This report discusses the feasibility of using infrared photoacoustic spectroscopy (PAS) as a viable technique that can quickly provide information on cement composition prior to use. The PAS technique is of interest because the cost is much lower than for other types of instrumentation used for mineral analysis, it requires virtually no sample preparation, and it can perform multi-component analysis in a matter of minutes. Feasibility of the technique was based on the ability of PAS to identify and quantify sulfate species and major cement matrix components. Strengths and limitations of the technique are presented.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The large volume of traffic on the interstate system makes it difficult to make pavement repairs. The maintenance crew needs 4-5 hours to break out the concrete to be replaced and prepare the hole for placing new concrete. Because of this it is usually noon before the patch can be placed. Since it is desirable to remove the barricades before dark there are only 7-8 hours for the concrete to reach the required strength. There exists a need for a concrete that can reach the necessary strength (modulus of rupture = 500 psi) in 7-8 hours. The purpose of this study is to determine if type III cement and/or an accelerator can be used in an M-4 mix to yield a fast setting patch with very little shrinkage. It is recognized that calcium chloride is a corrosive material and may therefore have detrimental effects upon the reinforcing steel. The study of these effects, however, is beyond the scope of this investigation.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

In recent years, ultra-thin whitetopping (UTW) has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavement. Numerous UTW projects have been constructed and tested, enabling researchers to identify key elements contributing to their successful performance. These elements include foundation support, interface bonding condition, portland cement concrete (PCC) overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. The interface bonding condition is the most important of these elements. It enables the pavement to act as a composite structure, thus reducing tensile stresses and allowing an ultra-thin PCC overlay to perform as intended. The Iowa Department of Transportation (Iowa DOT) UTW project (HR-559) initiated UTW in Iowa. The project is located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. The objective of this research was to investigate the interface bonding condition between an ultra-thin PCC overlay and an ACC base over time, considering the previously mentioned variables. This research lasted for five years, at which time it was extended an additional five years. The new phase of the project was initiated by removing cracked panels existing in the 2-inch thick PCC sections and replacing them with three inches of PCC. The project extension (TR 432) will provide an increased understanding of slab bonding conditions over a longer period, as well as knowledge regarding the behavior of the newly rehabilitated areas. In order to accomplish the goals of the project extension, Falling Weight Deflectometer (FWD) testing will continue to be conducted. Laboratory testing, field strain gage implementation, and coring will no longer be conducted. This report documents the planning and construction of the rehabilitation of HR 559 and the beginning of TR 432 during August of 1999.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The main sources of coarse aggregate for secondary slip form paving in Southwest Iowa exhibit undesirable "D" cracking. "D" cracking is a discoloration of the concrete caused by fine, hairline cracks. These cracks are caused by the freezing and thawing of moisture inside the coarse aggregate. The cracks are often hour glass shaped, are parallel to each other, and occur along saw joints. The B-4, a typical secondary mix, utilizes 50% fine aggregate and 50% coarse aggregate. It has been proposed that a concrete mix with less coarse aggregate and more fine aggregate might impede this type of deterioration. The Nebraska Standard 47B Mix, a 70% fine aggregate, and 30% coarse aggregate mix, as used by Nebraska Department of Roads produces concrete with ultimate strengths in excess of 4500 psi but because of the higher cost of cement (it is a six bag per cubic yard mix) is not competitive with our present secondary mixes. The sands of Southwest Iowa generally have poorer mortar strengths than the average Iowa Sand. Class V Aggregate also found in Southwest Iowa has a coarser sand fraction, therefore it has a better mortar strength, but exhibits an acidic reaction and therefore must be·used with limestone. This illustrates the need to find a mix for use in Southwest Iowa that possesses adequate strength and satisfactory durability at a low cost. The purpose of this study is to determine a concrete mix with an acceptable cement content which will produce physical properties similar to that of our present secondary paving mixes.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

A highway base course may be defined as a layer of granular material which lies immediately below the wearing surface of a pavement and must possess high resistance to deformation in order to withstand pressures imposed by traffic. A material commonly used for base course construction is crushed limestone. Sources of limestone, acceptable for highway bases in the state of Iowa, occur almost entirely in the Pennsylvanian, Mississippian and Devonian strata. Performance records of the latter two have been quite good, while material from the Pennsylvanian stratum has failed on numerous occasions. The study reported herein is one segment of an extensive research program on compacted crushed limestone used for flexible highway base courses. The primary goals of the total study are: 1. Determination of a suitable and realistic laboratory method of compaction. 2. Effect of gradation, and mineralogy of the fines, on shearing strength. 3. Possible improvement of the shear strength with organic and inorganic chemical stabilization additives. Although the study reported herein deals primarily with the third goal, information gathered from work on the first two was required for this investigation. The primary goal of this study was the evaluation of various factors of stability of three crushed limestones when treated with small amounts of type I Portland cement. Investigation of the untreated materials has indicated that shear strength alone is not the controlling factor for stability of crushed stone bases. Thus the following observations were made in addition to shear strength parameters, to more adequately ascertain the stability of the cement treated materials: 1. Volume change during consolidation and shear testing. 2. Pore pressure during shear. The consolidated-undrained triaxial shear test was used for determination of the above factors.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Stopping and turning maneuvers on high traffic volume asphalt cement concrete surfaced roads and streets often causes distortion of the pavement. Distortion may show up as excessive rutting in the wheel path, shoving of the pavement and/or rippling of the surface. Often times repeated corrective work such as cold milling or heater planing is required in these areas to maintain the pavement surface in a reasonable condition. In recent years polymer additives have been developed for asphalt cement concrete paving mixes that show promise in improving the inplace stability of the pavements. AC-13 (Styrelf 13) available from Bitucote Products Company, St. Louis, Missouri is an asphalt cement that has been modified by an additive to exhibit characteristics of very high stability in asphalt mixes.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

The primary reason for using steam in the curing of concrete is to produce a high early strength. This high early strength is very desirable to the manufacturers of precast and prestressed concrete units, which often require expensive forms or stress beds. They want to remove the forms and move the units to storage yards as soon as possible. The minimum time between casting and moving the units is usually governed by the strength of the concrete. Steam curing accelerates the gain in strength at early ages, but the uncontrolled use of steam may seriously affect the growth in strength at later ages. The research described in this report was prompted by the need to establish realistic controls and specifications for the steam curing of pretensioned, prestressed concrete bridge beams and concrete culvert pipe manufactured in central plants. The complete project encompasses a series of laboratory and field investigations conducted over a period of approximately three years.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

A Research Project involving two, three, four and five inches of bonded Portland Cement Concrete Overlay on a 1.3 mile Portland Cement Concrete pavement was conducted in Clayton County, Iowa, during September, 1977, centering on the following objectives: 1. Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense Portland Cement Concrete mixture using standard mixes with super-water reducing admixtures; 2. Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced Portland Cement Concrete resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super-water reducing admixtures; 3. Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced Portland Cement Concrete can be obtained with only special surface cleaning and no surface removal or grinding.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

An Iowa D.O.T. Laboratory built machine was constructed for the chloride permeability testing of concrete by measuring electric current through a specimen between a salt solution and a base solution. This study had two purposes. The first was to evaluate the machine's performance. To do this, three concrete mixes were made consisting of different cement factors and water/cement ratios. Each mix was tested for chloride ion content by the 90- day salt ponding method and for chloride permeability at a 28-day cure by the permeability machine. The results from each test were evaluated to see if there was correlation between chloride ion content and the chloride permeability. It was determined that there was a correlation and that the permeability machine was satisfactory for determining chloride permeability in concrete. The second purpose of this study was to examine the effects that pozzolans have on the chloride permeability of concrete. Four mixes were made: one without any pozzolans as a control, one with class C fly ash, one with class F fly ash, and one with silica fume. Specimens from each mix were evaluated for chloride ion content by the 90-day salt ponding test and by the laboratory built machine for chloride permeability after curing 28 days. Specimens from these mixes were also taken from the salt ponding slabs after completion of the ponding test to examine the effect chloride ion content has on the operation of the chloride permeability machine. Specimens containing pozzolans were also examined for chloride permeability after a cure of 180 days. It was determined that the addition of pozzolans to concrete lowers the chloride permeability as measured by the permeability machine. Class F fly ash and silica fume in the concrete had a major effect in lowering the chloride permeability in concrete as measured by the permeability machine.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

