75 resultados para conservation practices

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Walnut Creek is a Class B warm water stream located in northern Poweshiek County. The creek is sixteen miles in length with 26,223 acres of watershed area. Walnut Creek is listed on the 2008 impaired waters list as biologically impaired. Based on results of biological monitoring, no specific causes of the impairment have been identified. This watershed is of particular significance to the Poweshiek SWCD and the state of Iowa because water quality protection efforts can be implemented that will address the impairment. The Poweshiek SWCD received a watershed development grant in 2005, to complete a watershed assessment for the Walnut Creek Watershed. The results of the assessments showed an estimated 23,224 tons of sediment are delivered annually to Walnut Creek, and, about 34% of land in the watershed is delivering nearly 66% of the sediment. Therefore, the acres with more than 1 ton/ac/yr sediment delivery have been prioritized. In Jan. 2008, an implementation grant began. The 1st year’s EQIP matching funds were obligated by July 2008. Specific objectives are to: 1) Reduce sediment delivery by 3,205 tons, by installing conservation practices on the sediment delivery areas of more that 1 ton/ac/yr, and, 2) Develop an information and education program for landowners. The District has prioritized the Walnut Creek watershed for 50% EQIP funding to be combined with 25% WSPF funds. This application is for additional practice funds, utilized as 50% cost-share, to be used with 25% WSPF funds, for eligible soil loss projects (>1 ton/ac), when EQIP funds are not available.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Buena Vista SWCD is submitting this WIRB request on behalf of both Buena Vista and Pocahontas SWCDs. The two SWCDs are working jointly on a project that includes three existing Mississippi River Basin Imitative (MRBI) project areas in the North Raccoon River Watershed. The total project area is 280,654 crop acres. The MRBI project involves installing conservation practices through the EQIP program. Funding from MRBI will support costs of practice design, layout and checkout, however, there is no funding to market and sell the program and practices to landowners and producers in the project area. Both soil and water districts are financially supporting work currently being done to encourage signup for the approved practices. To effectively implement the MRBI project it is imperative that marketing and promotion through group meetings and one-on­ one contacts is completed. Funding from WIRB will allow the existing employee to spend the needed time on these promotional activities in both Buena Vista and Pocahontas County. Through this WIRB request these two SWCDs districts plan to apply over $800,000 worth of conservation practices that is funded through the MRBI program. The return from this investment of WIRB dollars is large. This is an opportunity to support a large amount of conservation work in the North Raccoon River Watershed, which, is also an important water source for the city Des Moines and provides recreational activities from Des Moines up to BY and Pocahontas Counties.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Little River Lake watershed is a 13,305 acre subwatershed of Little River. The 788 acre lake was listed as a 303d impaired water body in 2008 due to elevated turbidity and algae levels. The Decatur SWCD has prioritized water quality protection efforts within the Little River Lake watershed because 1) portions of this watershed has been identified as the primary contributor of sediment and nutrients to Little River Lake, which provides an essential source of drinking water for Decatur County and the Southern Iowa Rural Water Association; 2) the watershed provides exemplary education and project interpretation opportunities due to its proximity to Little River Lake Recreation Area, and 3) by using targeted and proven soil conservation practices to address water quality deficiencies the probability of successfully attenuating soil erosion and ameliorating water quality impairments is enhanced. The specific goals of this proposal are to: 1. reduce annual sediment, and phosphorous delivery to the lake by 11,280 tons and 14,664 lbs., respectively, via applications of conservation practices on targeted agricultural land; 2. delist the lake as an EPA 303d impaired water body via water quality enhancement; 3. obtain a “Full Support” status for the lake’s aquatic life and recreational use; 4. reduce potable water treatment costs (minimum 50% cost reduction) associated with high suspended solid levels; and 5. restore a viable sport-fish population, thereby bolstering tourism and the economy. To achieve timely project implementation the Decatur SWCD has cooperated with the IDNR Watershed Improvement Section, Fisheries Bureau, and IDALS-DSC to assess extant water quality and watershed conditions, coalesced a diverse team of committed partners and secured matching funding from multiple sources.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Initiated in 2001, the West Tarkio Creek Watershed Project has a proven track record of implementing an enormous amount of structural conservation practices. To date, over $925,000 has been spent to build 69 miles of terraces on 63 cooperators' land. The success of the Project was due in large part to the conservation ethic of the landowners to improve their farms, preserve the productivity of the land, and protect West Tarkio Creek. This has been made possible through funding from DSC Watershed Protection Funds (WSPF) which has provided $1,362,592 in cost share funds since 2001 but is has been severely limited in recent years due to shortages within the State’s budget. The original project goals called for the construction of 750,000 feet (142 miles) of terraces to effectively treat the watershed. In order to meet these goals and bring the project to a successful endpoint, another 153,000 feet (29 miles) remain to be constructed by the landowners with the help of the SWCD staff. Severe rain events in recent years have caused an enormous amount of damage throughout the region, these storms were helpful in identifying where watershed work remains to be completed. Scars on the landscape in the aftermath of the storms clearly etched out the specific location where additional practices are needed in addition to those proposed in the original project work plan. Project supporters are confident that the WIRB Program can unlock this potential and pave the way for what can become known as one of the most effective land treatment projects in Iowa.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Part of a phased approach, an intensive information and education program, construction of erosion control practices, and sediment control on construction sites is proposed. These proposed practices will manage sediment runoff and nutrient runoff on agricultural and urban areas. Sediment control “structures” such as waterways, wetlands, modified terraces, grade stabilization structures, sediment basins, and rain gardens is proposed and will be combined with nutrient and pesticide management and reduced tillage to reduce non-point source pollution. A reduction of 15% of the sediment and phosphorus delivered to a water body from priority areas will be looked at as a success in this short-term project focused primarily at education within the project area which is also, for the most part, the top 25% sediment load producing sub-watersheds. In addition, four urban areas have been identified as part of this project as needing immediate assistance. A combination of urban and agricultural conservation practices, shoreline revegetation, and education of landowners will be used to achieve these results on both the urban and the agricultural arena.