116 resultados para Capital costs
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Transportation and land-use are independent, inter-active systems. Land-use patterns shape local transportation demand, but transportation systems in turn influence land-use patterns. In attempting to satisfy transportation demand created by existing land-use patterns, transportation planners directly, if not always consciously or intentionally, influence future land-use patterns. This study examines that complex relationship. The purpose of the study was threefold: to compile the body of knowledge already existing; to apply this body of knowledge to the context of midsize cities in the Midwest; and, to make the knowledge accessible both to transportation planners and to public officials who make key decisions about land use.
Resumo:
The biodiesel industry in the United States has realized significant growth over the past decade through large increases in annual production and production capacity and a transition from smaller batch plants to larger-scale continuous producers. The larger, continuous-flow plants provide operating cost advantages over the smaller batch plants through their ability to capture co-products and reuse certain components in the production process. This paper uses a simple capital budgeting model developed by the authors along with production data supplied by industry sources to estimate production costs, return-on-investment levels, and break-even conditions for two common plant sizes (30 and 60 million gallon annual capacities) over a range of biodiesel and feedstock price levels. The analysis shows that the larger plant realizes returns to scale in both labor and capital costs, enabling the larger plant to pay up to $0.015 more per pound for the feedstock to achieve equivalent return levels as the smaller plant under the same conditions. The paper contributes to the growing literature on the biodiesel industry by using the most current conversion rates for the production technology and current price levels to estimate biodiesel production costs and potential plant performance, providing a useful follow-up to previous studies.
Resumo:
Iowa’s investment in the Chicago to Iowa City passenger rail service will produce more ongoing benefits than costs for Iowa residents and taxpayers over the next 30 years. An Iowa investment of $20.6 million will match a federal investment of $86.8 million for the capital costs of the Iowa segment of the Chicago to Iowa City service. Iowa’s share of the expected gap between revenues and operating and maintenance expense is estimated at $3 million annually. The economic analysis included in this document demonstrates the cost-effectiveness of the Iowa investments in the Chicago to Iowa City service and details the benefits that Iowa can expect from Iowa’s expenditures.
Resumo:
The proposed project will include the construction of a sanitary sewer collection system and a community gravel filter wastewater treatment system in the unsewered community of Maple River Junction in Carroll County. The system will be built to include approximately 1,150 feet of 4-inch sanitary sewer main, 3,540 feet of 4-inch service main an approximately 35 septic tanks. Some existing 4-inch PVC sewer piping as well as existing septic tanks in good condition will continue to be used in order to control capital costs.
Resumo:
Other Audit Reports
Resumo:
Clarke Community School District Independent Auditor's Reports Basic Financial Statements and Supplementary Information Schedule of Findings and Questioned Costs, June 30, 2004
Resumo:
City Audit Report
Resumo:
City Audit Report
Resumo:
Community School District Audit Report
Resumo:
Community College Audit Reports
Resumo:
County Audit Report
Resumo:
City Audit Report
Resumo:
Community College Audit Reports
Resumo:
County Audit Report
Resumo:
County Audit Report