34 resultados para Test, Black-box testing

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Research activities during this period concentrated on continuation of field and laboratory testing for the Dallas County test road. Stationary ditch collection of dust was eliminated because of inconsistent data, and because of vandalism to collectors. Braking tests were developed and initiated to evaluate the influence of treatments on braking and safety characteristics of the test sections. Dust testing was initiated for out of the wheelpath conditions as well as in the wheelpath. Contrary to the results obtained during the summer and fall of 1987, the 1.5 percent bentonite treatment appears to be outperforming the other bentonite treated sections after over a year of service. Overall dust reduction appears to average between 25 to 35 percent. Dallas County applied 300 tons per mile of class A roadstone maintenance surfacing to the test road in August 1988. Test data indicates that the bentonite is capable of interacting and functioning to reduce dust generation of the new surfacing material. Again, the 1.5 percent bentonite treatment appeared the most effective. The fine particulate bonding and aggregation mechanism of the bentonite appears recoverable from the environmental effects of winter, and from alternating wet and dry road surface conditions. The magnesium chloride treatment appears capable of long-term (over one year) dust reduction and exhibited an overall average reduction in the range of 15 to 30 percent. The magnesium chloride treatment also appears capable of interacting with newly applied crushed stone to reduce dust generation. Two additional one mile test roads were to have been constructed early this year. Due to an extremely dry spring and summer, construction scheduling was not possible until August. This would have allowed only minimal data collection. Considering this and the fact that this was an atypically dry summer, it was our opinion that it would be in the best interest of the research project to extend the project (at no additional cost) for a period of one year. The two additional test roads will be constructed in early spring 1989 in Adair and Marion counties.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBISB) system for use with accelerated construction. A typical PMBISB is comprised of five to six precast MBISB panels and is used on low volume roads, on short spans, and is installed and fabricated by county forces. Precast abutment caps and a precast abutment backwall were also developed by BHC for use with the PMBISB. The objective of the research was to gain knowledge of the global behavior of the bridge system in the field, to quantify the strength and behavior of the individual precast components, and to develop a more time efficient panel-to-panel field connection. Precast components tested in the laboratory include two precast abutment caps, three different types of deck panel connections, and a precast abutment backwall. The abutment caps and backwall were tested for behavior and strength. The three panel-to-panel connections were tested in the lab for strength and were evaluated based on cost and constructability. Two PMBISB were tested in the field to determine stresses, lateral distribution characteristics, and overall global behavior.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A new paint testing device was built to determine the resistance of paints to darkening due to road grime being tracked onto them. The device consists of a tire rotating on a sample drum. Soil was applied to the tire and then tracked onto paint samples which were attached to the drum. A colorimeter was used to measure the lightness of the paints after being tracked. Lightness is measured from 0 (absolute black) to 100 (absolute white). Four experiments were run to determine the optimum time length to track a sample, the reproducibility, the effects of different soils, and the maximum acceptable level for darkening of a paint. The following conclusions were reached: 1) the optimum tracking time was 10 minutes; 2) the reproducibility had a standard deviation of 1.5 lightness units; 3) different soils did not have a large effect on the amount of darkening on the paints; 4) a maximum acceptable darkness could not be established based on the limited amount of data; and 5) a correlation exists between the paints which were darkening in the field and the paints which were turning the darkest on the tracking wheel.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Iowa Law Enforcement Academy Council, in recognizing the importance of physical fitness status for job performance, established this physical test regimen as a employment standard effective February 15, 1993. No person can be selected or appointed as a law enforcement officer without first successfully passing all of the elements of this test. (See 501 IAC 2.1, adopted pursuant to Section 80B.11(5), Code of Iowa.) Upon entry into the Academy every candidate will be given the same test as an assessment for training purposes and to ensure that each recruit can undergo the physical demands of the Academy without undue risk of injury, and with a level of fatigue tolerance to meet all Academy requirements. If at the time of entrance into the Academy an officer does not meet minimum standards, he or she will not be admitted. This pamphlet will provide information on the rationale, purpose, testing procedures, standards of performance and fitness activities to prepare for the fitness testing. It is intended to answer the basic questions pertaining to all aspects of the fitness testing process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The present research project was designed to identify the typical Iowa material input values that are required by the Mechanistic-Empirical Pavement Design Guide (MEPDG) for the Level 3 concrete pavement design. It was also designed to investigate the existing equations that might be used to predict Iowa pavement concrete for the Level 2 pavement design. In this project, over 20,000 data were collected from the Iowa Department of Transportation (DOT) and other sources. These data, most of which were concrete compressive strength, slump, air content, and unit weight data, were synthesized and their statistical parameters (such as the mean values and standard variations) were analyzed. Based on the analyses, the typical input values of Iowa pavement concrete, such as 28-day compressive strength (f’c), splitting tensile strength (fsp), elastic modulus (Ec), and modulus of rupture (MOR), were evaluated. The study indicates