5 resultados para feasibility study
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
The study analyzes the need for a four-lane highway between St. Louis and St. Paul, and finds it to be needed; it analyzes the highway's feasibility, and finds it to be feasible; it analyzes alternative design standards and suggests that it be built to expressway standards; and, the study evaluates alternative routes and presents four "finalist" routes for your consideration.
Resumo:
The study analyzes the need for a four-lane highway between St. Louis and St. Paul, and finds it to be needed; it analyzes the highway's feasibility, and finds it to be feasible; it analyzes alternative design standards and suggests that it be built to expressway standards; and, the study evaluates alternative routes and presents four "finalist" routes for your consideration.
Resumo:
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility
Resumo:
This study examines the feasibility of making a major financial investment in the improvement of U.S. 20 between Sioux City and Fort Dodge, Iowa. This 119-mile (191-km) highway segment of U.S. 20 currently includes 97 miles (156 km) of 2-lane highway and 22 miles (35 km) of 4-lane highway (on the west end near Sioux City and a short section near Holstein). This 119-mile (191-km) segment is predominantly rural in nature, and serves a region of Iowa that has not been economically prospering. Local business leaders and residents have long desired major improvements to this highway segment, not only because of the safety and travel efficiency implications, but also because of the belief that the highway, as mainly a two-lane facility, is retarding the corridor area's economic growth and well being. The study was divided into five sequential tasks: (A) Evaluation of Existing U.S. 20; (B) Improvement Alternatives, Costs and Traffic; (C) Screening of Alternative Candidate Improvements; (D) Economic Feasibility Analysis; and (E) Interpretation and Comparisons.
Resumo:
This report describes the U.S. 63 Corridor in terms of its economic and demographic features, the physical characteristics of the existing facility and the traffic it serves. Also, the various improvement alternatives are described and evaluated. These evaluations consider the traffic needs in the time period up to the year 2010, the travel benefits that would derive from alternative improvements to U.S. 63 and the economic development benefits that would be stimulated by such improvements. These benefits are related to the costs of the improvements and various indicators of economic feasibility are provided.