47 resultados para Condition-based maintenance
Resumo:
The purpose of this Master´s Thesis is to develop asset management and its practices in case company. District heating and cooling systems operated by case company around Finland, Sweden, Poland and the Baltics form an enormous-sized asset base where some parts are starting to reach their end of life-cycles. Large-sized asset renewal actions are under discussion and maintenance spending is increasing. Financially justified decisions in changing business environment are needed. Asset management is one of the most important concepts for production organization which operates with capital-intensive production assets. Organizations profitability is highly dependent on assets´ performance. Such assets, like district heating and cooling systems, should be utilized as efficiently as possible within their life-cycles but also maintained and renewed optimally. In this qualitative thesis, empirical interview study was conducted to describe the current situation on how the assets are managed in the case company and to examine the readiness to implement a new, risk-based solution. Asset management revealed to be a very well-known concept. From proposed risk-based asset management point of view, several key observations were made. It was seen as a suitable solution, but further development will be needed. Based on the need and findings, several key processes and frameworks were created and also tested with a case study. Assets` condition monitoring should be improved, which would have a positive impact on event probability assessment. Risk acceptance is also a thing to be discussed further. When the evaluation becomes fluent in single investment cases, portfolio-level expansion should be considered and started. As a result, thesis proposes a solution how risk-based asset management could be performed practically in a capital-intensive case company in order to optimize the maintenance spending in a long run. Created practical framework is made universal: similar principles can be applied into multiple cases in case company but also in other energy companies. Risk-based asset management`s benefits could be utilized best in portfolio-level optimization where the capital would be invested to the most important objects from total risk point of view. Eventually, such approach would allow case company to optimize capital spending in a situation where funds are not adequate to cover all the mandatory needs and prioritization between the investment alternatives will truly be needed.
Resumo:
At present, in large precast concrete enterprises, the management over precast concrete component has been chaotic. Most enterprises take labor-intensive manual input method, which is time consuming and laborious, and error-prone. Some other slightly better enterprises choose to manage through bar-code or printing serial number manually. However, on one hand, this is also labor-intensive, on the other hand, this method is limited by external environment, making the serial number blur or even lost, and also causes a big problem on production traceability and quality accountability. Therefore, to realize the enterprise’s own rapid development and cater to the needs of the time, to achieve the automated production management has been a big problem for a modern enterprise. In order to solve the problem, inefficiency in production and traceability of the products, this thesis try to introduce RFID technology into the production of PHC tubular pile. By designing a production management system of precast concrete components, the enterprise will achieve the control of the entire production process, and realize the informatization of enterprise production management. RFID technology has been widely used in many fields like entrance control, charge management, logistics and so on. RFID technology will adopt passive RFID tag, which is waterproof, shockproof, anti-interference, so it’s suitable for the actual working environment. The tag will be bound to the precast component steel cage (the structure of the PHC tubular pile before the concrete placement), which means each PHC tubular pile will have a unique ID number. Then according to the production procedure, the precast component will be performed with a series of actions, put the steel cage into the mold, mold clamping, pouring concrete (feed), stretching, centrifugalizing, maintenance, mold removing, welding splice. In every session of the procedure, the information of the precast components can be read through a RFID reader. Using a portable smart device connected to the database, the user can check, inquire and management the production information conveniently. Also, the system can trace the production parameter and the person in charge, realize the traceability of the information. This system can overcome the disadvantages in precast components manufacturers, like inefficiency, error-prone, time consuming, labor intensity, low information relevance and so on. This system can help to improve the production management efficiency, and can produce a good economic and social benefits, so, this system has a certain practical value.