10 resultados para leave time

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Iowa Code section 70A.25(3)(b) states the department shall report the direct and indirect costs of educational leave and educational assistance granted to its employees during the preceding fiscal year. The report shall include the number of employees granted educational leave and the amount of tuition reimbursement allowed; the number of employees granted leave from work to attend classes and who continued to receive their salary and the number of hours of work which those employees were excused; and the number of employees granted a temporary leave of absence from work to attend the classes without pay and the amount of time missed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Iowa Code section 70A.25(3)(b) states the department shall report the direct and indirect costs of educational leave and educational assistance granted to its employees during the preceding fiscal year. The report shall include the number of employees granted educational leave and the amount of tuition reimbursement allowed; the number of employees granted leave from work to attend classes and who continued to receive their salary and the number of hours of work which those employees were excused; and the number of employees granted a temporary leave of absence from work to attend the classes without pay and the amount of time missed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A detailed investigation has been conducted on core samples taken from 17 portland cement concrete pavements located in Iowa. The goal of the investigation was to help to clarify the root cause of the premature deterioration problem that has become evident since the early 1990s. Laboratory experiments were also conducted to evaluate how cement composition, mixing time, and admixtures could have influenced the occurrence of premature deterioration. The cements used in this study were selected in an attempt to cover the main compositional parameters pertinent to the construction industry in Iowa. The hardened air content determinations conducted during this study indicated that the pavements that exhibited premature deterioration often contained poor to marginal entrained-air void systems. In addition, petrographic studies indicated that sometimes the entrained-air void system had been marginal after mixing and placement of the pavement slab, while in other instances a marginal to adequate entrained-air void system had been filled with ettringite. The filling was most probably accelerated because of shrinkage cracking at the surface of the concrete pavements. The results of this study suggest that the durability—more sciecifically, the frost resistance—of the concrete pavements should be less than anticipated during the design stage of the pavements. Construction practices played a significant role in the premature deterioration problem. The pavements that exhibited premature distress also exhibited features that suggested poor mixing and poor control of aggregate grading. Segregation was very common in the cores extracted from the pavements that exhibited premature distress. This suggests that the vibrators on the paver were used to overcome a workability problem. Entrained-air voids formed in concrete mixtures experiencing these types of problems normally tend to be extremely coarse, and hence they can easily be lost during the paving process. This tends to leave the pavement with a low air content and a poor distribution of air voids. All of these features were consistent with a premature stiffening problem that drastically influenced the ability of the contractor to place the concrete mixture. Laboratory studies conducted during this project indicated that most premature stiffening problems can be directly attributed to the portland cement used on the project. The admixtures (class C fly ash and water reducer) tended to have only a minor influence on the premature stiffening problem when they were used at the dosage rates described in this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The air void analyzer (AVA) with its independent isolation base can be used to accurately evaluate the air void system—including volume of entrained air, size of air voids, and distribution of air voids—of fresh portland cement concrete (PCC) on the jobsite. With this information, quality control adjustments in concrete batching can be made in real time to improve the air void system and thus increase freeze-thaw durability. This technology offers many advantages over current practices for evaluating air in concrete.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A one page informational sheet about skin cancer and the hat you wear. Sun Safety

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was initiated by the Department of Personnel, now the Department of Administrative Services (DAS)– Human Resources Enterprise (HRE), to assist executive branch agencies in determining why employees leave their employ or state government as well as provide insight into past employee perceptions of their employer. As the workforce continues to age and at the same time the available workforce declines, employers must have data to manage their turnover effectively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was initiated by the Department of Personnel, now the Department of Administrative Services (DAS)– Human Resources Enterprise (HRE), to assist executive branch agencies in determining why employees leave their employ or state government as well as provide insight into past employee perceptions of their employer. As the workforce continues to age and at the same time the available workforce declines, employers must have data to manage their turnover effectively.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Guide manual for using the Human Resource Information System for the state of Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 82nd General Assembly of the Iowa legislature, in Section 26 of Senate File 2420, required the Iowa Department of Transportation (Iowa DOT) to conduct an analysis of TIME-21 funding. Specifically the legislation requires the following: “The department of transportation shall conduct an analysis of the additional revenues necessary to provide at least two hundred million dollars annually to the TIME-21 fund by FY 2011-2012. The analysis shall include but is not limited to the amount of excise tax levied on motor fuel and adjustments that might be made to various fees collected by the department in order to create an appropriate balance of taxes and fees paid by Iowa drivers and out-of-state drivers. The department shall submit a report to the governor and the general assembly on or before December 31, 2008, regarding its analysis.” As a starting point to this analysis, a reassessment of long-range needs and revenues (including the estimated $200 million most critical annual unmet needs) was made. This was done by assessing changing trends in roadway conditions, revenue and construction costs since the original Study of Iowa’s Current Road Use Tax Funds (RUTF) and Future Road Maintenance and Construction Needs was completed December 2006.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 82nd General Assembly of the Iowa legislature, in Section 26 of Senate File 2420, required the Iowa Department of Transportation (Iowa DOT) to conduct an analysis of TIME-21 funding. Specifically the legislation requires the following: “The department of transportation shall conduct an analysis of the additional revenues necessary to provide at least two hundred million dollars annually to the TIME-21 fund by FY 2011-2012. The analysis shall include but is not limited to the amount of excise tax levied on motor fuel and adjustments that might be made to various fees collected by the department in order to create an appropriate balance of taxes and fees paid by Iowa drivers and out-of-state drivers. The department shall submit a report to the governor and the general assembly on or before December 31, 2008, regarding its analysis.” As a starting point to this analysis, a reassessment of long-range needs and revenues (including the estimated $200 million most critical annual unmet needs) was made. This was done by assessing changing trends in roadway conditions, revenue and construction costs since the original Study of Iowa’s Current Road Use Tax Funds (RUTF) and Future Road Maintenance and Construction Needs was completed December 2006.