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The main channel of Upper Buffalo Creek has been identified on Iowa's 303(d) List of Impaired Waters as having a biological impairment (i.e., greater than 50% decrease in mussel species) due to habitat modification, stream alteration, nutrients, and/or siltation. The Buchanan County SWCD has identified this as a priority watershed because mussel population decreases have been well documented to be directly associated with decreases in ecological value, recreational value, and overall water quality. The presence of a diverse and reproducing mussel population indicates that a healthy aquatic ecosystem is intact, which means good fishing, good water quality for wildlife, and assurance that water is safe for recreation. Dan Cohen, Buchanan Conservation Board Director, stated that "should water quality conditions improve, and fishing holes and habitat be enhanced, there is no doubt that many people would take advantage of the renewed recreational opportunities". This watershed contains two "threatened" species of mussels and five "sensitive" species of fish. The District feels that a watershed project will assist in implementing conservation practices that will greatly improve water quality and enhance biological and recreational venues.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Competine Creek is an 8,653 acre subwatershed of Whitebreast Creek which drains directly to Lake Red Rock. The Marion Soil and Water Conservation District has prioritized water quality protection efforts within Competine Creek subwatershed because 1) this watershed has been identified as a significant contributor of sediment, nutrients, and bacteria to Competine Creek and Lake Red Rock, 2) the watershed provides unique outreach opportunities due to its unique rural and urban interface, and 3) by using a targeted approach to address water quality, the likelihood of successfully demonstrating water quality improvements is high due to its manageable size. The specific goals of this proposal to WIRB (Phase I) are to: 1) reduce sediment and nutrient delivery by 1787 tons and 2144 lbs by installing conservation practices on high priority agricultural land; and 2) install urban conservation practices that reduce the volume of peak flow, improve streambank stability, and promote infiltration of stormwater runoff before it enters Competine Creek. The Marion SWCD has assembled a unique group of partners and secured funding from multiple sources to implement this project.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Upper Catfish Creek is located in a 9,300-acre watershed that flows through two significant natural resources, Swiss Valley Park and Swiss Valley Nature Preserves, one of the largest nature preserves in the Midwest. According to DNR’s 2002 305(d) report, that portion of the creek within the park and preserve is classified as a Class B(CW) cold water stream of which a portion has naturally reproducing trout (one of only 30 in the state of Iowa with this capability). Urban sprawl is a real threat to the Upper Catfish Creek Watershed. Currently, 10% of the watershed is residential, but 27% is zoned residential or commercial. The watershed is near Dubuque city limits but the jurisdiction is in the county. Differing criteria for land development between city and county jurisdictions further entices developers to build in outlying areas. County leaders agree there is more that needs to be done and will work with municipalities on uniformity of regulations and follow-up measures. We propose to set up key urban conservation practice models that will address storm water runoff and water quality which can be learned about and viewed by city and county officials, engineers, developers, etc. This would be part of a larger initiative including an educational campaign, inter-jurisdictional planning, the development of a land use GIS database, and agricultural conservation practices. The successes coming out of and learned about this watershed will serve as a model to spread county-wide.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Lake Macbride is considered to be one of the top four lakes for fishing in the state of Iowa. It is widely used by the public and contributes significant economic benefits to the county. Lake Macbride is situated in the North Corridor which is one of the fastest growing areas in the state. The lake has a surface area of 940 acres and drains 16,205 acres. Lake Macbride is on the Iowa 303(d) list for excessive sediments and nutrients. In 2001, Lake Macbride State Park received over 2.5 million dollars from the Marine Fuel Tax and Fish and Wildlife Trust to install 2 silt basins and stabilize over 12 miles of shoreline in the lake. Also in 2001, the Johnson County SWCD received a WSPF allocation from DSC to address agriculture and urban runoff issues in the watershed. Section 319 funding was received in 2002 to continue watershed efforts to the present. A watershed assessment was completed in 2003 to guide watershed activities. In 2005, a TMDL was completed for the lake. Since 2001, over $645,000 dollars has been spent by landowners and funding partners to install conservation practices in the watershed. Watershed efforts have resulted in the reduction of over 4200 tons of soils from being delivered into Lake Macbride. Nutrient reductions have also occurred from the development of nutrient management plans on 2000 acres. The District is in the process of wrapping up watershed efforts on private land. A series of 13 structures is planned to be installed in the State Park over the next several years. One of the last remaining items that still needs addressed is 1,400 feet of eroding shoreline adjacent to Lake Macbride along Cottage Reserve Road. The road is under the jurisdiction of the Johnson County Board of Supervisors. Both the Board of Supervisors and the IDNR are willing to contribute substantial dollars to address the 250 tons of soil that are being directly delivered to Lake Macbride each year.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The enclosed project request for funding will address needed conservation work within the Storm Lake Watershed. The proposed conservation practices and activities have been planned for several years but due to funding limitations have not been completed. These innovative practices will address some of the remaining and hard to address problem areas of sediment and nutrient loading within the watershed. The four goals of this project are: installation of four in-stream Boulder Weirs, planting of native grasses around ten surface intakes, completion of three urban rain gardens and hiring of a part-time Iowater monitoring coordinator. Through the new Awaysis destination park project Storm Lake is truly placing a high value on our watershed and lake as a major asset to the area. Awaysis is a $30 million project that's success will hinge on maintaining the highest standards in regard to the water quality of the lake and its watershed.