27 resultados para Road movie
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
In the industry of the case company, transportation and warehousing costs account for more than 10% of the total cost which is more than on average. A Finnish company has an understanding that by sending larger shipments in parcels, they could save tens of thousands of euros annually in freight costs in Finland’s domestic shipments. To achieve these savings and optimize total logistics cost, company’s interest is to find out which is the cost efficient way of shipping road shipments of certain volumes; in parcel boxes or on pallets, and what should be the split volume determining the shipment type. Distribution center (DC) costs affect this decision and therefore they need to be also evaluated to determine the total logistics cost savings. Main results were achieved by executing activity-based costing-calculations including DC and road freight costs to determine the ideal split volume with which the total logistics cost is optimal. Calculations were done for Finland’s DC, separately for two main road freight destinations, Finland and Sweden, which cover 50% of road shipment spend. Data for calculations was collected both manually and automatically from various internal and external sources, such as the company ERP system and logistics service providers’ (LSP) reporting. DC processes were studied in practice and compared to model processes. Currently used freight rates were compared to existing pricing models and freight service tendering process was evaluated by participating in the process and comparing it to the models based on literature. The results show that the potential savings are not as significant as the company hoped for, mainly because of packing work increasing DC labor cost. Annual savings by setting ideal split volume per country would account for 0,4 % of the warehousing and transportation costs of shipments in scope of this thesis. Split volume should be set separately for each route, mainly because the pricing model for road freight is different in each country. For some routes bigger parcels should be sent but for some routes pallets should be used more. Next step is to do these calculations for remaining routes to determine total savings potential. Other findings show that the processes in the DC are designed well and the company could achieve savings by executing tenders more efficiently. Company should also pay more attention to parcel pricing and packing the shipments accordingly.
Resumo:
This thesis explores how the project charter development, project scope management, and project time management are executed in a Finnish movie production. The deviations and analogies between a case movie production and best practices suggested in PMBOK are presented. Empirical material from the case is gathered with two semi-structured interviews with a producer and a line producer. The interview data is categorized according to PMBOK knowledge areas. The analysis is complemented with movie industry specific norms found in popular movie production guides. The described and observed methods are linked together and the relationship between them is discussed. The project charter development, which is referred as a green light process in the movie industry, is mostly analogous between all areas. The deviations are in the level of formality. The green lighting in the case movie was accomplished without bureaucratic reports described in movie production guides. The empirical material shows that project management conventions and movie industry employ similar methods especially in scope management. Project management practices introduce a work breakdown structure (WBS) method, and movie production accomplishes the same task by developing a shooting script. Time management of the case movie deviates on most parts from the methods suggested in PMBOK. The major deviation is resource management. PMBOK suggests creating a resource breakdown structure. The case movie production accomplished this through budgeting process. Furthermore the popular movie production guides also disregard resource management as sovereign process. However the activity listing is quite analogous between the case movie and PMBOK. The final key observation is that although there is a broad set of effective and detailed movie industry specific methods, a comprehensive methodology that would cover the whole production process, such as Prince2 or Scrum, seems to be missing from the movie industry.
Resumo:
Electrical road vehicles were common at the begin of the 20th century but internal combustion engines took a victory from electrical motors in road vehicles. The acknowledgement of the environment, and the price and the availability of the crude oil are reasons for the comeback of the electrical vehicles. Advancement in industrial technology and political atmosphere in EU as the directive 20--20--20, which consists of reducing fossil emission, increasing renewable energy and increasing the energy efficiency, have made the electrification popular again. In this thesis tests based on standard ISO 16750--2 electrical loads for electrical equipment in road vehicles are made for Visedo Oy's PowerMASTER M-frame power electronics device. This device is designed for mainly drive trains in mobile work machines and marine vessels but can be used in other application in its power range which also includes road vehicles. The functionality of the device is tested with preliminary tests which act as a framework for the tests based on standards.