8 resultados para time and motion study

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Executive Summary Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A review of the Iowa Department of Transportation's field data collection and reporting system has been performed. Included were several systems used by the Office of Construction and Local Jurisdictions. The entire field data collection and reporting systems for asphalt cement concrete (ACC) paving, portland cement concrete (PCC) paving, and PCC structures were streamlined and computerized. The field procedures for materials acceptance were also reviewed. Best practices were identified and a method was developed to prioritize materials so transportation agencies could focus their efforts on high priority materials. Iowa State University researchers facilitated a discussion about Equal Employment Opportunity (EEO) and Affirmative Action (AA) procedures between the Office of Construction field staff and the Office of Contracts. A set of alternative procedures was developed. Later the Office of Contracts considered these alternatives as they developed new procedures that are currently being implemented. The job close-out package was reviewed and two unnecessary procedures were eliminated. Numerous other procedures were reviewed and flowcharted. Several changes have been recommended that will increase efficiency and allow staff time to be devoted to higher priority activities. It is estimated the improvements in ACC paving, PCC paving and structural concrete will by similar to three full time equivalent (FTE) positions to field construction, field materials and Office of Materials. Elimination of EEO interviews will be equivalent to one FTE position. It is estimated that other miscellaneous changes will be equivalent to at least one other FTE person. This is a total five FTEs. These are conservative estimates based on savings that are easily quantified. It is likely that total positive effect is greater when items that are difficult to quantify are considered.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Final report of road equipment procurement and utilization study.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Legislative Council created the Energy Efficiency Plans and Programs Study Committee for the 2008 Legislative Interim pursuant to the passage of S.F. 2386 during the 2008 Legislative Session, which provided, in Section 8: The Legislative Council is requested to establish an interim study committee to examine the existence and effectiveness of energy efficiency plans and programs implemented by gas and electric public utilities, with an emphasis on results achieved by current plans and programs from the demand, or customer, perspective, and to make recommendations for additional requirements applicable to energy efficiency plans and programs that would improve such results. In conducting the study and developing recommendations, the Committee shall consider testimony from the Iowa Utilities Board, rate and nonrate-regulated gas and electric utilities, the Consumer Advocate, state agencies involved with energy efficiency program administration, environmental groups and associations, and consumers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The role of rural demand-responsive transit is changing, and with that change is coming an increasing need for technology. As long as rural transit was limited to a type of social service transportation for a specific set of clients who primarily traveled in groups to common meal sites, work centers for the disabled, or clinics in larger communities, a preset calendar augmented by notes on a yellow legal pad was sufficient to develop schedules. Any individual trips were arranged at least 24 to 48 hours ahead of time and were carefully scheduled the night before in half-hour or twenty-minute windows by a dispatcher who knew every lane in the service area. Since it took hours to build the schedule, any last-minute changes could wreak havoc with the plans and raise the stress level in the dispatch office. Nevertheless, given these parameters, a manual scheduling system worked for a small demand-responsive operation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of the study is to locate a site appropriate for a 170 offender unit, based on an understanding of current needs, existing and proposed procedure and the longevity of existing facility use. The study is based on master-plan process. A framework on which multiple stages of infrastructure development can be based is initiated through the systemic study of infrastructure condition, infrastructure needs and treatment objectives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An optimum allocation model has been utilized to examine the existing allocation of highway segments to maintenance garages in the Tama and Blairstown study area. The model has also been used to evaluate the financial impact of closing the highway maintenance garages at Tama and Blairstown and building a new garage at the junction of U.S. 30 and Iowa 21. The examination of the study area shows that only 13 of 91 highway segments were reallocated under optimum procedures at an annual operational savings of approximately $13,200. The study concludes there would be an annual operational savings of approximately $48,200 if the garages at Tama and Blairstown were closed and a new garage was built at the junction of U.S. 30 and Iowa 21.