If adequately designed and high quality material and good construction practices are used, portland cement concrete is very durable. This is demonstrated by the oldest pavement in Iowa (second oldest in the U.S.) paved in 1904, which performed well for 70 years without resurfacing. The design thickness is an important factor in both the performance and cost of pavement. The objective of this paper is to provide a 30-year performance evaluation of a pavement constructed to determine the required design thickness for low volume secondary roadways. In 1951 Greene County and the Iowa Highway Research Board of the Iowa Department of Transportation initiated a four-mile (6.4 km) demonstration project to evaluate thicknesses ranging from 4-1/2" (11.4 cm) to 6" (15.2 cm). The project, consisting of 10 research sections, was formed pavement placed on a gravel roadbed with very little preparation except for redistribution of the loose aggregate. Eight sections were non-reinforced except for centerline tie bars and no contraction joints were used. Mesh reinforcing and contraction joints spaced at 29' 7" (9.02 m) intervals were used in two 4-1/2" (11.4 cm) thick sections. The only air entrained section was non-reinforced. The pavement performed well over its 30-year life carrying a light volume of traffic and did not require major maintenance. There was substantial cracking with average slab length varying directly with thickness. The 4-1/2" (11.4 cm) thick non-air entrained, mesh-reinforced pavement with contraction joints has performed the best.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

This report covers the construction in 1961 of the soil-cement base and related pavement structure on Iowa 37 from Soldier to Dunlap, (F-861(6), Crawford, Harrison, Monona). The report also contains an account of the experimental work performed on the same road under research project HR-75.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Stopping and turning maneuvers on high traffic volume asphalt cement concrete surfaced roads and streets often cause distortion of the pavement. Distortion may show up as excessive rutting in the wheel path, shoving of the pavement and/or rippling of the surface. Often times repeated corrective work such as cold milling or heater planing is required in these areas to maintain the pavement surface in a reasonable condition. In recent years polymer additives have been developed for asphalt cement concrete paving mixes that show promise in improving the inplace stability of the pavements. AC-13 (Styrelf 13) available from Bitucote Products Company, St. Louis, Missouri is an asphalt cement that has been modified by an additive to exhibit characteristics of very high stability in asphalt mixes.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa has evaluated the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC). This was the sixth project using this process. The project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed during this research with the surface course to be let at a later date. There were four test sections, two sections with conventional mixtures and two with ARC mixtures. There were no significant differences in placement or performance between the two mix types. The cost of the ARC mixture was significantly higher.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

Transverse joints are placed in portland cement concrete pavements to control the development of random cracking due to stresses induced by moisture and thermal gradients and restrained slab movement. These joints are strengthened through the use of load transfer devices, typically dowel bars, designed to transfer load across the joint from one pavement slab to the next. Epoxy coated steel bars are the materials of choice at the present time, but have experienced some difficulties with resistance to corrosion from deicing salts. The research project investigated the use of alternative materials, dowel size and spacing to determine the benefits and limitations of each material. In this project two types of fiber composite materials, stainless steel solid dowels and epoxy coated dowels were tested for five years in side by side installation in a portion of U.S. 65 near Des Moines, Iowa, between 1997 and 2002. The work was directed at analyzing the load transfer characteristics of 8-in. vs. 12-in. spacing of the dowels and the alternative dowel materials, fiber composite (1.5- and 1.88-in. diameter) and stainless steel (1.5-in. diameter), compared to typical 1.5-in. diameter epoxy-coated steel dowels placed on 12-in. spacing. Data were collected biannually within each series of joints and variables in terms of load transfer in each lane (outer wheel path), visual distress, joint openings, and faulting in each wheel path. After five years of performance the following observations were made from the data collected. Each of the dowel materials is performing equally in terms of load transfer, joint movement and faulting. Stainless steel dowels are providing load transfer performance equal to or greater than epoxy-coated steel dowels at the end of five years. Fiber reinforced polymer (FRP) dowels of the sizes and materials tested should be spaced no greater than 8 in. apart to achieve comparable performance to epoxy coated dowels. No evidence of deterioration due to road salts was identified on any of the products tested. The relatively high cost of stainless steel solid and FRP dowels was a limitation at the time of this study conclusion. Work is continuing with the subject materials in laboratory studies to determine the proper shape, spacing, chemical composition and testing specification to make the FRP and stainless (clad or solid) dowels a viable alternative joint load transfer material for long lasting portland cement concrete pavements.

Relevância:

50.00% 50.00%

Publicador:

Resumo:

With the recent introduction of blended cements, many ready mix producers are using them as their sole source of cement. Iowa DOT specifications currently do not allow blended cements in patching due to their assumed slower strength gain. Patching specifications require opening at 5 hours on 2-lane or 10 hours on 4-lane pavement. This research will investigate early strength of concrete cast with ordinary Type I/II Portland cements and Type I(SM) blended Portland cements.