27 resultados para Ccaat-box

em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is an increased interest in constructing Pre-Cast (PC) Twin and Triple Reinforced Concrete Box (RCB) culverts in Iowa due to the efficiency associated with their production in controlled environment and decrease of the construction time at the culvert sites. The design of the multi-barrel PC culverts is, however, based on guidelines for single-barrel cast-inplace (CIP) culverts despite that the PC and CIP culverts have different geometry. There is scarce information for multiplebarrel RCB culverts in general and even fewer on culverts with straight wingwalls as those designed by Iowa DOT. Overall, the transition from CIP to PC culverts requires additional information for improving the design specifications currently in use. Motivated by the need to fill these gaps, an experimental study was undertaken by IIHR-Hydroscience & Engineering. The goals of the study are to document flow performance curves and head losses at the culvert entrance for a various culvert geometry, flow conditions, and settings. The tests included single-, double- and triple-barrel PC and CIP culverts with two span-to-rise ratios set on mild and steep slopes. The tests also included optimization of the culvert geometry entrance by considering various configurations for the top bevel. The overall conclusion of the study is that by and large the current Iowa DOT design specifications for CIP culverts can be used for multi-barrel PC culvert design. For unsubmerged flow conditions the difference in the hydraulic performance curves and headloss coefficients for PC and CIP culverts are within the experimental uncertainty. Larger differences (specified by the study) are found for submerged conditions when the flow is increasingly constricted at the entrance in the culvert. The observed differentiation is less important for multi-barrel culverts as the influence of the wingwalls decreases with the increase of the number of barrels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge deck deterioration due to corrosive effect of deicers on reinforcing steel is a major problem facing many agencies. Cathodic protection is one method used to prevent reinforcing steel corrosion. The application of a direct current to the embedded reinforcing steel and a sacrificial anode protects the steel from corrosion. This 1992 project involved placing an Elgard Titanium Anode Mesh Cathodic Protection System on a bridge deck. The anode was fastened to the deck after the Class A repair-work and the overlay was placed using the Iowa Low Slump Dense Concrete System. The system was set up initially at 1 mA/sq ft.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main function of a roadway culvert is to effectively convey drainage flow during normal and extreme hydrologic conditions. This function is often impaired due to the sedimentation blockage of the culvert. This research sought to understand the mechanics of sedimentation process at multi-box culverts, and develop self-cleaning systems that flush out sediment deposits using the power of drainage flows. The research entailed field observations, laboratory experiments, and numerical simulations. The specific role of each of these investigative tools is summarized below: a) The field observations were aimed at understanding typical sedimentation patterns and their dependence on culvert geometry and hydrodynamic conditions during normal and extreme hydrologic events. b) The laboratory experiments were used for modeling sedimentation process observed insitu and for testing alternative self-cleaning concepts applied to culverts. The major tasks for the initial laboratory model study were to accurately replicate the culvert performance curves and the dynamics of sedimentation process, and to provide benchmark data for numerical simulation validation. c) The numerical simulations enhanced the understanding of the sedimentation processes and aided in testing flow cases complementary to those conducted in the model reducing the number of (more expensive) tests to be conducted in the laboratory. Using the findings acquired from the laboratory and simulation works, self-cleaning culvert concepts were developed and tested for a range of flow conditions. The screening of the alternative concepts was made through experimental studies in a 1:20 scale model guided by numerical simulations. To ensure the designs are effective, performance studies were finally conducted in a 1:20 hydraulic model using the most promising design alternatives to make sure that the proposed systems operate satisfactory under closer to natural scale conditions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents a method of analyzing Rigid Frames by use of the Conjugate Beam Theory. The development of the method along with an example is given. This method has been used to write a computer program for the analysis of twin box culverts. The culverts may be analyzed under any fill height and any of the standard truck loadings. The wall and slab thickness are increased by the computer program as necessary. The final result is steel requirements both for moment and shear, and the slab and wall thickness.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The following pages take the form of a refresher (or even beginning) course in culvert hydraulics, the experimental data being used to illustrate and substantiate the discussion rather than forming the principal exhibit as in the customary report. Even before speaking of culverts themselves, the writers have hence inserted basic material on the various flow phenomena involved in culvert operation, so that the subsequent treatment will not presume more than the reader already has in mind.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There is a nationwide need for a safe, efficient and cost effective transportation system. An essential component of this system is the bridges. Local agencies perhaps have an even greater task than federal and state agencies in maintaining the low volume road (LVR) bridge system due to lack of sufficient resources and funding. The primary focus of this study was to review the various aspects of off-system bridge design, rehabilitation, and replacement. Specifically, a reference report was developed to address common problems in LVR bridges. The source of information included both Iowa and national agencies. This report is intended to be a “user manual” or “tool box” of information, procedures and choices for county engineers to employ in the management of their bridge inventory plus identify areas and problems that need to be researched

