91 resultados para Meditation, Rehabilitation, alternative Therapien, Krebs
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite." It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive compared with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert to avoid deformation of the liner.
Resumo:
The Iowa demonstration project to promote the rehabilitation of bridge deck concrete by rebonding delaminations with injected epoxy is a 150 ft x 150 ft high truss bridge on Iowa route No. 210 over Indian Creek near Maxwell in Story County (Service level D, AADT-730, Inventory Rating HS-16.9, Operating Rating HS-25). The objective of this study was to evaluate the effectiveness of repairing a delaminated bridge deck by epoxy injection, specifically a bridge deck with a delaminated portland cement concrete overlay. Observations noted during the project lead to the following conclusions: The delaminations rebonded with epoxy have remained solid through five years. The percentage of delamination has stayed essentially the same for both the epoxy injected and non-repaired areas. Epoxy injection appears to be a practical, cost effective alternative to other forms of deck rehabilitation when undertaken at the proper time. Cost effectiveness would reduce dramatically if delayed until breakouts have occurred. On the other hand it would be a slow, labor intensive process if undertaken too early when delaminations are small.
Resumo:
Corroded, deteriorated, misaligned, and distorted drainage pipes can cause a serious threat to a roadway. Normal practice is to remove and replace the damaged drainage structure. An alternative method of rehabilitating these structures is to slip line them with a polyethylene liner. Twelve drainage structures were slip lined with polyethylene liners during 1994 in Iowa. Two types of liners installed were "Culvert Renew" and "Snap-Tite". It was found that the liners could be easily installed by most highway, county, and city maintenance departments. The liners restore the flow and increase the service life of the original drainage structure. The liners were found to be cost competitive with the removal and replacement of the existing drainage structure. Slip lining has the largest economic benefit when the roadway is paved, the culvert is under a deep fill, or traffic volumes are high. The annular space between the original pipe and the liner was filled with flowable mortar. Care should be taken to properly brace and grout the annular space between the liner and the culvert.
Resumo:
Agency Performance Plan
Resumo:
Review of Alternative Distribution Methodologies for the Street Construction Fund of the Cities
Resumo:
The Division of Criminal and Juvenile Justice Planning issued its first state legislation monitoring report in February 2002, covering the first six month’s impact of Senate File 543 on the justice system. SF 543, enacted during the 2001 legislative session, changed the maximum penalty for first-offense Burglary-3rd degree, and established new sentencing options available to the court: * An alternative determinate prison sentence for certain Class D felons * Extended felony sentence reconsideration from 90 days to one year
Resumo:
In 1996, the Iowa Division of Criminal and Juvenile Justice Planning was asked by the Governor’s Alliance on Substance Abuse (GASA) to examine the five Youthful Offender Programs (YOPs) that were in operation at that time. The focus of the original study was to describe the programs, their clientele, and two outcome measures (program completion and recidivism). One section of the report provided a detailed description of each of the five programs in operation at the time of the original study and the findings for each. Another section of the report highlighted program completion rates and recidivism rates. The Youthful Offender Programs were designed to operate as part of a partnership with a number of different agencies (county attorneys, the district departments of correctional services, and a variety of different treatment agencies) to provide a holistic approach in the rehabilitation of youthful offenders. These programs were designed specifically for offenders between the ages of 16 and 21 who had committed first time felonies or aggravated misdemeanors as an alternative to incarceration or in response to non-compliant probationer behaviors. Offenders who were 16 and 17 years of age had to have been waived to the adult court to be eligible for entry to the program.
Resumo:
This Council was mandated by the 1992 Amendments to the Rehabilitation Act. Report includes mission, Council duties, accomplishments throughout the year, and member biographies.
Resumo:
Report by Iowa Department of Transportation about pavements materials.
Resumo:
The State of Iowa currently has approximately 69,000 miles of unpaved secondary roads. Due to the low traffic count on these unpaved o nts as ng e two dust ed d roads, paving with asphalt or Portland cement concrete is not economical. Therefore to reduce dust production, the use of dust suppressants has been utilized for decades. This study was conducted to evaluate the effectiveness of several widely used dust suppressants through quantitative field testing on two of Iowa’s most widely used secondary road surface treatments: crushed limestone rock and alluvial sand/gravel. These commercially available dust suppressants included: lignin sulfonate, calcium chloride, and soybean oil soapstock. These suppressants were applied to 1000 ft test sections on four unpaved roads in Story County, Iowa. Tduplicate field conditions, the suppressants were applied as a surface spray once in early June and again in late August or early September. The four unpaved roads included two with crushed limestone rock and two with alluvial sand/gravel surface treatmewell as high and low traffic counts. The effectiveness of the dust suppressants was evaluated by comparing the dust produced on treated and untreated test sections. Dust collection was scheduled for 1, 2, 4, 6, and 8 weeks after each application, for a total testiperiod of 16 weeks. Results of a cost analysis between annual dust suppressant application and biennial aggregate replacement indicated that the cost of the dust suppressant, its transportation, and application were relatively high when compared to that of thaggregate types. Therefore, the biennial aggregate replacement is considered more economical than annual dust suppressant application, although the application of annual dust suppressant reduced the cost of road maintenance by 75 %. Results of thecollection indicated that the lignin sulfonate suppressant outperformed calcium chloride and soybean oil soapstock on all four unpavroads, the effect of the suppressants on the alluvial sand/gravel surface treatment was less than that on the crushed limestone rock, the residual effects of all the products seem reasonably well after blading, and the combination of alluvial sand/gravel surface treatment anhigh traffic count caused dust reduction to decrease dramatically.
Resumo:
State Audit Reports
Resumo:
The United States has invested large sums of resources in multiple conservation programs for agriculture over the past century. In this paper we focus on the impacts of program interactions. Specifically, using an integrated economic and bio-physical modeling framework, we consider the impacts of the presence of working land programs on a land retirement for an important agricultural region—the Upper Mississippi River Basin (UMRB). Compared to a land retirement only program, we find that the presence of a working land program for conservation tillage results in significantly lower predicted signups for land retirement at a given rental rate. We also find that the presence of both a large working land and land retirement program can result in more environmental benefits and income transfers than a land retirement only program can achieve.
Resumo:
Agency Performance Report
Resumo:
Agency Performance Report