78 resultados para Stochastic Translog Cost Frontier


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this Master’s thesis is to develop a cost allocation model for a leading food industry company in Finland. The goal is to develop an allocation method for fixed overhead expenses produced in a specific production unit and create a plausible tracking system for product costs. The second objective is to construct an allocation model and modify the created model to be suited for other units as well. Costs, activities, drivers and appropriate allocation methods are studied. This thesis is started with literature review of existing theory of ABC, inspecting cost information and then conducting interviews with officials to get a general view of the requirements for the model to be constructed. The familiarization of the company started with becoming acquainted with the existing cost accounting methods. The main proposals for a new allocation model were revealed through interviews, which were utilized in setting targets for developing the new allocation method. As a result of this thesis, an Excel-based model is created based on the theoretical and empiric data. The new system is able to handle overhead costs in more detail improving the cost awareness, transparency in cost allocations and enhancing products’ cost structure. The improved cost awareness is received by selecting the best possible cost drivers for this situation. Also the capacity changes are taken into consideration, such as usage of practical or normal capacity instead of theoretical is suggested to apply. Also some recommendations for further development are made about capacity handling and cost collection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Electrical machine drives are the most electrical energy-consuming systems worldwide. The largest proportion of drives is found in industrial applications. There are, however many other applications that are also based on the use of electrical machines, because they have a relatively high efficiency, a low noise level, and do not produce local pollution. Electrical machines can be classified into several categories. One of the most commonly used electrical machine types (especially in the industry) is induction motors, also known as asynchronous machines. They have a mature production process and a robust rotor construction. However, in the world pursuing higher energy efficiency with reasonable investments not every application receives the advantage of using this type of motor drives. The main drawback of induction motors is the fact that they need slipcaused and thus loss-generating current in the rotor, and additional stator current for magnetic field production along with the torque-producing current. This can reduce the electric motor drive efficiency, especially in low-speed, low-power applications. Often, when high torque density is required together with low losses, it is desirable to apply permanent magnet technology, because in this case there is no need to use current to produce the basic excitation of the machine. This promotes the effectiveness of copper use in the stator, and further, there is no rotor current in these machines. Again, if permanent magnets with a high remanent flux density are used, the air gap flux density can be higher than in conventional induction motors. These advantages have raised the popularity of PMSMs in some challenging applications, such as hybrid electric vehicles (HEV), wind turbines, and home appliances. Usually, a correctly designed PMSM has a higher efficiency and consequently lower losses than its induction machine counterparts. Therefore, the use of these electrical machines reduces the energy consumption of the whole system to some extent, which can provide good motivation to apply permanent magnet technology to electrical machines. However, the cost of high performance rare earth permanent magnets in these machines may not be affordable in many industrial applications, because the tight competition between the manufacturers dictates the rules of low-cost and highly robust solutions, where asynchronous machines seem to be more feasible at the moment. Two main electromagnetic components of an electrical machine are the stator and the rotor. In the case of a conventional radial flux PMSM, the stator contains magnetic circuit lamination and stator winding, and the rotor consists of rotor steel (laminated or solid) and permanent magnets. The lamination itself does not significantly influence the total cost of the machine, even though it can considerably increase the construction complexity, as it requires a special assembly arrangement. However, thin metal sheet processing methods are very effective and economically feasible. Therefore, the cost of the machine is mainly affected by the stator winding and the permanent magnets. The work proposed in this doctoral dissertation comprises a description and analysis of two approaches of PMSM cost reduction: one on the rotor side and the other on the stator side. The first approach on the rotor side includes the use of low-cost and abundant ferrite magnets together with a tooth-coil winding topology and an outer rotor construction. The second approach on the stator side exploits the use of a modular stator structure instead of a monolithic one. PMSMs with the proposed structures were thoroughly analysed by finite element method based tools (FEM). It was found out that by implementing the described principles, some favourable characteristics of the machine (mainly concerning the machine size) will inevitable be compromised. However, the main target of the proposed approaches is not to compete with conventional rare earth PMSMs, but to reduce the price at which they can be implemented in industrial applications, keeping their dimensions at the same level or lower than those of a typical electrical machine used in the industry at the moment. The measurement results of the prototypes show that the main performance characteristics of these machines are at an acceptable level. It is shown that with certain specific actions it is possible to achieve a desirable efficiency level of the machine with the proposed cost reduction methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Transportation plays a major role in the gross domestic product of various nations. There are, however, many obstacles hindering the transportation sector. Cost-efficiency along with proper delivery times, high frequency and reliability are not a straightforward task. Furthermore, environmental friendliness has increased the importance of the whole transportation sector. This development will change roles inside the transportation sector. Even now, but especially in the future, decisions regarding the transportation sector will be partly based on emission levels and other externalities originating from transportation in addition