15 resultados para Never the Hope Itself
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Moisture sensitivity of Hot Mix Asphalt (HMA) mixtures, generally called stripping, is a major form of distress in asphalt concrete pavement. It is characterized by the loss of adhesive bond between the asphalt binder and the aggregate (a failure of the bonding of the binder to the aggregate) or by a softening of the cohesive bonds within the asphalt binder (a failure within the binder itself), both of which are due to the action of loading under traffic in the presence of moisture. The evaluation of HMA moisture sensitivity has been divided into two categories: visual inspection test and mechanical test. However, most of them have been developed in pre-Superpave mix design. This research was undertaken to develop a protocol for evaluating the moisture sensitivity potential of HMA mixtures using the Nottingham Asphalt Tester (NAT). The mechanisms of HMA moisture sensitivity were reviewed and the test protocols using the NAT were developed. Different types of blends as moisture-sensitive groups and non-moisture-sensitive groups were used to evaluate the potential of the proposed test. The test results were analyzed with three parameters based on performance character: the retained flow number depending on critical permanent deformation failure (RFNP), the retained flow number depending on cohesion failure (RFNC), and energy ratio (ER). Analysis based on energy ratio of elastic strain (EREE ) at flow number of cohesion failure (FNC) has higher potential to evaluate the HMA moisture sensitivity than other parameters. If the measurement error in data-acquisition process is removed, analyses based on RFNP and RFNC would also have high potential to evaluate the HMA moisture sensitivity. The vacuum pressure saturation used in AASHTO T 283 and proposed test has a risk to damage specimen before the load applying.
Resumo:
At the heart of all concrete pavement projects is the concrete itself. This manual is intended as both a training tool and a reference to help concrete paving engineers, quality control personnel, specifiers, contractors, suppliers, technicians, and tradespeople bridge the gap between recent research and practice regarding optimizing the performance of concrete for pavements. Specifically, it will help readers do the following:
Resumo:
Moisture sensitivity of Hot Mix Asphalt (HMA) mixtures, generally called stripping, is a major form of distress in asphalt concrete pavement. It is characterized by the loss of adhesive bond between the asphalt binder and the aggregate (a failure of the bonding of the binder to the aggregate) or by a softening of the cohesive bonds within the asphalt binder (a failure within the binder itself), both of which are due to the action of loading under traffic in the presence of moisture. The evaluation of HMA moisture sensitivity has been divided into two categories: visual inspection test and mechanical test. However, most of them have been developed in pre-Superpave mix design. This research was undertaken to develop a protocol for evaluating the moisture sensitivity potential of HMA mixtures using the Nottingham Asphalt Tester (NAT). The mechanisms of HMA moisture sensitivity were reviewed and the test protocols using the NAT were developed. Different types of blends as moisture-sensitive groups and non-moisture-sensitive groups were used to evaluate the potential of the proposed test. The test results were analyzed with three parameters based on performance character: the retained flow number depending on critical permanent deformation failure (RFNP), the retained flow number depending on cohesion failure (RFNC), and energy ratio (ER). Analysis based on energy ratio of elastic strain (EREE ) at flow number of cohesion failure (FNC) has higher potential to evaluate the HMA moisture sensitivity than other parameters. If the measurement error in data-acquisition process is removed, analyses based on RFNP and RFNC would also have high potential to evaluate the HMA moisture sensitivity. The vacuum pressure saturation used in AASHTO T 283 and proposed test has a risk to damage specimen before the load applying.
Resumo:
Research project HR-234A was sponsored by the Iowa Highway Research Board and the Iowa Department of Transportation. In the preparation of this compilation of highway and street laws of Iowa, an attempt has been made to include those sections of the Iowa Code Annotated and Iowa Digest to which reference is frequently required by the Department of Transportation, counties, cities and towns in their conduct of highway and street administration, construction and maintenance. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of establishing, maintaining and administering a highway and street program. Because of the broad scope of highway and street work and the many interrelated provisions of Iowa law, and usable size, some Code provision which are insignificant to the principal subject were omitted out of necessity; others were omitted to avoid repetition. A general index is provided at the end of the text of this volume. Each major topic is divided into subtopics and is accompanied by appropriate Code sections. Specific section numbers as they appear in the Code are in.
