18 resultados para 573 - Biologia general i teòrica
em Iowa Publications Online (IPO) - State Library, State of Iowa (Iowa), United States
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System (IPERS) I-Que Pension Administration System for the period March 24, 2009 through April 22, 2009
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System (IPERS) Legacy and I-Que Pension Administration Systems for the period May 16, 2011 through June 16, 2011
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s (DAS) Human Resource Information System (HRIS), Payroll, Integrated Information for Iowa (I/3) and E-Payment Engine Systems for the periods April 13, 2009 through May 15, 2009 and April 5, 2010 through May 7, 2010
Resumo:
Congress established the State Children's Health Insurance Program (SCHIP) with passage of the Balanced Budget Act of 1997, which authorized $40 billion for the SCHIP program through Federal Fiscal Year (FFY) 2007. Under the program, a federal block grant was awarded to states to provide health insurance to children from families with income about Medicaid eligibility levels.
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period June 18, 2012 through July 11, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Department of Administrative Service’s Human Resource Information System (HRIS), Payroll System and Integrated Information for Iowa System (I/3) for the period March 26, 2012 through April 27, 2012
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 20, 2013 through July 12, 2013
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System I-Que Pension Administration System for the period May 5, 2014 through July 1, 2014
Resumo:
For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades in relation to the adoption of the Load and Resistance Factor Design (LRFD) approach into geotechnical design. With the goal of producing engineered designs with consistent levels of reliability, the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000, requiring all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. Likewise, regionally calibrated LRFD resistance factors were permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy of bridge foundation elements. Thus, projects TR-573, TR-583 and TR-584 were undertaken by a research team at Iowa State University’s Bridge Engineering Center with the goal of developing resistance factors for pile design using available pile static load test data. To accomplish this goal, the available data were first analyzed for reliability and then placed in a newly designed relational database management system termed PIle LOad Tests (PILOT), to which this first volume of the final report for project TR-573 is dedicated. PILOT is an amalgamated, electronic source of information consisting of both static and dynamic data for pile load tests conducted in the State of Iowa. The database, which includes historical data on pile load tests dating back to 1966, is intended for use in the establishment of LRFD resistance factors for design and construction control of driven pile foundations in Iowa. Although a considerable amount of geotechnical and pile load test data is available in literature as well as in various State Department of Transportation files, PILOT is one of the first regional databases to be exclusively used in the development of LRFD resistance factors for the design and construction control of driven pile foundations. Currently providing an electronically organized assimilation of geotechnical and pile load test data for 274 piles of various types (e.g., steel H-shaped, timber, pipe, Monotube, and concrete), PILOT (http://srg.cce.iastate.edu/lrfd/) is on par with such familiar national databases used in the calibration of LRFD resistance factors for pile foundations as the FHWA’s Deep Foundation Load Test Database. By narrowing geographical boundaries while maintaining a high number of pile load tests, PILOT exemplifies a model for effective regional LRFD calibration procedures.
Resumo:
Report on a review of selected general and application controls over the Iowa Public Employees’ Retirement System (IPERS) I-QUE Pension Administration System for the period April 9, 2015 through May 7, 2015
Resumo:
This report reflects one entire fiscal year of the Accountable Care Act changes. One of those changes was the method of how eligibility on January 2014, changing the income levels to 168 percent to 302 percent of the Federal Poverty Level.
Resumo:
The Federal Highway Administration (FHWA) and the Departments of Transportation in Texas, Oklahoma, Kansas, Missouri, Iowa and Minnesota combined their efforts to conduct a study of Interstate Highway 35 (I-35) from Laredo, Texas to Duluth, Minnesota. The purpose of the study was to assess the need for improved local, intrastate, interstate, and international service on I-35 and to clearly define a general feasible improvement plan to address those needs
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: "Should I Buy the Service Contract?"
Resumo:
A t the request of the Iowa State Highway Commission, the Engineering Research Institute observed the traffic operations at the Interstate 29 (1-29) and Interstate 80 (1-80) interchange in the southwest part of Council Bluffs. The general location of the site is shown in Figure 1. Before limiting the analysis to the diverging area the project staff drove the entire Council Bluffs freeway system and consulted with M r . Philip Hassenstab (Iowa State Highway Commission, District 4, Resident Maintenance Engineer at Council Bluffs). The final study scope was delineated as encompassing only the operational characteristics of the diverge area where 1-29 South and 1-80 East divide and the ramp to merge area where 1-80 West joins 1-29 North (both areas being contained within the aforementioned interchange). Supplementing the traffic operations scope, was an effort to delineate and document the applicability of video-tape techniques to traffic engineering studies and analyses. Documentation was primarily in the form of a demonstration video-tape.
Resumo:
I map of all committee meeting room during the legislative session for 2013.