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Critics of the U.S. proposal to the World Trade Organization (WTO) made in October 2005 are correct when they argue that adoption of the proposal would significantly reduce available support under the current farm program structure. Using historical prices and yields from 1980 to 2004, we estimate that loan rates would have to drop by 9 percent and target prices would have to drop by 10 percent in order to meet the proposed aggregate Amber Box and Blue Box limits. While this finding should cheer those who think that reform of U.S. farm programs is long overdue, it alarms those who want to maintain a strong safety net for U.S. agriculture. The dilemma of needing to reform farm programs while maintaining a strong safety net could be resolved by redesigning programs so that they target revenue rather than price. Building on a base of 70 percent Green Box income insurance, a program that provides a crop-specific revenue guarantee equal to 98 percent of the product of the current effective target price and expected county yield would fit into the proposed aggregate Amber and Blue Box limits. Payments would be triggered whenever the product of the season-average price and county average yield fell below this 98 percent revenue guarantee. Adding the proposed crop-specific constraints lowers the coverage level to 95 percent. Moving from programs that target price to ones that target revenue would eliminate the rationale for ad hoc disaster payments. Program payments would automatically arrive whenever significant crop losses or economic losses caused by low prices occurred. Also, much of the need for the complicated mechanism (the Standard Reinsurance Agreement) that transfers most risk of the U.S. crop insurance to the federal government would be eliminated because the federal government would directly assume the risk through farm programs. Changing the focus of federal farm programs from price targeting to revenue targeting would not be easy. Farmers have long relied on price supports and the knowledge that crop losses are often adequately covered by heavily subsidized crop insurance or by ad hoc disaster payments. Farmers and their leaders would only be willing to support a change to revenue targeting if they see that the current system is untenable in an era of tight federal budgets and WTO limits.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Of the approximately 25,000 bridges in Iowa, 28% are classified as structurally deficient, functionally obsolete, or both. Because many Iowa bridges require repair or replacement with a relatively limited funding base, there is a need to develop new bridge materials that may lead to longer life spans and reduced life-cycle costs. In addition, new and effective methods for determining the condition of structures are needed to identify when the useful life has expired or other maintenance is needed. Due to its unique alloy blend, high-performance steel (HPS) has been shown to have improved weldability, weathering capabilities, and fracture toughness than conventional structural steels. Since the development of HPS in the mid-1990s, numerous bridges using HPS girders have been constructed, and many have been economically built. The East 12th Street Bridge, which replaced a deteriorated box girder bridge, is Iowa’s first bridge constructed using HPS girders. The new structure is a two-span bridge that crosses I-235 in Des Moines, Iowa, providing one lane of traffic in each direction. A remote, continuous, fiber-optic based structural health monitoring (SHM) system for the bridge was developed using off-the-shelf technologies. In the system, sensors strategically located on the bridge collect raw strain data and then transfer the data via wireless communication to a gateway system at a nearby secure facility. The data are integrated and converted to text files before being uploaded automatically to a website that provides live strain data and a live video stream. A data storage/processing system at the Bridge Engineering Center in Ames, Iowa, permanently stores and processes the data files. Several processes are performed to check the overall system’s operation, eliminate temperature effects from the complete strain record, compute the global behavior of the bridge, and count strain cycles at the various sensor locations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Granular shoulders are an important element of the transportation system and are constantly subjected to performance problems due to wind- and water-induced erosion, rutting, edge drop-off, and slope irregularities. Such problems can directly affect drivers’ safety and often require regular maintenance. The present research study was undertaken to investigate the factors contributing to these performance problems and to propose new ideas to design and maintain granular shoulders while keeping ownership costs low. This report includes observations made during a field reconnaissance study, findings from an effort to stabilize the granular and subgrade layer at six shoulder test sections, and the results of a laboratory box study where a shoulder section overlying a soft foundation layer was simulated. Based on the research described in this report, the following changes are proposed to the construction and maintenance methods for granular shoulders: • A minimum CBR value for the granular and subgrade layer should be selected to alleviate edge drop-off and rutting formation. • For those constructing new shoulder sections, the design charts provided in this report can be used as a rapid guide based on an allowable rut depth. The charts can also be used to predict the behavior of existing shoulders. • In the case of existing shoulder sections overlying soft foundations, the use of geogrid or fly ash stabilization proved to be an effective technique for mitigating shoulder rutting.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

If you haven’t been in the market for new appliances during the past several years, you’re going to be surprised at how innovative and energy-efficient appliances have become. You’ll find energy-smart appliance choices in almost all price ranges. Before heading to the local appliance retailer or “big-box” store, measure the space the new appliance will occupy to make sure it will fit—and that there’s enough room to fully open the door (or lid), as well as adequate clearances for ventilation, plumbing connections and other hookups. Then go to the appliance manufacturers’ Web sites to look at product information, and make a list of questions and “must-have” and “nice-to-have-but-not-essential” features.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

If you haven’t been in the market for new appliances during the past several years, you’re going to be surprised at how innovative and energy-efficient appliances have become. You’ll find energy-smart appliance choices in almost all price ranges. Before heading to the local appliance retailer or “big-box” store, measure the space the new appliance will occupy to make sure it will fit—and that there’s enough room to fully open the door (or lid), as well as adequate clearances for ventilation, plumbing connections and other hookups. Then go to the appliance manufacturers’ Web sites to look at product information, and make a list of questions and “must-have” and “nice-to-have-but-not-essential” features.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the Iowa Department of Transportation (DOT) Office of Bridges and Structures. This project is another in a series of ABC bridge projects undertaken by the Iowa DOT. Buena Vista County, Iowa, with the assistance of the Iowa Department of Transportation (DOT) and the Bridge Engineering Center (BEC) at Iowa State University, constructed a two-lane single-span precast box girder bridge, using rapid construction techniques. The design involved the use of precast, pretensioned components for the bridge superstructure, substructure, and backwalls. This application and demonstration represents an important step in the development and advancement of these techniques in Iowa as well as nationwide. Prior funding for the design and construction of this bridge (including materials) was obtained through the FHWA Innovative Bridge Research and Deployment (IBRD) Program. The Iowa Highway Research Board (IHRB) provided additional funding to test and evaluate the bridge. This project directly addresses the IBRD goal of demonstrating (and documenting) the effectiveness of innovative materials and construction techniques for the construction of new bridge structures. Evaluation of performance was formulated through comparisons with design assumptions and recognized codes and standards including American Association of State Highway and Transportation Officials (AASHTO) specifications.