Resumo:
This is the final Report to the Iowa DOT Offices of Construction and the Highway Division for the calendar year 1999 research project entitled - Continuation of Benchmarking Project: Phase IV. This project continues efforts started in 1995 with the development of a performance measurement system. The performance measurements were used to identify areas that required improvement and process improvement teams (PITs) were launched to make recommendations for improvement. This report provides a brief historical background, documents Benchmark Steering Team Activities, describes measurement activities including the employee survey and collection of non-survey data. Then a retrospective of past PIT activities is given, which sets the stage for the substantial increase in PIT activity that occurred during the winter of 1998/9. Finally, the report closes with suggestions for future directions in Benchmarking Activity.
Resumo:
County engineers in Iowa face the dual problems of rapidly escalating costs and a decreasing rate of growth of revenues. Various priority systems are in use, ranking projects for inclusion in road improvement programs, but they generally have weaknesses when used to compare one project with another in a different location. The sufficiency rating system has proven to be a useful tool in developing a priority list of projects for primary road systems, but there are none currently in use for secondary road systems. Some elements of an existing system used for primary roads could be modified for use with secondary roads, but would require extensive changes. The research reported here, sponsored by the Iowa Department of Transportation, was undertaken to develop a sufficiency rating system which could be used for secondary roads in Iowa and to produce the necessary forms and instructions to aid county engineering personnel in their efforts to complete the ratings for roads within their county. If a usable system were available that would yield reasonable results, county engineers would have an additional tool available to assist them in arriving at a defensible road improvement program.
Resumo:
The overall objective of this experimental program was to obtain quantitative comparisons between leaded and nonleaded gasolines as used in a variety of Iowa State Highway Connnission vehicles. These quantitative comparisons were to be made in terms of exhaust emissions, maintenance costs and fuel economy.
Resumo:
(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1951, a total of 68,869 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2676 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads ----------------- $24,000,000 For secondary roads---------------- $41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) Unobligated available farm to market road funds are rapidly being placed under contract. (i) The letting of highway contracts is increasing rapidly. (j)- Iowa's highway program is estimated to cost $945,000,000 and will require twenty years to build. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.
Resumo:
(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1952, a total of 71,493 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2662 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads------------------$23,000,000 For secondary roads---------------- 41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) The surplus of farm to market road funds created during and immediately following the War have now been placed under contract, with only a minimum working balance remaining in the fund. (i) Iowa's highway program was estimated to cost $945,000,000 and to require twenty years to build, by the 1948 Legislative Committee. This estimate would now have to be increased due to price increases and higher required standards. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.
Resumo:
(a) Iowa has a total of 101,451 miles of rural roads, both primary and secondary. (b) On January 1, l954, a total of 77,024 miles of these rural roads were surfaced - mostly with gravel and crushed stone. This is 5,53l miles greater than on January l, 1952. (c) Additional roads are being surfaced at the rate of 2766 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 25.4 per cent from property taxes and special taxes......................................$29,708,546.67 63.7 per cent from road use taxes.......... 74,581,080.30 10.6 per cent from Federal Aid (1952 Act).. 12,424,000.00 0.3 per cent from miscellaneous receipts.. 287,922.86 ---- ------------- 100.0 $117,001,549.83 (f) Annual income under present laws, available for highway construction, is approximately, For primary roads $29,420,000.00 For secondary roads $44,328,000.00 In 19_3, $7,299,000 of secondary road construction funds was transferred to the maintenance fund. (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued.
Resumo:
A discussion of several issues related to road construction, including budget, legislation, maintenance, and pending improvements.
