23 resultados para The River
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Severe flooding occurred during July 19-25, 1999, in the Wapsipinicon and Cedar River Basins following two thunderstorms over northeast Iowa. During July 18-19, as much as 6 inches ofrainfall was centered over Cerro Gordo, Floyd, Mitchell, and Worth Counties. During July 20-21, a second storm occurred in which an additional rainfall of as much as 8 inches was centered over Chickasaw and Floyd Counties. The cumulative effect of the storms produced floods with new maximum peak discharges at the following streamflow-gaging stations: Wapsipinicon River near Tripoli, 19,400 cubic feet per second; Cedar River at Charles City, 31,200 cubic feet per second (recurrence interval about 90 years); Cedar River at Janesville, 42,200 cubic feet per second (recurrence interval about 80 years); and Flood Creek near Powersville, 19,000 cubic feet per second. Profiles of flood elevations for the July 1999 flood are presented in this report for selected reaches along the Wapsipinicon, Cedar, and Shell Rock Rivers and along Flood Creek. Information about the river basins, rain storms, and flooding are presented along with information on temporary bench marks and reference points in the Wapsipinicon and Cedar River Basins.
Resumo:
Report about the lower Des Monies River, found its existent to present. The changes of the river, it's history, people that live along the river and more.
Resumo:
Today you will be biking over the Iowa and Cedar rivers, two major rivers hit by the Iowa flood of 2008. Three miles northeast of North Liberty you’ll cross the Iowa River. The river crested on June 15, 2008 at a record 31.53 ft., three feet higher than the previous record during the flood of 1993. The flooding river caused extensive damage to the University of Iowa (see cover photo of Iowa Memorial Union taken by Univ. Relations, Univ. of Iowa), Coralville, and numerous smaller towns. The flooding of the Cedar River, which RAGBRAI will cross at Sutliff, caused even greater damage. At Cedar Rapids, the 2008 flood crest of 31.12 ft. was over 11 ft. higher than the previous record set in 1851! This massive amount of water inundated downtown Cedar Rapids, Palo, and Columbus Junction and caused massive damage to buildings and infrastructure. When crossing the Cedar River at Sutliff, be sure to look to your right to see the remains of the Historic Sutliff Bridge, one of the many casualties of the Iowa flood of 2008.
Resumo:
In May 2011, very heavy rains combined with above average snowpack caused reservoirs throughout the Upper Missouri River basin to swell. The river carried more water in May and June than it does in an average year. The six Iowa counties bordering the river—Fremont, Harrison, Mills, Monona, Pottawattamie and Woodbury—suffered from major flooding which persisted throughout the spring and summer. On June 2, Governor Terry Branstad issued a Proclamation of Disaster Emergency for the six impacted counties. The Iowa Homeland Security and Emergency Management Division (HSEMD) activated the State Emergency Operations Center (SEOC) on June 10 to coordinate State, Federal, private sector, and voluntary agency preparedness and response activities in the affected area. The severity and duration of the flooding presented operational challenges for the SEOC and its partner agencies, which were further complicated by severe weather. The flooding forced the SEOC to conduct simultaneous response and recovery operations for an usually long period of time. The Missouri River floods caused major economic losses in Western Iowa. As a result of these economic losses, President Barack Obama issued a Major Disaster Declaration (FEMA-1998-DR) which made six counties eligible for Federal Public Assistance. The disaster declaration was subsequently amended on October 18, making five counties eligible for Federal Individual Assistance.
Resumo:
The primary purposes of this investigation are: 1) To delineate flood plain deposits with different geologic and engineering properties. 2) To provide basic data necessary for any attempt at stabilizing flood plain deposits. The alluvial valley of the Missouri River adjacent to Iowa was chosen as the logical place to begin this study. The river forms the western boundary of the state for an airline distance of approximately 139 miles; and the flood plain varies from a maximum width of approximately 18 miles (Plates 2 and 3, Sheets 75 and 75L) to approximately 4 miles near Crescent, Iowa (Plate 8, Sheet 66). The area studied includes parts of Woodbury, Monona, Harrison, Pottawattamie, Mills, and Fremont counties in Iowa and parts of Dakota, Thurston, Burt, Washington, Douglas, Sarpy, Cass and Otoe counties in Nebraska. Plate l is an index map of the area under consideration.
Resumo:
The Yellow River Headwaters Watershed (YRHW) drains 26,730 acres of rural land within Winneshiek and Allamakee Counties. While portions of the river have been designated as a High Quality Resource by the State of Iowa, other portions appear on the State's 303(d) List of Impaired Waters due to excessive nutrients, sediment and other water quality issues. The Winneshiek SWCD was fortunate enough to secure WSPF/WPF funds for FY2009 to begin addressing many of the sources of the identified problems, especially along the all-to-critical stream corridor. Initial landowner I producer interest has exceeded expectations and several key BMPs have been installed within the identified critical areas. Yet due to the current budget constraints in the WSPF/WPF programs, we currently have greater landowner I producer interest than we do funds, which is why the District is applying for WIRB funding, to provide supplemental incentives to continue the installation of needed Grade Stabilization Structures, Terraces and Manure Management Systems in identified critical areas. Other funding, currently available to the District, will cover the remaining portions of the project's budget, including staff and our outreach efforts.
Resumo:
The Mississippi River Trail (MRT) is a world-class bicycle trail that will follow the Mississippi River all the way from its headwaters in Minnesota to the Gulf of Mexico. The trail is partially completed; much of it is still in the planning and development stages. When complete, the MRT will Link over 2,000 miles of recreational trails through 10 states, including 280 miles in Iowa. Designated as a National Millennium Trail, the MRT will preserve natural environments along the river, stimulate economic growth in river communities, and provide bicyclists access to a variety of landscapes, history, and culture. The Iowa Department of Transportation commissioned the Center for Transportation Research and Education at Iowa State University to develop a plan for a safe, economically beneficial, and scenic MRT route through Iowa. This report presents the MRT plan for Iowa. It is organized in the following chapters: Executive Summary; (1) Introduction - vision statement and objectives; (2) Iowa MRT Minimum Design Standards; (3) Iowa MRT Route Analysis; (4) Recommended Improvement Plan; (5) MRT Implementation; and (6) Estimated Benefits and Impacts of the Iowa MRT. Additional information is provided in the following appendices: (A) GIS Analysis for the MRT; (B) Iowa MRT Maps; (C) Public Input; (D) Public Comments; and (E) References.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.
Resumo:
The purpose of this memorandum is to document the benefit-cost analysis of the river crossing concept alternatives described in the "Concept Alternatives Technical Memo." Benefit-cost studies are designed to measure, in dollars, the potential positive or negative impacts of large-scale construction projects. The concept alternatives analyzed include improvements to the Union Pacific Railroad (UPRR) River Crossing and the U.S. Highway 30 (U.S. 30) River Crossing.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.
Resumo:
Iowa has nearly 72,000 miles of streams. With one week of camping, miles of paddling, on-going educational opportunities, and hundreds of dedicated and hard-working Iowans, Project AWARE can make a difference – one stretch of river, one week a year, one piece of trash at a time. If it seems like a vacation to the participants…it is. They just learn and improve the river as they go.