of high-ohmic resistor. Directional and admittance based relay protection were tested under these conditions and advantageous of the novel protection were revealed. However, for electrical grids with extensive cabling necessity of a complex approach to the relay protection were explained and illustrated. Thus, in order to organize reliable earth fault protection is recommended to utilize both intermittent and conventional relay protection with operational settings calculated by the use of simplified formulas.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The regulation of electricity transmission and distribution business is an essential issue for any electricity market; it is widely introduced in developed electricity markets of Great Britain, Scandinavian countries and United States of America and other. Those markets which were liberalized recently also need well planned regulation model to be chosen and implemented. In open electricity markets the sectors of electricity distribution and transmission remain monopolies, so called "natural monopolies", as introducing the competition into these sectors in most cases appears to be inefficient. Thatis why regulation becomes very important as its main tasks are: to set reasonable tariffs for customers, to ensure non-discriminating process of electricity transmission and distribution, at the same time to provide distribution companies with incentives to operate efficiently and the owners of the companies with reasonable profits as well; the problem of power quality should be solved at the same time. It should be mentioned also, that there is no incentive scheme which will be suitable for any conditions, that is why it is essential to study differentregulation models in order to form the best one for concrete situation. The aim of this Master's Thesis is to give an overview over theregulation of electricity transmission and distribution in Russia. First, the general information about theory of regulation of natural monopolies will be described; the situation in Russian network business and the importance of regulation process for it will be discussed next. Then there is a detailed description ofexisting regulatory system and the process of tariff calculation with an example. And finally, in the work there is a brief analysis of problems of present scheme of regulation, an attempt to predict the following development of regulationin Russia and the perspectives and risks connected to regulation which could face the companies that try to enter Russian electricity market (such as FORTUM OY).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tutkielman tavoitteena oli osoittaa minkälaisia vaikutuksia työnantajan sivukulujen poisto toisi työllisyyteen. Tutkielman empiirinen osio toteutettiin survey-tutkimuksella. Tämä toteutettiin postikyselyllä, jossa 810 Etelä-Karjalalaiselle yritykselle lähetettiin joulukuussa 2004 kyselylomake. Kyselyyn vastanneiden yritysten määrä oli 141 ja vastausprosentti oli 17. Vastanneiden yritysten toimialajakauma vastasi koko Etelä-Karjalan alueen yritysten toimialajakaumaa, jossa suurimpana toimialana oli eri palvelualan yritykset. Tutkielma eroaa aikaisemminista työllisyyden parantamiseksi esitetyistä malleista. Ensimmäineneroavaisuus on sivukulujen poistaminen yrityksiltä kokonaan eikä vain muutamilla prosenttiyksiköillä. Toinen eroavaisuus on sivukulujen poiston kohdistamisessavain niille yrityksille, joilla työllistävyys kasvaa merkittävästi. Näiden tarkoituksena on maksimoida työllisyysvaikutukset ja vaikuttaa aiheutuneiden kustannusten minimointiin tai kustannusten korvaantumiseen täysimääräisesti. Asetetut tavoitteet voidaan saavuttaa kohdistamalla sivukulujen poisto vain niihin yrityksiin, jotka työllistävät alle 5 henkilöä. Näiden yritysten kohdalla mahdollistuvauusien työntekijöiden määrä nousee keskimäärin 36 prosentilla. Tämä merkitsee laskelmien mukaan sitä, että sivululujen poiston aiheuttama sosiaalivakuutusmaksujen väheneminen korvaantuu vanhojen ja uusien työntekijöiden maksamilla tuloveroilla ja vähentyvillä työttömyyskorvauksilla. Uusien työpaikkojen kasvu merkitseeEtelä-Karjalan työttömyysprosentin laskua yli 4 prosenttiyksiköllä.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In distributed energy production, permanent magnet synchronous generators (PMSG) are often connected to the grid via frequency converters, such as voltage source line converters. The price of the converter may constitute a large part of the costs of a generating set. Some of the permanent magnet synchronous generators with converters and traditional separately excited synchronous generators couldbe replaced by direct-on-line (DOL) non-controlled PMSGs. Small directly networkconnected generators are likely to have large markets in the area of distributed electric energy generation. Typical prime movers could be windmills, watermills and internal combustion engines. DOL PMSGs could also be applied in island networks, such as ships and oil platforms. Also various back-up power generating systems could be carried out with DOL PMSGs. The benefits would be a lower priceof the generating set and the robustness and easy use of the system. The performance of DOL PMSGs is analyzed. The electricity distribution companies have regulations that constrain the design of the generators being connected to the grid. The general guidelines and recommendations are applied in the analysis. By analyzing the results produced by the simulation model for the permanent magnet machine, the guidelines for efficient damper winding parameters for DOL PMSGs are presented. The simulation model is used to simulate grid connections and load transients. The damper winding parameters are calculated by the finite element method (FEM) and determined from experimental measurements. Three-dimensional finite element analysis (3D FEA) is carried out. The results from the simulation model and 3D FEA are compared with practical measurements from two prototype axial flux permanent magnet generators provided with damper windings. The dimensioning of the damper winding parameters is case specific. The damper winding should be dimensioned based on the moment of inertia of the generating set. It is shown that the damper winding has optimal values to reach synchronous operation in the shortest period of time after transient operation. With optimal dimensioning, interferenceon the grid is minimized.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tämä työ luo katsauksen ajallisiin ja stokastisiin ohjelmien luotettavuus malleihin sekä tutkii muutamia malleja käytännössä. Työn teoriaosuus sisältää ohjelmien luotettavuuden kuvauksessa ja arvioinnissa käytetyt keskeiset määritelmät ja metriikan sekä varsinaiset mallien kuvaukset. Työssä esitellään kaksi ohjelmien luotettavuusryhmää. Ensimmäinen ryhmä ovat riskiin perustuvat mallit. Toinen ryhmä käsittää virheiden ”kylvöön” ja merkitsevyyteen perustuvat mallit. Työn empiirinen osa sisältää kokeiden kuvaukset ja tulokset. Kokeet suoritettiin käyttämällä kolmea ensimmäiseen ryhmään kuuluvaa mallia: Jelinski-Moranda mallia, ensimmäistä geometrista mallia sekä yksinkertaista eksponenttimallia. Kokeiden tarkoituksena oli tutkia, kuinka syötetyn datan distribuutio vaikuttaa mallien toimivuuteen sekä kuinka herkkiä mallit ovat syötetyn datan määrän muutoksille. Jelinski-Moranda malli osoittautui herkimmäksi distribuutiolle konvergaatio-ongelmien vuoksi, ensimmäinen geometrinen malli herkimmäksi datan määrän muutoksille.