48 resultados para software project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Process management refers to improving the key functions of a company. The main functions of the case company - project management, procurement, finance, and human resource - use their own separate systems. The case company is in the process of changing its software. Different functions will use the same system in the future. This software change causes changes in some of the company’s processes. Project cash flow forecasting process is one of the changing processes. Cash flow forecasting ensures the sufficiency of money and prepares for possible changes in the future. This will help to ensure the company’s viability. The purpose of the research is to describe a new project cash flow forecasting process. In addition, the aim is to analyze the impacts of the process change, with regard to the project control department’s workload and resources through the process measurement, and how the impacts take the department’s future operations into account. The research is based on process management. Processes, their descriptions, and the way the process management uses the information, are discussed in the theory part of this research. The theory part is based on literature and articles. Project cash flow and forecasting-related benefits are also discussed. After this, the project cash flow forecasting as-is and to-be processes are described by utilizing information, obtained from the theoretical part, as well as the know-how of the project control department’s personnel. Written descriptions and cross-functional flowcharts are used for descriptions. Process measurement is based on interviews with the personnel – mainly cost controllers and department managers. The process change and the integration of two processes will allow work time for other things, for example, analysis of costs. In addition to the quality of the cash flow information will improve compared to the as-is process. Analyzing the department’s other main processes, department’s roles, and their responsibilities should be checked and redesigned. This way, there will be an opportunity to achieve the best possible efficiency and cost savings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The goal of the master’s thesis was to develop a model to build a service quality centric customer reference portfolio for a software as a service company. The case company is Meltwater Finland Oy that leverages customer references externally but there is no systematic model to produce good quality customer references that are in line with the company strategy. The project was carried out as a case study, where the primary source of information were seventeen internal interviews with the employees of the case company. The theory part focuses on customer references as assets and service quality in software as a service industry. In the empirical part the research problem is solved. As a result of the case study, the model to build a service quality centric customer reference portfolio was created and further research areas were suggested.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The study develops an approach that tries to validate software functionality to work systems needs in SMEs. The formulated approach is constructed by using a SAAS based software i.e., work collaboration service (WCS), and SMEs as the elements of study. Where the WCS’s functionality is qualified to the collaboration needs that exist in operational and project work within SMEs. For this research constructivist approach and case study method is selected because the nature of the current study requires an in depth study of the work collaboration service as well as a detailed study of the work systems within different enterprises. Four different companies are selected in which fourteen interviews are conducted to gather data pertaining. The work systems method and framework are used as a central part of the approach to collect, analyze and interpret the enterprises work systems model and the underlying collaboration needs on operational and project work. On the other hand, the functional model of the WCS and its functionality is determined from functional model analysis, software testing, documentation and meetings with the service vendor. The enterprise work system model and the WCS model are compared to reveal how work progression differs between the two and make visible unaddressed stages of work progression. The WCS functionality is compared to work systems collaboration needs to ascertain if the service will suffice the needs of the project and operational work under study. The unaddressed needs provide opportunities to improve the functionality of the service for better conformity to the needs of enterprise and work. The results revealed that the functional models actually differed in how operational and project work progressed within the stages. WCS shared similar stages of work progression apart from the stages of identification and acceptance, and progress and completion stages were only partially addressed. Conclusion is that the identified unaddressed needs such as, single point of reference, SLA and OLA inclusion etc., should be implemented or improved within the WCS at appropriate stages of work to gain better compliance of the service to the needs of the enterprise an work itself. The developed approach can hence be used to carry out similar analysis for the conformance of pre-built software functionality to work system needs with SMEs.