184 resultados para laboratory waste


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Wayne-Ringgold-Decatur County Solid Waste Management Commission for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Pocahontas County Solid Waste Commission for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Delaware County Solid Waste Disposal Commission for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Crawford County Area Solid Waste Agency Commission for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth deck panels that were prestressed in the transverse direction, and after installation on the prestressed concrete girders, post-tensioned in the longitudinal direction. Prior to construction, laboratory tests were completed on the precast abutment and pier cap elements. The substructure testing was to determine the punching shear strength of the elements. Post-tensioning testing and verification of the precast deck system was performed in the field. The forces in the tendons provided by the contractor were verified and losses due to the post-tensioning operation were measured. The stress (strain) distribution in the deck panels due to the post-tensioning was also measured and analyzed. The entire construction process for this bridge system was documented. Representatives from the Boone County Engineers Office, the prime contractor, precast fabricator, and researchers from Iowa State University provided feedback and suggestions for improving the constructability of this design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed in 2007 over a stream. The bridge’s precast elements included precast cap beams and precast box girders. Precast element fabrication and bridge construction were observed, two precast box girders were tested in the laboratory, and the completed bridge was field tested in 2007 and 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa DOT Office of Bridges and Structures. Black Hawk County (BHC) has developed a precast modified beam-in-slab bridge (PMBISB) system for use with accelerated construction. A typical PMBISB is comprised of five to six precast MBISB panels and is used on low volume roads, on short spans, and is installed and fabricated by county forces. Precast abutment caps and a precast abutment backwall were also developed by BHC for use with the PMBISB. The objective of the research was to gain knowledge of the global behavior of the bridge system in the field, to quantify the strength and behavior of the individual precast components, and to develop a more time efficient panel-to-panel field connection. Precast components tested in the laboratory include two precast abutment caps, three different types of deck panel connections, and a precast abutment backwall. The abutment caps and backwall were tested for behavior and strength. The three panel-to-panel connections were tested in the lab for strength and were evaluated based on cost and constructability. Two PMBISB were tested in the field to determine stresses, lateral distribution characteristics, and overall global behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Currently, no standard mix design procedure is available for CIR-emulsion in Iowa. The CIR-foam mix design process developed during the previous phase is applied for CIR-emulsion mixtures with varying emulsified asphalt contents. Dynamic modulus test, dynamic creep test, static creep test and raveling test were conducted to evaluate the short- and long-term performance of CIR-emulsion mixtures at various testing temperatures and loading conditions. A potential benefit of this research is a better understanding of CIR-emulsion material properties in comparison with those of CIR-foam material that would allow for the selection of the most appropriate CIR technology and the type and amount of the optimum stabilization material. Dynamic modulus, flow number and flow time of CIR-emulsion mixtures using CSS-h were generally higher than those of HFMS-2p. Flow number and flow time of CIR-emulsion using RAP materials from Story County was higher than those from Clayton County. Flow number and flow time of CIR-emulsion with 0.5% emulsified asphalt was higher than CIR-emulsion with 1.0% or 1.5%. Raveling loss of CIR-emulsion with 1.5% emulsified was significantly less than those with 0.5% and 1.0%. Test results in terms of dynamic modulus, flow number, flow time and raveling loss of CIR-foam mixtures are generally better than those of CIR-emulsion mixtures. Given the limited RAP sources used for this study, it is recommended that the CIR-emulsion mix design procedure should be validated against several RAP sources and emulsion types.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Rathbun Area Solid Waste Commission for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Hamilton County Solid Waste Commission for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Shelby County Area Solid Waste Agency for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Newsletter for Department of Natural Resources, Waste Management Division

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Butler County Solid Waste Commission for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Pocahontas County Solid Waste Commission for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Wayne-Ringgold-Decatur County Solid Waste Management Commission for the year ended June 30, 2012