that the 28-day MOR of Iowa concrete is 646 + 51 psi, very close to the MEPDG default value (650 psi). The 28-day Ec of Iowa concrete (based only on two available data of the Iowa Curling and Warping project) is 4.82 + 0.28x106 psi, which is quite different from the MEPDG default value (3.93 x106 psi); therefore, the researchers recommend re-evaluating after more Iowa test data become available. The drying shrinkage (εc) of a typical Iowa concrete (C-3WR-C20 mix) was tested at Concrete Technology Laboratory (CTL). The test results show that the ultimate shrinkage of the concrete is about 454 microstrain and the time for the concrete to reach 50% of ultimate shrinkage is at 32 days; both of these values are very close to the MEPDG default values. The comparison of the Iowa test data and the MEPDG default values, as well as the recommendations on the input values to be used in MEPDG for Iowa PCC pavement design, are summarized in Table 20 of this report. The available equations for predicting the above-mentioned concrete properties were also assembled. The validity of these equations for Iowa concrete materials was examined. Multiple-parameters nonlinear regression analyses, along with the artificial neural network (ANN) method, were employed to investigate the relationships among Iowa concrete material properties and to modify the existing equations so as to be suitable for Iowa concrete materials. However, due to lack of necessary data sets, the relationships between Iowa concrete properties were established based on the limited data from CP Tech Center’s projects and ISU classes only. The researchers suggest that the resulting relationships be used by Iowa pavement design engineers as references only. The present study furthermore indicates that appropriately documenting concrete properties, including flexural strength, elastic modulus, and information on concrete mix design, is essential for updating the typical Iowa material input values and providing rational prediction equations for concrete pavement design in the future.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Currently, no standard mix design procedure is available for CIR-emulsion in Iowa. The CIR-foam mix design process developed during the previous phase is applied for CIR-emulsion mixtures with varying emulsified asphalt contents. Dynamic modulus test, dynamic creep test, static creep test and raveling test were conducted to evaluate the short- and long-term performance of CIR-emulsion mixtures at various testing temperatures and loading conditions. A potential benefit of this research is a better understanding of CIR-emulsion material properties in comparison with those of CIR-foam material that would allow for the selection of the most appropriate CIR technology and the type and amount of the optimum stabilization material. Dynamic modulus, flow number and flow time of CIR-emulsion mixtures using CSS-h were generally higher than those of HFMS-2p. Flow number and flow time of CIR-emulsion using RAP materials from Story County was higher than those from Clayton County. Flow number and flow time of CIR-emulsion with 0.5% emulsified asphalt was higher than CIR-emulsion with 1.0% or 1.5%. Raveling loss of CIR-emulsion with 1.5% emulsified was significantly less than those with 0.5% and 1.0%. Test results in terms of dynamic modulus, flow number, flow time and raveling loss of CIR-foam mixtures are generally better than those of CIR-emulsion mixtures. Given the limited RAP sources used for this study, it is recommended that the CIR-emulsion mix design procedure should be validated against several RAP sources and emulsion types.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results ofLRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured loaddisplacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Drilled shafts have been used in the US for more than 100 years in bridges and buildings as a deep foundation alternative. For many of these applications, the drilled shafts were designed using the Working Stress Design (WSD) approach. Even though WSD has been used successfully in the past, a move toward Load Resistance Factor Design (LRFD) for foundation applications began when the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000.The policy memorandum requires all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. This ensures compatibility between the superstructure and substructure designs, and provides a means of consistently incorporating sources of uncertainty into each load and resistance component. Regionally-calibrated LRFD resistance factors are permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy and competitiveness of drilled shafts. To achieve this goal, a database for Drilled SHAft Foundation Testing (DSHAFT) has been developed. DSHAFT is aimed at assimilating high quality drilled shaft test data from Iowa and the surrounding regions, and identifying the need for further tests in suitable soil profiles. This report introduces DSHAFT and demonstrates its features and capabilities, such as an easy-to-use storage and sharing tool for providing access to key information (e.g., soil classification details and cross-hole sonic logging reports). DSHAFT embodies a model for effective, regional LRFD calibration procedures consistent with PIle LOad Test (PILOT) database, which contains driven pile load tests accumulated from the state of Iowa. PILOT is now available for broader use at the project website: http://srg.cce.iastate.edu/lrfd/. DSHAFT, available in electronic form at http://srg.cce.iastate.edu/dshaft/, is currently comprised of 32 separate load tests provided by Illinois, Iowa, Minnesota, Missouri and Nebraska state departments of transportation and/or department of roads. In addition to serving as a manual for DSHAFT and providing a summary of the available data, this report provides a preliminary analysis of the load test data from Iowa, and will open up opportunities for others to share their data through this quality–assured process, thereby providing a platform to improve LRFD approach to drilled shafts, especially in the Midwest region.