9 resultados para Cable-stayed bridges.

em Doria (National Library of Finland DSpace Services) - National Library of Finland, Finland


Relevância:

20.00% 20.00%

Publicador:

Resumo:

During spermatogenesis, different genes are expressed in a strictly coordinated fashion providing an excellent model to study cell differentiation. Recent identification of testis specific genes and the development of green fluorescence protein (GFP) transgene technology and an in vivo system for studying the differentiation of transplanted male germ cells in infertile testis has opened new possibilities for studying the male germ cell differentiation at molecular level. We have employed these techniques in combination with transillumination based stage recognition (Parvinen and Vanha-Perttula, 1972) and squash preparation techniques (Parvinen and Hecht, 1981) to study the regulation of male germ cell differentiation. By using transgenic mice expressing enhanced-(E)GFP as a marker we have studied the expression and hormonal regulation of beta-actin and acrosin proteins in the developmentally different living male germ cells. Beta-actin was demonstrated in all male germ cells, whereas acrosin was expressed only in late meiotic and in postmeiotic cells. Follicle stimulating hormone stimulated b-actin-EGFP expression at stages I-VI and enhanced the formation of microtubules in spermatids and this way reduced the size of the acrosomic system. When EGFP expressing spermatogonial stem cells were transplanted into infertile mouse testis differentiation and the synchronized development of male germ cells could be observed during six months observation time. Each colony developed independently and maintained typical stage-dependent cell associations. Furthermore, if more than two colonies were fused, each of them was adjusted to one stage and synchronized. By studying living spermatids we were able to demonstrate novel functions for Golgi complex and chromatoid body in material sharing between neighbor spermatids. Immunosytochemical analyses revealed a transport of haploid cell specific proteins in spermatids (TRA54 and Shippo1) and through the intercellular bridges (TRA54). Cytoskeleton inhibitor (nocodazole) demonstrated the importance of microtubules in material sharing between spermatids and in preserving the integrity of the chromatoid body. Golgi complex inhibitor, brefeldin A, revealed the great importance of Golgi complex i) in acrosomic system formation ii) TRA54 translation and in iii) granule trafficking between spermatids.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nowadays typical motor junction boxes do not incorporate cable glands, which would provide good electrical performance interms of electromagnetic compatibility. In this paper, a manufacturability and assembly analysis for the new construction of a rigid body feeder cable junction of an electric motor is presented especially for converter drives (practical tests were carried out at LUT during 2007). Although the cable junction should also clamp the cable to provide enough tensile strength, the phase conductors should not get squashed by the groundingconnection. In order to ensure good performance in an electrical mean especially in converter drives, the grounding of the cable should be connected 360 degrees around the cable. In this paper, following manufacturing technologies are discussed: traditional turning, precision and centrifugal casting, and rotation moulding. DFM(A)-aspects are presented in detail.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The demand for electricity is constantly growing in contemporary world and, in the same time, quality and reliability requirements are becoming more rigid. In addition, renewable sources of energy have been widely introduced for power generation, and they create specific challenges for the network. Consequently, new solution for distribution system is required, and Low Voltage Direct Current (LVDC) system is the proposed one. This thesis focuses on the investigation of specific cable features for low voltage direct current (LVDC) distribution system. The LVDC system is public ±750 VDC distribution system, which is currently being developed at Lappeen-ranta University of Technology. The aspects, considered in the thesis, are reliable and economic power transmission in distribution networks and possible power line communication in the LVDC cable.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of this master’s thesis is to develop an algorithm to calculate the cable network for heat and power station CHGRES. This algorithm includes important aspect which has an influence on the cable network reliability. Moreover, according to developed algorithm, the optimal solution for modernization cable system from economical and technical point of view was obtained. The conditions of existing cable lines show that replacement is necessary. Otherwise, the fault situation would happen. In this case company would loss not only money but also its prestige. As a solution, XLPE single core cables are more profitable than other types of cable considered in this work. Moreover, it is presented the dependence of value of short circuit current on number of 10/110 kV transformers connected in parallel between main grid and considered 10 kV busbar and how it affects on final decision. Furthermore, the losses of company in power (capacity) market due to fault situation are presented. These losses are commensurable with investment to replace existing cable system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The overriding aim of this drama educational case study is to deepen the understanding of meaning making in a creative intercultural youth theatre process and to examine it in the context of the 10th European Children's TheatreEncounter. The research task is to give a theoretical description of some key features of a creative drama process as the basis for theory about meaning makingin physical theatre. The first task is to illuminate the culture-historical connections of the