U.S. Highway 20 Corridor Development Study, Report B: Improvement Alternatives, Costs and Traffic, 1992
Data(s) |
1992
|
---|---|
Resumo |
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility |
Formato |
|
Identificador |
http://publications.iowa.gov/22490/1/IADOT_US_Highway_20_Development_Report_B_1992.pdf (1992) U.S. Highway 20 Corridor Development Study, Report B: Improvement Alternatives, Costs and Traffic, 1992. Transportation, Department of |
Idioma(s) |
en |
Relação |
http://publications.iowa.gov/22490/ |
Palavras-Chave | #Transportation #Traffic Management #Roads and highways #Research #Design and Construction #Economics, finance, and taxes |
Tipo |
Departmental Report NonPeerReviewed |