41 resultados para project environment


Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis is part of the Arctic Materials Technologies Development –project, which aims to research and develop manufacturing techniques, especially welding, for Arctic areas. The main target of this paper is to clarify what kind of European metallic materials are used, or can be used, in Arctic. These materials include mainly carbon steels but also stainless steels and aluminium and its alloys. Standardized materials, their properties and also some recent developments are being introduced. Based on this thesis it can be said that carbon steels (shipbuilding and pipeline steels) have been developed based on needs of industry and steels exist, which can be used in Arctic areas. Still, these steels cannot be fully benefited, because rules and standards are under development. Also understanding of fracture behavior of new ultra high strength steels is not yet good enough, which means that research methods (destructive and non-destructive methods) need to be developed too. The most of new nickel-free austenitic and austenitic-ferritic stainless steels can be used in cold environment. Ferritic and martensitic stainless steels are being developed for better weldability and these steels are mainly developed in nuclear industry. Aluminium alloys are well suitable for subzero environment and these days high strength aluminium alloys are available also as thick sheets. Nanotechnology makes it possible to manufacture steels, stainless steels and aluminium alloys with even higher strength. Joining techniques needs to be developed and examined properly to achieve economical and safe way to join these modern alloys.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The management of port-related supply chains is challenging due to the complex and heterogeneous operations of the ports with several actors and processes. That is why the importance of information sharing is emphasised in the ports. However, the information exchange between different port-related actors is often cumbersome and it still involves a lot of manual work and paper. Major ports and port-related actors usually have advanced information systems in daily use but these systems are seldom interoperable with each other, which prevents economies of scale to be reached. Smaller ports and companies might not be equipped with electronic data transmission at all. This is the final report of the Mobile port (MOPO) project, which has sought ways to improve the management and control of port-related sea and inland traffic with the aid of ICT technologies. The project has studied port community systems (PCS) used worldwide, evaluated the suitability of a PCS for the Finnish port operating environment and created a pilot solution of a Finnish PCS in the port of HaminaKotka. Further, the dry port concept and its influences on the transportation system have been explored. The Mobile Port project comprised of several literature reviews, interviews of over 50 port-related logistics and/or ICT professionals, two different kinds of simulation models as well as designing and implementing of the pilot solution of the Finnish PCS. The results of these multiple studies are summarised in this report. Furthermore, recommendations for future actions and the topics for further studies are addressed in the report. The study revealed that the information sharing in a typical Finnish port-related supply chain contains several bottlenecks that cause delays in shipments and waste resources. The study showed that many of these bottlenecks could be solved by building a port community system for the Finnish port community. Almost 30 different kinds of potential services or service entities of a Finnish PCS were found out during the study. The basic requirements, structure, interfaces and operation model of the Finnish PCS were also defined in the study. On the basis of the results of the study, a pilot solution of the Finnish PCS was implemented in the port of HaminaKotka. The pilot solution includes a Portconnect portal for the Finnish port community system (available at https://www.portconnect.fi) and two pilot applications, which are a service for handling the information flows concerning the movements of railway wagons and a service for handling the information flows between Finnish ports and Finland-Russian border. The study also showed that port community systems can be used to improve the environmental aspects of logistics in two different ways: 1) PCSs can bring direct environmental benefits and 2) PCSs can be used as an environmental tool in a port community. On the basis of the study, the development of the Finnish port community system should be continued by surveying other potential applications for the Finnish PCS. It is also important to study if there is need and resources to extend the Finnish PCS to operate in several ports or even on a national level. In the long run, it could be reasonable to clarify whether there would be possibilities to connect the Finnish PCS as a part of Baltic Sea wide, European-wide or even worldwide maritime and port-related network in order to get the best benefit from the system