multilayered practice of the EDERED-association. The second taskis to analyse and interpret theatrical meaning making. The ethnographical research site is regarded as a theatrical event. The analysis of the theatrical eventis divided into four segments: cultural contexts, contextual theatricality, theatrical playing and playing culture. These segments are connected with four research questions: What are the cultural contexts of a creative drama process? How can the organisation of the Encounter, genres, aesthetic codes and perception ofcodes be seen to influence the lived experiences of the participants? What are some of the key phases and characteristics in a creative practice? What kind of cultural learning can be interpreted from the performance texts? The interpretative question concerns identity and community (re)construction. How are the categories, `community´ and `child´ constructed in the Encounter culture? In this drama educational case study the research material (transcribed interviews, coded questionnaire answers, participant drawings, videotaped process text and performance texts) are examined in a multi-method analysis in the meta-theoretical framework of Dewey's naturalistic pragmatism. A three-dimensional research interest through a combination of lived experiences, social contexts and cultural-aesthetical practices compared with drama-educational practices required the methodological project of cultural studies. Furthermore, the critical interpretation of cultural texts is divided into three levels of analyses which are called description, structural analysis and theoretical interpretation. Dialogic validity (truthfulness, self-reflexivity and polyvocality) is combined with contextual validity (sensitivity to social context and awareness of historicity) and with deconstructive validity (awareness of the social discourses). My research suggests that itis possible, by means of physical theatre, to construct symbolic worlds where questions about intercultural identity and multilingual community are examined and where provisional answers are constructed in social interaction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent Storms in Nordic countries were a reason of long power outages in huge territories. After these disasters distribution networks' operators faced with a problem how to provide adequate quality of supply in such situation. The decision of utilization cable lines rather than overhead lines were made, which brings new features to distribution networks. The main idea of this work is a complex analysis of medium voltage distribution networks with long cable lines. High value of cable’s specific capacitance and length of lines determine such problems as: high values of earth fault currents, excessive amount of reactive power flow from distribution to transmission network, possibility of a high voltage level at the receiving end of cable feeders. However the core tasks was to estimate functional ability of the earth fault protection and the possibility to utilize simplified formulas for operating setting calculations in this network. In order to provide justify solution or evaluation of mentioned above problems corresponding calculations were made and in order to analyze behavior of relay protection principles PSCAD model of the examined network have been created. Evaluation of the voltage rise in the end of a cable line have educed absence of a dangerous increase in a voltage level, while excessive value of reactive power can be a reason of final penalty according to the Finish regulations. It was proved and calculated that for this networks compensation of earth fault currents should be implemented. In PSCAD models of the electrical grid with isolated neutral, central compensation and hybrid compensation were created. For the network with hybrid compensation methodology which allows to select number and rated power of distributed arc suppression coils have been offered. Based on the obtained results from experiments it was determined that in order to guarantee selective and reliable operation of the relay protection should be utilized hybrid compensation with connection of high-ohmic resistor. Directional and admittance based relay protection were tested under these conditions and advantageous of the novel protection were revealed. However, for electrical grids with extensive cabling necessity of a complex approach to the relay protection were explained and illustrated. Thus, in order to organize reliable earth fault protection is recommended to utilize both intermittent and conventional relay protection with operational settings calculated by the use of simplified formulas.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This final project was made for the Broadband/Implementation department of TeliaSonera Finland. The question to be examined is if the operator should replace multiple ADSL connections implemented over a leased line with Multi-Dwelling access based on an Ethernet/Optical Fibre access network. The project starts with describing the technology related to these access network solu-tions and presents the technology that is used in TeliaSonera Finland's access network. It continues from the technology to describe the problem with some of the ADSL implemen-tations of TeliaSonera. The problem is the implementations done over a leased line that can cost TeliaSonera over years as much as a possible investment to extend network when there is several lines leased to the same building. The project proposes a Multi-Dwelling access as a solution to this problem and defines the circumstances when to use it. After a satisfactory solution has found the project takes a view how implementation of the solution might alter the network and a new problem is found. When used commonly to replace need of ADSL implementation Multi-Dwelling access would significantly increase optical cable congestion near operators POP. As a final deed this project also proposes a technical change to existing way to implement multi-dwelling access with EPON technology.