to pure transportation costs. There are different factors, which could have an impact on the transportation sector. IMO’s sulphur regulation is estimated to increase the costs of short sea shipping in the Baltic Sea. Price development of energy could change the roles of different transport modes. Higher awareness of the environmental impacts originating from transportation could also have an impact on the price level of more polluting transport modes. According to earlier research, increased inland transportation, modal shift and slowsteaming can be possible results of these changes in the transportation sector. Possible changes in the transportation sector and ways to settle potential obstacles are studied in this dissertation. Furthermore, means to improve cost-efficiency and to decrease environmental impacts originating from transportation are researched. Hypothetical Finnish dry port network and Rail Baltica transport corridor are studied in this dissertation. Benefits and disadvantages are studied with different methodologies. These include gravitational models, which were optimized with linear integer programming, discrete-event and system dynamics simulation, an interview study and a case study. Geographical focus is on the Baltic Sea Region, but the results can be adapted to other geographical locations with discretion. Results indicate that the dry port concept has benefits, but optimization regarding the location and the amount of dry ports plays an important role. In addition, the utilization of dry ports for freight transportation should be carefully operated, since only a certain amount of total freight volume can be cost-efficiently transported through dry ports. If dry ports are created and located without proper planning, they could actually increase transportation costs and delivery times of the whole transportation system. With an optimized dry port network, transportation costs can be lowered in Finland with three to five dry ports. Environmental impacts can be lowered with up to nine dry ports. If more dry ports are added to the system, the benefits become very minor, i.e. payback time of investments becomes extremely long. Furthermore, dry port network could support major transport corridors such as Rail Baltica. Based on an analysis of statistics and interview study, there could be enough freight volume available for Rail Baltica, especially, if North-West Russia is part of the Northern end of the corridor. Transit traffic to and from Russia (especially through the Baltic States) plays a large role. It could be possible to increase transit traffic through Finland by connecting the potential Finnish dry port network and the studied transport corridor. Additionally, sulphur emission regulation is assumed to increase the attractiveness of Rail Baltica in the year 2015. Part of the transit traffic could be rerouted along Rail Baltica instead of the Baltic Sea, since the price level of sea transport could increase due to the sulphur regulation. Both, the hypothetical Finnish dry port network and Rail Baltica transport corridor could benefit each other. The dry port network could gain more market share from Russia, but also from Central Europe, which is the other end of Rail Baltica. In addition, further Eastern countries could also be connected to achieve higher potential freight volume by rail.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the industry of the case company, transportation and warehousing costs account for more than 10% of the total cost which is more than on average. A Finnish company has an understanding that by sending larger shipments in parcels, they could save tens of thousands of euros annually in freight costs in Finland’s domestic shipments. To achieve these savings and optimize total logistics cost, company’s interest is to find out which is the cost efficient way of shipping road shipments of certain volumes; in parcel boxes or on pallets, and what should be the split volume determining the shipment type. Distribution center (DC) costs affect this decision and therefore they need to be also evaluated to determine the total logistics cost savings. Main results were achieved by executing activity-based costing-calculations including DC and road freight costs to determine the ideal split volume with which the total logistics cost is optimal. Calculations were done for Finland’s DC, separately for two main road freight destinations, Finland and Sweden, which cover 50% of road shipment spend. Data for calculations was collected both manually and automatically from various internal and external sources, such as the company ERP system and logistics service providers’ (LSP) reporting. DC processes were studied in practice and compared to model processes. Currently used freight rates were compared to existing pricing models and freight service tendering process was evaluated by participating in the process and comparing it to the models based on literature. The results show that the potential savings are not as significant as the company hoped for, mainly because of packing work increasing DC labor cost. Annual savings by setting ideal split volume per country would account for 0,4 % of the warehousing and transportation costs of shipments in scope of this thesis. Split volume should be set separately for each route, mainly because the pricing model for road freight is different in each country. For some routes bigger parcels should be sent but for some routes pallets should be used more. Next step is to do these calculations for remaining routes to determine total savings potential. Other findings show that the processes in the DC are designed well and the company could achieve savings by executing tenders more efficiently. Company should also pay more attention to parcel pricing and packing the shipments accordingly.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Target of this study was to develop a total cost calculation model to compare all costs from manufacturing and logistics from own factories or from partner factories to global distribution centers in a case company. Especially the total cost calculation model was needed to simulate an own factory utilization effect in the total cost calculation context. This study consist of the theoretical literature review and the empirical case study. This study was completed using the constructive research approach. The result of this study was a new total cost calculation model. The new total cost calculation model includes not only all the costs caused by manufacturing and logistics, but also the relevant capital costs. Using the new total cost calculation model, case company is able to complete the total cost calculations taking into account the own factory utilization effect in different volume situations and volume shares between an own factory and a partner factory.