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Corporate decision to scale Agile Software development methodologies in offshoring environment has been obstructed due to possible challenges in scaling agile as agile methodologies are regarded to be suitable for small project and co-located team only. Although model such as Agile Scaling Model (ASM) has been developed for scaling Agile with different factors, inabilities of companies to figure out challenges and addressing them lead to failure of project rather than gaining the benefits of using agile methodologies. This failure can be avoided, when scaling agile in IT offshoring environment, by determining key challenges associated in scaling agile in IT offshoring environment and then preparing strategies for addressing those key challenges. These key challenges in scaling agile with IT offshoring environment can be determined by studying issues related with Offshoring and Agile individually and also considering the positive impact of agile methodology in offshoring environment. Then, possible strategies to tackle these key challenges are developed according to the nature of individual challenges and utilizing the benefits of different agile methodologies to address individual situation. Thus, in this thesis, we proposed strategy of using hybrid agile method, which is increasing trend due to adaptive nature of Agile. Determination of the key challenges and possible strategies for tackling those challenges are supported with the survey conducted in the researched organization.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The importance of Information Technology (IT) in the business environment is continuously growing. This stimulates the increase of size, complexity and number of IT projects and raises the need for IT Project Portfolio Management (IT PPM). While being actively discussed for the last few decades, IT PPM has a short history of practical implementation. This creates inconsistency in the views of different authors and provides an opportunity for additional research. As a first step, this research explores the existing studies and brings together the views of different authors on IT PPM. As a result, a high-level IT PPM Process Cycle and a set of Key Success Factors for IT PPM are proposed. IT PPM Process Cycle gives an overview of the main elements of IT PPM process, while the set of Key Success Factors provides a number of factors that should be considered during the implementation. As a second step, both theoretical deliverables are empirically tested by a case study and a survey conducted in a big multinational company. The case study is used to analyze process framework of the studied company towards the developed IT PPM Process Cycle. Subsequently, a survey was conducted among subject matter experts of the same company to evaluate the importance and relevance of the proposed Key Success Factors. Finally, this thesis concludes with findings made during the case study and provides an empirically tested selection of factors to be taken into account. These two deliverables can be used by both academics and practitioners to close the gaps in existing literature and assist in IT PPM implementation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The transition of project based manufacturing business, even more into global networks, sets up challenges for companies to manage their business in this new operating environment. One way to tackle these challenges is the successful management of product information through an extended product’s lifecycle. Thus, one objective of this research is to find ways how product information management in global project based manufacturing can be improved. Another objective is to find a solution how the target company can improve its product information management in the offer-to-procurement business process. Due to the nature of the topic, the study follows constructive research methodology with qualitative methods. By combining literature related to this topic a framework is created to improve product information management in global project based manufacturing. The improvement process in this framework is based on a systematic approach from the current state towards target state. A general aim for improvements should be the integrated product and project lifecycle information management through Lean approach. This introduced framework is applied to the target company through two case projects. Data for building view of current state and analysis is collected mostly by theme interviews and also utilizing other material from the target company. Used tools help to analyzing was the BPMN and the Trace matrix for business chains. Results of the improvement process are collected in a solution proposal which contain the strategic target state as well as long and short term objectives. The strategic target state is defined as controlled customization. Also during the improvement process are created the Information requirements chart in the offer-to-procurement business process, and the Project related initial information questionnaire to customer.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An augmented reality (AR) device must know observer’s location and orientation, i.e. observer’s pose, to be able to correctly register the virtual content to observer’s view. One possible way to determine and continuously follow-up the pose is model-based visual tracking. It supposes that a 3D model of the surroundings is known and that there is a video camera that is fixed to the device. The pose is tracked by comparing the video camera image to the model. Each new pose estimate is usually based on the previous estimate. However, the first estimate must be found out without a prior estimate, i.e. the tracking must be initialized, which in practice means that some model features must be identified from the image and matched to model features. This is known in literature as model-to-image registration problem or simultaneous pose and correspondence problem. This report reviews visual tracking initialization methods that are suitable for visual tracking in ship building environment when the ship CAD model is available. The environment is complex, which makes the initialization non-trivial. The report has been done as part of MARIN project.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Poster at Open Repositories 2014, Helsinki, Finland, June 9-13, 2014

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This thesis was carried out as a case study of a company YIT in order to clarify the sev-erest risks for the company and to build a method for project portfolio evaluation. The target organization creates new living environment by constructing residential buildings, business premises, infrastructure and entire areas worth for EUR 1.9 billion in the year 2013. Company has noted project portfolio management needs more information about the structure of project portfolio and possible influences of market shock situation. With interviews have been evaluated risks with biggest influence and most appropriate metrics to examine. The major risks for the company were evaluated by interviewing the executive staff. At the same time, the most appropriate risk metrics were considered. At the moment sales risk was estimated to have biggest impact on company‟s business. Therefore project port-folio evaluation model was created and three different scenarios for company‟s future were created in order to identify the scale of possible market shock situation. The created model is tested with public and descriptive figures of YIT in a one-year-long market shock and the impact on different metrics was evaluated. Study was conducted using con-structive research methodology. Results indicate that company has notable sales risk in certain sections of business portfolio.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Targeted measures bring the greatest benefits for environmental protection in agriculture final report of the TEHO Plus project (2011–2014). Particular priority areas of the project activities included creating a training package for agri-environment advisers and testing it, farm-specific advisory services and exploitation of experiences of advice provision, putting together an information package of agri-environment issues, farm-level experiments, and development of water quality monitoring. The recommendations issued by advisers on targeting environmental measures were based on utilising geographical information material and nutrient balances. The project was implemented in cooperation by Southwest Finland Centre for Economic Development, Transport and the Environment, MTK-Satakunta and MTK-Varsinais-Suomi. The project received funding from the Ministry of Agriculture and Forestry and the Ministry of the Environment. Participating farmers, with whom environmental advice was developed and experiments were carried out, were important partners for the project. The operating area of the project was Satakunta and Varsinais-Suomi in Southwest Finland, but its outcomes can be exploited nationally. A national perspective was ensured by close cooperation with actors in different provinces. This final report describes project experiences and outcomes including environmental advisory services, training of agri-environmental advisers, farm visits and the feedback received from farmers on agri-environmental advice, development of water quality monitoring, experiments and project work.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Today, the user experience and usability in software application are becoming a major design issue due to the adaptation of many processes using new technologies. Therefore, the study of the user experience and usability might be included in every software development project and, thus, they should be tested to get traceable results. As a result of different testing methods to evaluate the concepts, a non-expert on the topic might have doubts on which option he/she should opt for and how to interpret the outcomes of the process. This work aims to create a process to ease the whole testing methodology based on the process created by Seffah et al. and a supporting software tool to follow the procedure of these testing methods for the user experience and usability.