Resumo:
The goal of this research was to evaluate the needs of the intercity common carrier bus service in Iowa. Within the framework of the overall goal, the objectives were to: (1) Examine the detailed operating cost and revenue data of the intercity carriers in Iowa; (2) Develop a model or models to estimate demand in cities and corridors served by the bus industry; (3) Develop a cost function model for estimating a carrier's operating costs; (4) Establish the criteria to be used in assessing the need for changes in bus service; (5) Outline the procedures for estimating route operating costs and revenues and develop a matrix of community and social factors to be considered in evaluation; and (6) Present a case study to demonstrate the methodology. The results of the research are presented in the following chapters: (1) Introduction; (2) Intercity Bus Research and Development; (3) Operating Characteristics of Intercity Carriers in Iowa; (4) Commuter Carriers; (5) Passenger and Revenue Forecasting Models; (6) Operating Cost Relationships; (7) Social and General Welfare Aspects of Intercity Bus Service; (8) Case Study Analysis; and (9) Additional Service Considerations and Recommendations.
Resumo:
This report addresses delays to freight shippers. Although the focus is on just-in-time (JIT) businesses, the authors also note that non JIT businesses also suffer delays that impact their productivity. The table of contents lists the following headings: chapter 1 - introduction - a trial application: the Des Moines metropolitan area; structure of the report; chapter 2 - reliability at the forefront of freight transport demand - manufacturing and inventory; just-in-time operations in the U.S.; transportation consequences; summary; chapter 3 - JIT operations in Iowa - survey and sample; trucking activity and service; just-in-time truck transportation in Iowa; assessment of factors affecting truck transportation service; summary and conclusions; chapter 4 - travel time uncertainty induced by incidents - a probabilistic model for incident occurrences and durations; calculation of delay; trial application; conclusions; and chapter 5 - conclusions and recommendations - conclusions; recommendations.
Resumo:
Transportation and land-use are independent, inter-active systems. Land-use patterns shape local transportation demand, but transportation systems in turn influence land-use patterns. In attempting to satisfy transportation demand created by existing land-use patterns, transportation planners directly, if not always consciously or intentionally, influence future land-use patterns. This study examines that complex relationship. The purpose of the study was threefold: to compile the body of knowledge already existing; to apply this body of knowledge to the context of midsize cities in the Midwest; and, to make the knowledge accessible both to transportation planners and to public officials who make key decisions about land use.
Resumo:
Building on the policy directions advanced in the publication "Policy Strategies for Iowa in Making Major Road Investments", this report defines each policy issue and discusses how transportation can play a role in addressing it. Perspectives from several focus group meetings conducted in nine communities in Iowa are discussed. The report also examines available data pertaining to the issues. Finally, the report presents several specific recommendations dealing with issues on economic development, safety, choice of transportation modes, and financing transportation in the future. The recommendations are directed at proving the Iowa Transportation Commission with the best possible insights to be used in making investment decisions that will impact the quality of life in Iowa in future years.
Resumo:
The purpose of this memorandum is to document the benefit-cost analysis of the river crossing concept alternatives described in the "Concept Alternatives Technical Memo." Benefit-cost studies are designed to measure, in dollars, the potential positive or negative impacts of large-scale construction projects. The concept alternatives analyzed include improvements to the Union Pacific Railroad (UPRR) River Crossing and the U.S. Highway 30 (U.S. 30) River Crossing.
Resumo:
This report is the product of a first-year research project in the University Transportation Centers Program. This project was carried out by an interdisciplinary research team at The University of Iowa's Public Policy Center. The project developed a computerized system to support decisions on locating facilities that serve rural areas while minimizing transportation costs. The system integrates transportation databases with algorithms that specify efficient locations and allocate demand efficiently to service regions; the results of these algorithms are used interactively by decision makers. The authors developed documentation for the system so that others could apply it to estimate the transportation and route requirements of alternative locations and identify locations that meet certain criteria with the least cost. The system was developed and tested on two transportation-related problems in Iowa, and this report uses these applications to illustrate how the system can be used.
Resumo:
This Task A Report summarizes the initial activities of the U.S. 20 Corridor Development Study. Task A constitutes a review of the portion of existing U.S. 20 from the Nebraska state line on the south side of Sioux City to the junction with U.S. 169 south of Ft. Dodge. · Preliminary study findings for this 119 mile corridor are summarized below.
Resumo:
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility