108 resultados para Economic expansion


Relevância:

20.00% 20.00%

Publicador:

Resumo:

There have been a multitude of programs providing assistance to the state of Iowa in the past 18 months. Springtime 2008 disasters resulted in tornado damage and widespread flood damage to large fractions of the state. In consequence, there was a very large flow of federal and state resources dedicated to assisting community and statewide recovery efforts. The nation was in recession as well and continued to be in recession through much of 2009. A sizeable amount of assistance found its way to Iowa under the American Recovery and Reinvestment Act of 2009 in the forms of infrastructure stimulus spending, income supports and other safety net spending for households, and stabilization assistance for essential public services like education. On top of that, the state of Iowa authorized the I Jobs program as an additional infrastructure development program, and as a jobs stimulus program. The total amount of spending for all types of programs, disaster or economic recovery related, is perhaps as high as $7.5 billion over the next few years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on applying agreed-upon procedures of Kossuth Connections, Algona, Iowa, and the Iowa Commission on Volunteer Services within the Iowa Department of Economic Development, now known as the Iowa Economic Development Authority, for the period October 2010 through June 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Iowa Department of Economic Development for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Transportation Equity Act of the 21st Century (TEA-21) (23 CFR) mandated environmental streamlining in order to improve transportation project delivery without compromising environmental protection. In accordance with TEA-21, the environmental review process for this project has been documented as a Streamlined Environmental Assessment (EA). This document addresses only those resources or features that apply to the project. This allowed study and discussion of resources present in the study area, rather than expend effort on resources that were either not present or not impacted. Although not all resources are discussed in the EA, they were considered during the planning process and are documented in the Streamlined Resource Summary, shown in Appendix A. The following table shows the resources considered during the environmental review for this project. The first column with a check means the resource is present in the project area. The second column with a check means the impact to the resource warrants more discussion in this document. The other listed resources have been reviewed and are included in the Streamlined Resource Summary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report of the Iowa Economic Development Authority for the quarter ended March 31, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on the Iowa Economic Development Authority for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A newly completed study commissioned by the Iowa Office of Energy Independence shows increased jobs, tax revenue and economic activity as a result of Iowa Power Fund projects. The analysis is divided into two parts. Part I assesses the specific impacts of projects that have been funded directly. Part II offers an analysis of the long term impacts when projects are successfully replicated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agency Performance Plan, Iowa Department of Economic Development

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many of the bridges in the state of Iowa have type ‘CF’, ‘EE’, or ‘EF’ expansion joints installed in the bridge approach slabs. These joints, which are typically 4” wide, are currently filled with a foam expansion joint material that is covered with a sealant. Over time the sealant begins to pull off of the walls of the joint and it ultimately fails. The joint, which is now exposed to the weather, is then filled with water and solids. The foam joint material, which is lighter than water, floats out of the joint onto the highway. This foam resembles a large 4” X 6” plank and poses a threat to motorists. A possible solution to this problem would be to replace the foam material with rubber buffings. Rubber buffings are a by-product of the tire retread industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A newly completed study commissioned by the Iowa Office of Energy Independence shows increased jobs, tax revenue and economic activity as a result of Iowa Power Fund projects. The analysis is divided into two parts. Part I assesses the specific impacts of projects that have been funded directly. Part II offers an analysis of the long term impacts when projects are successfully replicated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to evaluate two experimental D.S. Brown, Type SL450 and one D.S. Brown, Type SL750 expansion assemblies to identify possible construction problems and to determine the long term performances. These joints were installed in Wapello County on Jefferson Street viaduct in Ottumwa, Iowa. Visual inspections were made yearly. There is an indication that there may be a slow leakage at all three joints. The joint assemblies have performed well.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of this research was to evaluate two experimental Acme MSB neoprene expansion assemblies to identify possible construction problems and to determine the long term performance. These joints were installed in Black Hawk County on the curved bridge of ramp H from US 218 to I-380 in Waterloo, Iowa. Visual inspections were made yearly. There is slow leakage at one joint and indication that there is some slow leakage of both joints. The joint assemblies have performed well.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was to determine possible construction problems and evaluate the performance of experimental joint seals. Joints were installed in Woodbury County on US 20 over the Missouri River. ACME-Beta B-520 joints were used. Visual inspections were made yearly. Although the joints performed well for eight years, they deteriorated rapidly and have failed. It was concluded these joints did not perform satisfactorily.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2013