Resumo:
The current study was initiated to quantify the stresses induced in critical details on the reinforcing jacket and the tower itself through the use of field instrumentation, load testing, and long-term monitoring. Strain gages were installed on the both the tower and the reinforcing jacket. Additional strain gages were installed on two anchor rods. Tests were conducted with and without the reinforcing jacket installed. Data were collected from all strain gages during static load testing and were used to study the stress distribution of the tower caused by known loads, both with and without the reinforcing jacket. The tower was tested dynamically by first applying a static load, and then quickly releasing the load causing the tower to vibrate freely. Furthermore, the tower was monitored over a period of over 1 year to obtain stress range histograms at the critical details to be used for a fatigue evaluation. Also during the long-term monitoring, triggered time-history data were recorded to study the wind loading phenomena that excite the tower.
Resumo:
Man’s never-ending search for better materials and construction methods and for techniques of analysis and design has overcome most of the early difficulties of bridge building. Scour of the stream bed, however, has remained a major cause of bridge failures ever since man learned to place piers and abutments in the stream in order to cross wide rivers. Considering the overall complexity of field conditions, it is not surprising that no generally accepted principles (not even rules of thumb) for the prediction of scour around bridge piers and abutments have evolved from field experience alone. The flow of individual streams exhibits a manifold variation, and great disparity exists among different rivers. The alignment, cross section, discharge, and slope of a stream must all be correlated with the scour phenomenon, and this in turn must be correlated with the characteristics of the bed material ranging from clays and fine silts to gravels and boulders. Finally, the effect of the shape of the obstruction itself-the pier or abutment-must be assessed. Since several of these factors are likely to vary with time to some degree, and since the scour phenomenon as well is inherently unsteady, sorting out the influence of each of the various factors is virtually impossible from field evidence alone. The experimental approach was chosen as the investigative method for this study, but with due recognition of the importance of field measurements and with the realization that the results must be interpreted so as to be compatible with the present-day theories of fluid mechanics and sediment transportation. This approach was chosen because, on the one hand, the factors affecting the scour phenomenon can be controlled in the laboratory to an extent that is not possible in the field, and, on the other hand, the model technique can be used to circumvent the present inadequate understanding of the phenomenon of the movement of sediment by flowing water. In order to obtain optimum results from the laboratory study, the program was arranged at the outset to include a related set of variables in each of several phases into which the whole problem was divided. The phases thus selected were : 1. Geometry of piers and abutments, 2. Hydraulics of the stream, 3. Characteristics of the sediment, 4. Geometry of channel shape and alignment.
Resumo:
One of the challenges that faces the winter maintainer is how much chemical to apply to the road under given conditions. Insufficient chemical can lead to the road surface becoming slick, and the road thus becoming unsafe. In all likelihood, additional applications will have to be made, requiring additional effort and use of resources. However, too much chemical can also be bad. While an excess of chemical will ensure (in most circumstances) that a safe road condition is achieved, it may also result in a substantial waste of chemical (with associated costs for this waste) and in ancillary damage to the road itself and to the surrounding environment. Ideally, one should apply what might be termed the “goldilocks” amount of chemical to the road: Not too much, and not too little, but just right. Of course the reality of winter maintenance makes achieving the “goldilocks” application rate somewhat of a fairy tale. In the midst of a severe storm, when conditions are poor and getting worse, the last thing on a plow operator’s mind is a minute adjustment in the amount of chemical being applied to the road. However, there may be considerable benefit and substantial savings to be achieved if chemical applications can be optimized to some degree, so that wastage is minimized without compromising safety. The goal of this study was to begin to develop such information through a series of laboratory studies in which the force needed to scrape ice from concrete blocks was measured, under a variety of chemical application conditions.
Resumo:
Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.
Resumo:
During 1986, the City of Des Moines placed an experimental asphaltic concrete overlay containing an ice-retardant additive (Verglimit) on Euclid Avenue (U.S. Highway 6). Verglimit is a chemical multi-component deicer which is added to the surface course of an asphalt overlay. The additive was uniformly distributed through the mix at the asphalt plant, which allows exposure of the particles as the finished surface wears under traffic. During a snowfall, the exposed particles attract and absorb moisture creating a deicing solution which dampens the pavement. The Verglimit additive used on this project cost $1,180 per metric ton. The Verglimit was added at a rate of 6.3% by weight, which was 126 pounds per ton, or $66.38 per ton of hot mix asphalt. The purchase of Verglimit additive was funded by the Iowa Department of Transportation through a research project recommended by the Highway Research Advisory Board. The pavement surface experienced severe wetting due to the additive's affinity for water immediately after the project was completed and during periods of high humidity. This wetting created slippery conditions both on the project itself and where vehicles tracked the additive. The only way to remove the slipperiness was by flushing the street with water. The ice-retardant overlay appears to perform as expected in reducing the adherence of ice and snow, especially at temperatures just below freezing. It performs better in light snowfalls than in heavy ones. The ice retardant overlay is effective in eliminating thin coatings of ice due to freezing drizzle or widespread frost. The accident data showed a reduction in the number of snow and ice related accidents but due to the low number of this type of accident the results are inconclusive.
