30 resultados para Design Build Project Delivery System

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report describes the work accomplished to date on research project HR-173, A Computer Based Information System for County Equipment Cost Records, and presents the initial design for this system. The specific topics discussed here are findings from the analysis of information needs, the system specifications developed from these findings, and the proposed system design based upon the system specifications. The initial system design will include tentative input designs for capturing input data, output designs to show the output formats and the items to be output for use in decision making, file design showing the organization of information to be kept on each piece of equipment in the computer data file, and general system design explaining how the entire system will operate. The Steering Committee appointed by Iowa Highway Research Board is asked to study this report, make appropriate suggestions, and give approval to the proposed design subject to any suggestions made. This approval will permit the designer to proceed promptly with the development of the computer program implementation phase of the design.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Currently, individuals including designers, contractors, and owners learn about the project requirements by studying a combination of paper and electronic copies of the construction documents including the drawings, specifications (standard and supplemental), road and bridge standard drawings, design criteria, contracts, addenda, and change orders. This can be a tedious process since one needs to go back and forth between the various documents (paper or electronic) to obtain information about the entire project. Object-oriented computer-aided design (OO-CAD) is an innovative technology that can bring a change to this process by graphical portrayal of information. OO-CAD allows users to point and click on portions of an object-oriented drawing that are then linked to relevant databases of information (e.g., specifications, procurement status, and shop drawings). The vision of this study is to turn paper-based design standards and construction specifications into an object-oriented design and specification (OODAS) system or a visual electronic reference library (ERL). Individuals can use the system through a handheld wireless book-size laptop that includes all of the necessary software for operating in a 3D environment. All parties involved in transportation projects can access all of the standards and requirements simultaneously using a 3D graphical interface. By using this system, users will have all of the design elements and all of the specifications readily available without concerns of omissions. A prototype object-oriented model was created and demonstrated to potential users representing counties, cities, and the state. Findings suggest that a system like this could improve productivity to find information by as much as 75% and provide a greater sense of confidence that all relevant information had been identified. It was also apparent that this system would be used by more people in construction than in design. There was also concern related to the cost to develop and maintain the complete system. The future direction should focus on a project-based system that can help the contractors and DOT inspectors find information (e.g., road standards, specifications, instructional memorandums) more rapidly as it pertains to a specific project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment. This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traumatic Brain Injury (TBI) impacts the lives of thousands of Iowans every year. TBI has been described as the “Silent Epidemic” because so often the scars are not visible to others. The affects of brain injury are cognitive, emotional, social, and can result in physical disability. In addition to the overwhelming challenges individuals with brain injury experience, families also face many difficulties in dealing with their loved one’s injury, and in navigating a service delivery system that can be confusing and frustrating. In 1998, the Iowa Department of Public Health (IDPH) conducted a comprehensive statewide needs assessment of brain injury in Iowa. This assessment led to the development of the first Iowa Plan for Brain Injury, “Coming Into Focus.” An updated state plan, the Iowa Plan for Brain Injuries 2002 – 2005, was developed, which reported on progress of the previous state plan, and outlined gaps in service delivery in Iowa. Four areas of focus were identified by the State Plan for Brain Injuries Task Force that included: 1) Expanding the Iowa Brain Injury Resource Network (IBIRN); 2) Promoting a Legislative and Policy Agenda, While Increasing Legislative Strength; 3) Enhancing Data Collection; and, 4) Increasing Funding. The IDPH utilized “Coming Into Focus” as the framework for an application to the federal TBI State Grant Program, which has resulted in more than $900,000 for plan implementation. Iowa continues to receive grant dollars through the TBI State Grant Program, which focuses on increasing capacity to serve Iowans with brain injury and their families. Highlighting the success of this grant project, in 2007 the IDPH received the federal TBI Program’s “Impacting Systems Change” Award. The Iowa Brain Injury Resource Network (IBIRN) is the product of nine years of TBI State Grant Program funding. The IBIRN was developed to ensure that Iowans got the information and support they needed after a loved one sustained a TBI. It consists of a hospital and service provider pre-discharge information and service linkage process, a resource facilitation program, a peer-to-peer volunteer support network, and a service provider training and technical assistance program. Currently over 90 public and private partners work with the IDPH and the Brain Injury Association of Iowa (BIA-IA) to administer the IBIRN system and ensure that families have a relevant and reliable location to turn for information and support. Further success was accomplished in 2006 when the Iowa legislature created the Brain Injury Services Program within the IDPH. This program consists of four components focusing on increasing access to services and improving the effectiveness of services available to individuals with TBI and their families, including: 1) HCBS Brain Injury Waiver-Eligible Component; 2) Cost Share Component; 3) Neuro-Resource Facilitation; and, 4) Enhanced Training. The Iowa legislature appropriated $2.4 million to the Brain Injury Services Program in state fiscal year (SFY) 2007, and increased that amount to $3.9 million in SFY 2008. The Cost Share Component models the HCBS Brain Injury Waiver menu of services but is available for Iowans who do not qualify functionally or financially for the Waiver. In addition, the Neuro-Resource Facilitation program links individuals with brain injury and their families to needed supports and services. The Iowa Plan for Brain Injury highlights the continued need for serving individuals with brain injury and their families. Additionally, the Plan outlines the paths of prevention and services, which will expand the current system and direct efforts into the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The