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of industrial maintenance has been emphasized during the last decades; it is no longer a mere cost item, but one of the mainstays of business. Market conditions have worsened lately, investments in production assets have decreased, and at the same time competition has changed from taking place between companies to competition between networks. Companies have focused on their core functions and outsourced support services, like maintenance, above all to decrease costs. This new phenomenon has led to increasing formation of business networks. As a result, a growing need for new kinds of tools for managing these networks effectively has arisen. Maintenance costs are usually a notable part of the life-cycle costs of an item, and it is important to be able to plan the future maintenance operations for the strategic period of the company or for the whole life-cycle period of the item. This thesis introduces an itemlevel life-cycle model (LCM) for industrial maintenance networks. The term item is used as a common definition for a part, a component, a piece of equipment etc. The constructed LCM is a working tool for a maintenance network (consisting of customer companies that buy maintenance services and various supplier companies). Each network member is able to input their own cost and profit data related to the maintenance services of one item. As a result, the model calculates the net present values of maintenance costs and profits and presents them from the points of view of all the network members. The thesis indicates that previous LCMs for calculating maintenance costs have often been very case-specific, suitable only for the item in question, and they have also been constructed for the needs of a single company, without the network perspective. The developed LCM is a proper tool for the decision making of maintenance services in the network environment; it enables analysing the past and making scenarios for the future, and offers choices between alternative maintenance operations. The LCM is also suitable for small companies in building active networks to offer outsourcing services for large companies. The research introduces also a five-step constructing process for designing a life-cycle costing model in the network environment. This five-step designing process defines model components and structure throughout the iteration and exploitation of user feedback. The same method can be followed to develop other models. The thesis contributes to the literature of value and value elements of maintenance services. It examines the value of maintenance services from the perspective of different maintenance network members and presents established value element lists for the customer and the service provider. These value element lists enable making value visible in the maintenance operations of a networked business. The LCM added with value thinking promotes the notion of maintenance from a “cost maker” towards a “value creator”.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The investments have always been considered as an essential backbone and so-called ‘locomotive’ for the competitive economies. However, in various countries, the state has been put under tight budget constraints for the investments in capital intensive projects. In response to this situation, the cooperation between public and private sector has grown based on public-private mechanism. The promotion of favorable arrangement for collaboration between public and private sectors for the provision of policies, services, and infrastructure in Russia can help to address the problems of dry ports development that neither municipalities nor the private sector can solve alone. Especially, the stimulation of public-private collaboration is significant under the exposure to externalities that affect the magnitude of the risks during all phases of project realization. In these circumstances, the risk in the projects also is becoming increasingly a part of joint research and risk management practice, which is viewed as a key approach, aiming to take active actions on existing global and specific factors of uncertainties. Meanwhile, a relatively little progress has been made on the inclusion of the resilience aspects into the planning process of a dry ports construction that would instruct the capacity planner, on how to mitigate the occurrence of disruptions that may lead to million dollars of losses due to the deviation of the future cash flows from the expected financial flows on the project. The current experience shows that the existing methodological base is developed fragmentary within separate steps of supply chain risk management (SCRM) processes: risk identification, risk evaluation, risk mitigation, risk monitoring and control phases. The lack of the systematic approach hinders the solution of the problem of risk management processes of dry port implementation. Therefore, management of various risks during the investments phases of dry port projects still presents a considerable challenge from the practical and theoretical points of view. In this regard, the given research became a logical continuation of fundamental research, existing in the financial models and theories (e.g., capital asset pricing model and real option theory), as well as provided a complementation for the portfolio theory. The goal of the current study is in the design of methods and models for the facilitation of dry port implementation through the mechanism of public-private partnership on the national market that implies the necessity to mitigate, first and foremost, the shortage of the investments and consequences of risks. The problem of the research was formulated on the ground of the identified contradictions. They rose as a continuation of the trade-off between the opportunities that the investors can gain from the development of terminal business in Russia (i.e. dry port implementation) and risks. As a rule, the higher the investment risk, the greater should be their expected return. However, investors have a different tolerance for the risks. That is why it would be advisable to find an optimum investment. In the given study, the optimum relates to the search for the efficient portfolio, which can provide satisfaction to the investor, depending on its degree of risk aversion. There are many theories and methods in finance, concerning investment choices. Nevertheless, the appropriateness and effectiveness of particular methods should be considered with the allowance of the specifics of the investment projects. For example, the investments in dry ports imply not only the lump sum of financial inflows, but also the long-term payback periods. As a result, capital intensity and longevity of their construction determine the necessity from investors to ensure the return on investment (profitability), along with the rapid return on investment (liquidity), without precluding the fact that the stochastic nature of the project environment is hardly described by the formula-based approach. The current theoretical base for the economic appraisals of the dry port projects more often perceives net present value (NPV) as a technique superior to other decision-making criteria. For example, the portfolio theory, which considers different risk preference of an investor and structures of utility, defines net present value as a better criterion of project appraisal than discounted payback period (DPP). Meanwhile, in business practice, the DPP is more popular. Knowing that the NPV is based on the assumptions of certainty of project life, it cannot be an accurate appraisal approach alone to determine whether or not the project should be accepted for the approval in the environment that is not without of uncertainties. In order to reflect the period or the project’s useful life that is exposed to risks due to changes in political, operational, and financial factors, the second capital budgeting criterion – discounted payback period is profoundly important, particularly for the Russian environment. Those statements represent contradictions that exist in the theory and practice of the applied science. Therefore, it would be desirable to relax the assumptions of portfolio theory and regard DPP as not fewer relevant appraisal approach for the assessment of the investment and risk measure. At the same time, the rationality of the use of both project performance criteria depends on the methods and models, with the help of which these appraisal approaches are calculated in feasibility studies. The deterministic methods cannot ensure the required precision of the results, while the stochastic models guarantee the sufficient level of the accuracy and reliability of the obtained results, providing that the risks are properly identified, evaluated, and mitigated. Otherwise, the project performance indicators may not be confirmed during the phase of project realization. For instance, the economic and political instability can result in the undoing of hard-earned gains, leading to the need for the attraction of the additional finances for the project. The sources of the alternative investments, as well as supportive mitigation strategies, can be studied during the initial phases of project development. During this period, the effectiveness of the investments undertakings can also be improved by the inclusion of the various investors, e.g. Russian Railways’ enterprises and other private companies in the dry port projects. However, the evaluation of the effectiveness of the participation of different investors in the project lack the methods and models that would permit doing the particular feasibility study, foreseeing the quantitative characteristics of risks and their mitigation strategies, which can meet the tolerance of the investors to the risks. For this reason, the research proposes a combination of Monte Carlo method, discounted cash flow technique, the theory of real options, and portfolio theory via a system dynamics simulation approach. The use of this methodology allows for comprehensive risk management process of dry port development to cover all aspects of risk identification, risk evaluation, risk mitigation, risk monitoring, and control phases. A designed system dynamics model can be recommended for the decision-makers on the dry port projects that are financed via a public-private partnership. It permits investors to make a decision appraisal based on random variables of net present value and discounted payback period, depending on different risks factors, e.g. revenue risks, land acquisition risks, traffic volume risks, construction hazards, and political risks. In this case, the statistical mean is used for the explication of the expected value of the DPP and NPV; the standard deviation is proposed as a characteristic of risks, while the elasticity coefficient is applied for rating of risks. Additionally, the risk of failure of project investments and guaranteed recoupment of capital investment can be considered with the help of the model. On the whole, the application of these modern methods of simulation creates preconditions for the controlling of the process of dry port development, i.e. making managerial changes and identifying the most stable parameters that contribute to the optimal alternative scenarios of the project realization in the uncertain environment. System dynamics model allows analyzing the interactions in the most complex mechanism of risk management process of the dry ports development and making proposals for the improvement of the effectiveness of the investments via an estimation of different risk management strategies. For the comparison and ranking of these alternatives in their order of preference to the investor, the proposed indicators of the efficiency of the investments, concerning the NPV, DPP, and coefficient of variation, can be used. Thus, rational investors, who averse to taking increased risks unless they are compensated by the commensurate increase in the expected utility of a risky prospect of dry port development, can be guided by the deduced marginal utility of investments. It is computed on the ground of the results from the system dynamics model. In conclusion, the outlined theoretical and practical implications for the management of risks, which are the key characteristics of public-private partnerships, can help analysts and planning managers in budget decision-making, substantially alleviating the effect from various risks and avoiding unnecessary cost overruns in dry port projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since its discovery, chaos has been a very interesting and challenging topic of research. Many great minds spent their entire lives trying to give some rules to it. Nowadays, thanks to the research of last century and the advent of computers, it is possible to predict chaotic phenomena of nature for a certain limited amount of time. The aim of this study is to present a recently discovered method for the parameter estimation of the chaotic dynamical system models via the correlation integral likelihood, and give some hints for a more optimized use of it, together with a possible application to the industry. The main part of our study concerned two chaotic attractors whose general behaviour is diff erent, in order to capture eventual di fferences in the results. In the various simulations that we performed, the initial conditions have been changed in a quite exhaustive way. The results obtained show that, under certain conditions, this method works very well in all the case. In particular, it came out that the most important aspect is to be very careful while creating the training set and the empirical likelihood, since a lack of information in this part of the procedure leads to low quality results.