Resumo:
Earthen fills and back slopes resulting from highway building and other construction projects pose problems with respect to erosion stabilization and establishing vegetation cover. Sediments from such slopes create stream pollution while the erosion itself results in maintenance problems. Furthermore, adverse conditions aggravated by erosion prevent satisfactory establishing of vegetative cover. A dense vegetative cover is very effective in controlling erosion but even with optimum weather and soil conditions there is a delay of about 10 weeks between seeding and the establishment of a vegetative cover. Under actual field conditions, 3 months to a year may elapse between completion of construction and establishment of a vegetative cover. A research project was initiated early in 1974 to determine the effectiveness of a rock mulch of crushed limestone aggregates in controlling soil losses on highway construction back slopes in Iowa and to find the influence of such treatments on stand establishment of grasses and legumes.
Resumo:
Research project HR-234 was sponsored by the Iowa Highway Research Board and the Iowa Department of Transportation. In the preparation of this compilation of highway and street laws of Iowa, an attempt has been made to include those sections of the Code to which reference is frequently required by the Department of Transportation, counties, cities and towns in their conduct of highway and street administration, construction and maintenance. Because of the broad scope of highway and street work and the many interrelated provisions of Iowa law, and in the interests of keeping this volume in a convenient and usable size, some Code provisions which have some bearing on the principal subject were of necessity omitted. The volume has been compiled in loose leaf form with the expectation that periodic updates will keep the reader informed regarding changes in the law and/or new laws. A general index is provided at the end of the text of this volume. Each major topic is divided into relevant subtopics and are accompanied by appropriate Code sections. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of establishing, maintaining and administering a highway and street system. The reader is cautioned to consult legal counsel on all matters beyond the scope of this text.
Resumo:
In 2004 Walnut Creek was placed on the 303d list of impaired water bodies for lack of aquatic life with biological causes. Sediment from farmland as well as the stream banks was listed as the most likely stressor. In response to this listing a preliminary watershed assessment was completed by the six counties which have land in the Walnut Creek watershed. Walnut Creek flows through portions of Shelby, Pottawattamie, Montgomery, Mills, Page, and Fremont Counties before reaching its confluence with the West Nishnabotna River. The preliminary study assessed resource concerns and evaluated anticipated landowner participation levels for the six Huc 12 sub-watersheds which divide the Walnut Creek basin. These preliminary assessments revealed a priority sub-watershed which lies between US Hwy 6 and Hwy 34. A development grant was then funded by the Division of Soil Conservation to conduct a detailed assessment of this area. The detailed assessment involved an assessment of the uplands as well as the stream itself. A better understanding of the resource concerns was gained through the assessment, allowing for a comprehensive watershed plan to be developed. A variety of best management practices will be necessary for our project to be a success, many of which will be funded by other sources besides the WIRB. This grant is the first request for funding submitted by the East Pottawattamie and Montgomery SWCDs’. This grant will serve as the first critical step in building what is destined to be a true watershed success story.