need for upgrading a large number of understrength bridges in the United States has been well documented in the literature. This manual presents two methods for strengthening continuous-span composite bridges: post-tensioning of the positive moment regions of the bridge stringers and the addition of superimposed trusses at the piers. The use of these two systems is an efficient method of reducing flexural overstresses in undercapacity bridges. Before strengthening a given bridge however, other deficiencies (inadequate shear connection, fatigue problems, extensive corrosion) should be addressed. Since continuous-span composite bridges are indeterminant structures, there is longitudinal and transverse distribution of the strengthening axial forces and moments. This manual basically provides the engineer with a procedure for determining the distribution of strengthening forces and moments throughout the bridge. As a result of the longitudinal and transverse force distribution, the design methodology presented in this manual for continuous-span composite bridges is extremely complex. To simplify the procedure, a spreadsheet has been developed for use by practicing engineers. This design aid greatly simplifies the design of a strengthening system for a given bridge in that it eliminates numerous tedious hand calculations, computes the required force and moment fractions, and performs the necessary iterations for determining the required strengthening forces. The force and moment distribution fraction formulas developed in this manual are primarily for the Iowa DOT V12 and V14 three-span four-stringer bridges. These formulas may be used on other bridges if they are within the limits stated in this manual. Use of the distribution fraction formulas for bridges not within the stated limits is not recommended.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In coordination with a Technical Advisory Committee (TAC) consisting of County Engineers and Iowa DOT representatives, the Iowa DOT has proposed to develop a set of standards for a single span prefabricated bridge system for use on the local road system. The purpose of the bridge system is to improve bridge construction, accelerate project delivery, improve worker safety, be cost effective, reduce impacts to the travelling public by reducing traffic disruptions and the duration of detours, and allow local forces to construct the bridges. HDR Inc. was selected by the Iowa DOT to perform the initial concept screening of the bridge system. This Final Report summarizes the initial conceptual effort to investigate potential systems, make recommendations for a preferred system and propose initial details to be tested in the laboratory in Phase 2 of the project. The prefabricated bridge components were to be based on the following preliminary criteria set forth by the TAC. The criteria were to be verified and/ or modified as part of the conceptual development. - 24’ and 30’ roadway widths - Skews of 0o, 15o, and 30o - Span lengths of 30’ – 70’ in 10’ increments using precast concrete beams - Voided box beams could be considered - Limit precast element weight to 45,000 pounds for movement and placement of beams - Beams could be joined transversely with threaded rods - Abutment concepts may included precast as well as an option for cast-in-place abutments with pile foundations In addition to the above criteria, there was an interest to use a single-width prefabricated bridge component to simplify fabrication as well as a desire to utilize non-prestressed concrete systems where possible to allow for precasting of the beam modules by local forces or local precast plants. The SL-1 modular steel bridge rail was identified for use with this single span prefabricated bridge system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as Attolist) on the Iowa Falls Arch Bridge project and (2) develop a web-based project management system (WPMS) for projects under $10 million. For the first major effort, AEC-Sync was provided for the Iowa Department of Transportation (DOT) in a software as a service agreement, allowing the Iowa DOT to rapidly implement the solution with modest effort. During the 2010 fiscal year, the research team was able to help with the implementation process for the solution. The research team also collected feedback from the Broadway Viaduct project team members before the start of the project and implementation of the solution. For the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The result of the AEC-Sync implementation in the Broadway Viaduct project was a positive one. The project members were satisfied with the performance of AEC-Sync and how it facilitated document management and transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge project. During the 2012 fiscal year, the research team analyzed the post-project surveys for the Iowa Falls Arch Bridge project AEC-Sync implementation and found a positive outcome when compared to the pre-project surveys. The second major effort for this project involved the identification and implementation of a WPMS solution for smaller bridge and highway projects. During the 2011 fiscal year, Microsoft SharePoint was selected to be implemented on these smaller highway projects. In this year, workflows for the shop/working drawings for the smaller highway projects specified in Section 1105 of the Iowa DOT Specifications were developed. These workflows will serve as the guide for the development of the SharePoint pages. In order to implement the Microsoft SharePoint pages, the effort of an integrated team proved to be vital because it brought together the expertise required from researchers, programmers, and webpage developers to develop the SharePoint pages.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The key goals in winter maintenance operations are preserving the safety and mobility of the traveling public. To do this, it is in general necessary to try to increase the friction of the road surface above the typical friction levels found on a snow or ice covered roadway. Because of prior work on the performance of abrasives (discussed in greater detail in chapter 2) a key concern when using abrasives has become how to ensure the greatest increase in pavement friction when using abrasives for the longest period of time. There are a number of ways in which the usage of abrasives can be optimized, and these methods are discussed and compared in this report. In addition, results of an Iowa DOT test of zero-velocity spreaders are presented. Additionally in this study the results of field studies conducted in Johnson County Iowa on the road surface friction of pavements treated with abrasive applications using different modes of delivery are presented. The experiments were not able to determine any significant difference in material placement performance between a standard delivery system and a chute based delivery system. The report makes a number of recommendations based upon the reviews and the experiments.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Booklet produced by the Iowa Civil Rights Commission for individuals who own, design, build, or develop multi-family housing.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Executive Summary Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.