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of the investigation was the development of a test that would readily identify the potential of an aggregate to cause D-cracking because of its susceptivity to critical saturation. A Press-Ur-Meter was modified by replacing the air chamber with a one-inch diameter plastic tube calibrated in milli-. It was concluded that the pore index was sufficiently reliable to determine the D-cracking potential of limestone aggregates in all but a few cases where marginal results were obtained. Consistently poor or good results were always in agreement with established service records or concrete durability testing. In those instances where marginal results are obtained, the results of concrete durability testing should be considered when making the final determination of the D-cracking susceptibility of the aggregate in question. The following applications for the pore index test have been recommended for consideration: concrete durability testing be discontinued in the evaluation process of new aggregate sources with pore index results between 0-20 (Class 2 durability) and over 35 (Class 1) durability; composite aggregates with intermediate pore index results of 20-35 be tested on each stone type to facilitate the possible removal of low durability stone from the production process; and additional investigation should be made to evaluate the possibility of using the test to monitor and upgrade the acceptance of aggregate from sources associated with D-cracking.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The objective of this research project was to service load test a representative sample of old reinforced concrete bridges (some of them historic and some of them scheduled for demolition) with the results being used to create a database so the performance of similar bridges could be predicted. The types of bridges tested included two reinforced concrete open spandrel arches, two reinforced concrete filled spandrel arches, one reinforced concrete slab bridge, and one two span reinforced concrete stringer bridge. The testing of each bridge consisted of applying a static load at various locations on the bridges and monitoring strains and deflections in critical members. The load was applied by means of a tandem axle dump truck with varying magnitudes of load. At each load increment, the truck was stopped at predetermined transverse and longitudinal locations and strain and deflection data were obtained. The strain data obtained were then evaluated in relation to the strain values predicted by traditional analytical procedures and a carrying capacity of the bridges was determined based on the experimental data. The response of a majority of the bridges tested was considerably lower than that predicted by analysis. Thus, the safe load carrying capacities of the bridges were greater than those predicted by the analytical models, and in a few cases, the load carrying capacities were found to be three or four times greater than calculated values. However, the test results of one bridge were lower than those predicted by analysis and thus resulted in the analytical rating being reduced. The results of the testing verified that traditional analytical methods, in most instances, are conservative and that the safe load carrying capacities of a majority of the reinforced concrete bridges are considerably greater than what one would determine on the basis of analytical analysis alone. In extrapolating the results obtained from diagnostic load tests to levels greater than those placed on the bridge during the load test, care must be taken to ensure safe bridge performance at the higher load levels. To extrapolate the load test results from the bridges tested in this investigation, the method developed by Lichtenstein in NCHRP Project 12-28(13)A was used.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The characterization and categorization of coarse aggregates for use in portland cement concrete (PCC) pavements is a highly refined process at the Iowa Department of Transportation. Over the past 10 to 15 years, much effort has been directed at pursuing direct testing schemes to supplement or replace existing physical testing schemes. Direct testing refers to the process of directly measuring the chemical and mineralogical properties of an aggregate and then attempting to correlate those measured properties to historical performance information (i.e., field service record). This is in contrast to indirect measurement techniques, which generally attempt to extrapolate the performance of laboratory test specimens to expected field performance. The purpose of this research project was to investigate and refine the use of direct testing methods, such as X-ray analysis techniques and thermal analysis techniques, to categorize carbonate aggregates for use in portland cement concrete. The results of this study indicated that the general testing methods that are currently used to obtain data for estimating service life tend to be very reliable and have good to excellent repeatability. Several changes in the current techniques were recommended to enhance the long-term reliability of the carbonate database. These changes can be summarized as follows: (a) Limits that are more stringent need to be set on the maximum particle size in the samples subjected to testing. This should help to improve the reliability of all three of the test methods studied during this project. (b) X-ray diffraction testing needs to be refined to incorporate the use of an internal standard. This will help to minimize the influence of sample positioning errors and it will also allow for the calculation of the concentration of the various minerals present in the samples. (c) Thermal analysis data needs to be corrected for moisture content and clay content prior to calculating the carbonate content of the sample.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In May 1950 a proposal for a research project was submitted to the newly formed Iowa Highway Research Board for consideration and action. This project, designated RPSl by the Board, encompassed the study, development, preparation of preliminary plans and specifications for the construction of a wheel track to be used in the accelerated testing of highway pavements. The device envisioned in the proposal was a circular track about seventy-five feet in diameter equipped with a suitable automobile-tired device to test pavements about five feet in width laid into the track under regular construction practices by small scale construction equipment. The Board, upon review, revised and expanded the basic concepts of the project. The project as revised by the Board included a study of the feasibility of developing, constructing and operating an accelerated testing track in which pavements, bases and subgrades may be laid one full lane, or at least ten feet, in width by full size construction equipment in conformity with usual construction practices. The pavements so laid are to be subjected, during test, to conditions as nearly simulating actual traffic as possible.