The role of rural demand-responsive transit is changing, and with that change is coming an increasing need for technology. As long as rural transit was limited to a type of social service transportation for a specific set of clients who primarily traveled in groups to common meal sites, work centers for the disabled, or clinics in larger communities, a preset calendar augmented by notes on a yellow legal pad was sufficient to develop schedules. Any individual trips were arranged at least 24 to 48 hours ahead of time and were carefully scheduled the night before in half-hour or twenty-minute windows by a dispatcher who knew every lane in the service area. Since it took hours to build the schedule, any last-minute changes could wreak havoc with the plans and raise the stress level in the dispatch office. Nevertheless, given these parameters, a manual scheduling system worked for a small demand-responsive operation.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This research project was intended to produce a strategy for addressing current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting into and out of major employment centers in Iowa. There were two basic goals: (1) to develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas and (2) to focus efforts on routes that are major commuting routes at present and in the future. The project focused on four-lane expressways and two-lane arterials most likely to serve extensive commuter traffic. Available spatial and statistical data were used to identify existing and possible future problem corridors with respect to access management. The research team developed a scheme for ranking commuter routes based on their need for attention to access management. This project was able to produce rankings for corridors based on a variety of factors, including proportion of crashes that appear to be access-related, severity of those crashes, and potential for improvement along corridors. Frequency and loss were found to be highly rank correlated; because of this, these indicators were not used together in developing final priority rankings. Most of the highest ranked routes are on two-lane rural cross sections, but a few are four-lane expressways with at-grade private driveways and public road intersections. The most important conclusion of the ranking system is that many of the poor-performing corridors are located in a single Iowa Department of Transportation district near two urban areas--Des Moines and Ames. A comprehensive approach to managing access along commuting corridors should be developed first in this district since the potential benefits would be highest in that region.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
Many prairie restoration projects are hampered by a lack of knowledge on how to restore the high diversity found in prairies, while at the same time preventing the establishment of a large weedy component. Methods are needed to increase diversity and abundance of native species while minimizing exotic species invasions in both 1) newly planted restorations and 2) established restorations. We established an experiment in Story and Monona counties in 2005 to determine the effects of different native cover crop species and timing of seeding on the establishment of new prairie restorations. We found that adding a 30-species prairie mix in early spring led to diverse native communities, but adding the mix in the late summer or the following year after cover crops established led to low diversity communities dominated by exotics. The identity of cover crops affected communities less than timing of seed additions. A second seed addition added to ash after a spring fire in the seventh year (Monona County site) increased recruitment from the prairie mix slightly, but the increase was not enough to cause convergence in the treatments. Surprisingly, the second seed addition increased diversity only in communities that were already the most diverse (i.e., in plots seeded with the prairie mix in early spring before cover crops established). These results imply that 1) cover crops are not effective for establishing prairie and 2) over seeding into established plots may not be an easy and efficient way to increase native recruitment and lower weedy species abundances. Therefore, focusing on establishing high levels of recruitment and diversity and excluding weedy species during the critical time early in establishment should be a priority for new projects.