Blended Cement Patching Research, MLR-04-01, 2005
Data(s) |
01/03/2005
|
---|---|
Resumo |
With the recent introduction of blended cements, many ready mix producers are using them as their sole source of cement. Iowa DOT specifications currently do not allow blended cements in patching due to their assumed slower strength gain. Patching specifications require opening at 5 hours on 2-lane or 10 hours on 4-lane pavement. This research will investigate early strength of concrete cast with ordinary Type I/II Portland cements and Type I(SM) blended Portland cements. |
Formato |
|
Identificador |
http://publications.iowa.gov/19907/1/IADOT_mlr_04_01_Blended_Cement_Patching_Research_2005.pdf (2005) Blended Cement Patching Research, MLR-04-01, 2005. Transportation, Department of |
Idioma(s) |
en |
Relação |
http://publications.iowa.gov/19907/ |
Palavras-Chave | #Pavements #Concrete #Transportation #Materials #Research #Design and Construction #Maintenance and preservation |
Tipo |
Departmental Report NonPeerReviewed |