Resumo:
This report describes a study to evaluate Geopier® soil reinforcement technology in transportation construction. Three projects requiring settlement control were chosen for evaluation—an embankment foundation, a box culvert, and a bridge approach fill. For each project, construction observations, in situ soil testing, laboratory material characterization, and performance monitoring were carried out. For the embankment foundation project, Geopier elements were installed within and around an abutment footprint for the new I-35 overpass at the US Highway 5/Interstate 35 interchange in Des Moines, Iowa. Although the main focus of this investigation was to evaluate embankment foundation reinforcement using Geopier elements, a stone column reinforced soil provided an opportunity to compare systems. In situ testing included cone penetration tests (CPTs), pressuremeter tests (PMTs), Ko stepped blade tests, and borehole shear tests (BSTs), as well as laboratory material testing. Comparative stiffness and densities of Geopier elements and stone columns were evaluated based on full-scale modulus load tests and standard penetration tests. Vibrating wire settlement cells and total stress cells were installed to monitor settlement and stress concentration on the reinforcing elements and matrix soil. Settlement plates were also monitored by conventional optical survey methods. Results show that the Geopier system and the stone columns performed their intended functions. The second project involved settlement monitoring of a 4.2 m wide x 3.6 m high x 50 m long box culvert constructed beneath a bridge on Iowa Highway 191 south of Neola, Iowa. Geopier elements were installed to reduce total and differential settlement while ensuring the stability of the existing bridge pier foundations. Benefits of the box culvert and embankment fill included (1) ease of future roadway expansion and (2) continual service of the roadway throughout construction. Site investigations consisted of in situ testing including CPTs, PMTs, BSTs, and dilatometer tests. Consolidated drained triaxial compression tests, unconsolidated undrained triaxial compression test, oedometer tests, and Atterberg limit tests were conducted to define strength and consolidation parameters and soil index properties for classification. Vibrating wire settlement cells, total stress cells, and piezometers were installed for continuous monitoring during and after box culvert construction and fill placement. This project was successful at controlling settlement of the box culvert and preventing downdrag of the bridge foundations, but could have been enhanced by reducing the length of Geopier elements at the ends of the box culvert. This would have increased localized settlement while reducing overall differential settlement. The third project involved settlement monitoring of bridge approach fill sections reinforced with Geopier elements. Thirty Geopier elements, spaced 1.8 m apart in six rows of varying length, were installed on both sides of a new bridge on US Highway 18/218 near Charles City, Iowa. Based on the results of this project, it was determined that future applications of Geopier soil reinforcement should consider extending the elements deeper into the embankment foundation fill, not just the fill itself.
Resumo:
In the preparation of this compilation of drainage laws of Iowa, an attempt has been made to include those sections of the Code to which reference is frequently required by the State Highway Commission, Boards of Supervisors and County Engineers in the conduct of highway and road administration as it is affected by the Iowa drainage laws. Of necessity some Code provisions which have a bearing on the principal subject were omitted. Enactments of the 56th General Assembly which modify existing code sections have been included as part of the regular text of the Code sections included in this publication. THE USER IS CAUTIONED THAT THESE CODE SECTIONS, AS MODIFIED BY THE 56th GENERAL ASSEMBLY, ARE NOT A PART OF THE 1954 CODE OF IOWA AND ARE OFFICIAL ONLY INSOFAR AS THEY ARE PRINTED IN THE OFFICIAL PUBLICATION ACTS OF THE 56TH GENERAL ASSEMBLY. SINCE THE 57TH GENERAL ASSEMBLY IS IN SESSION DURING THE PRINTING OF THIS PUBLICATION, ENACTMENTS OF THAT BODY WHICH AMEND OR REPEAL SECTIONS SET OUT HEREIN ARE INCLUDED IN THE BACK OF THIS VOLUME ON THE PINK-COLORED PAPER. THE USER IS CAUTIONED IN USING THIS VOLUME TO REFER TO THE TABLE OF SECTIONS REPEALED OR AMENDED, ON THE PINK-COLORED PAPER AT THE BACK OF THIS VOLUME. This publication is offered with the hope and belief that it will prove to be of value and assistance to those concerned with the problems of administering a highway, road and drainage system.
Resumo:
The current means and methods of verifying that high-strength bolts have been properly tightened are very laborious and time consuming. In some cases, the techniques require special equipment and, in other cases, the verification itself may be somewhat subjective. While some commercially available verification techniques do exist, these options still have some limitations and might be considered costly options. The main objectives of this project were to explore high-strength bolt-tightening and verification techniques and to investigate the feasibility of developing and implementing new alternatives. A literature search and a survey of state departments of transportation (DOTs) were conducted to collect information on various bolt-tightening techniques such that an understanding of available and under-development techniques could be obtained. During the literature review, the requirements for materials, inspection, and installation methods outlined in the Research Council on Structural Connections specification were also reviewed and summarized. To guide the search for finding new alternatives and technology development, a working group meeting was held at the Iowa State University Institute for Transportation October 12, 2015. During the meeting, topics central to the research were discussed with Iowa DOT engineers and other professionals who have relevant experiences.