57 resultados para GENOCIDIO – HISTORIA - CAMBOYA - 1975-1979
Resumo:
The Materials and Research Departments cooperated in planning and performing Research Project HR-1004 during the summer of 1974. The Research Department agreed to accept responsibility for the final report; it has been delayed because of our efforts to obtain a maximum amount of information from the data by means of various statistical analyses. This memorandum contains all of the data, hopefully in a manner that will permit you to proceed with your consideration of an experimental project using cathodic protection for the CRCP steel. A more detailed report will be prepared at a later date.
Resumo:
Pavement marking materials other than conventional paint must be evaluated as environmental standards become more restrictive. The new EPA classification for solvents states that all oil paints are photochemically reactive and, therefore, contribute to smog. This will eventually result in the elimination of organic solvents from all paints, which may occur in Iowa by 1985. The Special Investigations Section of the Office of Materials field reviewed all urban and rural applications of pavement marking materials in the spring of 1979. The field review consisted of a visual estimation of percent marking missing, percent satisfactory, and percent non-satisfactory; reflective readings by ERMA; and notation of special conditions which may have impacted performance. ERMA was not effective in evaluating the reflective quality of pavement marking materials. No pavement marking materials evaluated have been successful enough to date to totally replace conventional painting methods.
Resumo:
Sufficient evidence was not discovered in this brief search to alter the general opinion that the Serviceability (Present Serviceability Index-PSI) - Performance Concepts developed by the AASHO Road Test provides the optimum engineering basis for pavement management. Use of these concepts in Iowa has the additional advantage in that we have a reasonable quantity of historical data over a period of time on the change in pavement condition as measured by PSI's. Some additional benefits would be the ability to better assess our needs with respect to those being recommended to Congress by AASHTO Committees. These concepts have been the basis used for developing policies on dimensions and weight of vehicles and highway needs which the AASHTO Transport Committees have recommended to the United States House Committee on Ways and Means. The first recommendation based on these concepts was made in the mid 1960's. Iowa's participation in the evaluation for this recommendation was under the direction of our present Director of Transportation, Mr. Raymond Kassel. PSI Indexes had to be derived from subjective surface ratings at that time. The most recent recommendation to Congress was made in November of 1977. Based on the rationale expressed above, a pilot study of the major part of the rural interstate system was conducted. The Objective of the study was to measure pavement performance through the use of the Present Serviceability Index (PSI) - Pavement Performance concepts as developed by the AASHO Road Test and to explore the usefulness of this type of data as a pavement management tool. Projects in the vicinity of the major urban centers were not included in this study due to the extra time that would be required to isolate accurate traffic data in these areas. Projects consisting of asphalt surface courses on crushed stone base sections were not included.
Resumo:
Water-surface-elevation profiles and peak discharges for the floods of July 12, 1972, March 19, 1979, and June 15, 1991, in the Turkey River Basin, northeast Iowa, are presented in this report. The profiles illustrate the 1979 and 1991 floods along the Turkey River in Fayette and Clayton Counties and along the Volga River in Clayton County; the 1991 flood along Roberts Creek in Clayton County and along Otter Creek in Fayette County; and the 1972 flood along the Turkey River in Winneshiek and Fayette Counties. Watersurface elevations for the flood of March 19, 1979, were collected by the Iowa Natural Resources Council. The June 15, 1991, flood on the Turkey River at Garber (station number 05412500) is the largest known flood-peak discharge at the streamflow-gaging station for the period 1902-95. The peak discharge for June 15, 1991, of 49,900 cubic feet per second was 1.4 times larger than the 100-year recurrence-interval discharge. The report provides information on flood stages and discharges and floodflow frequencies for streamflow-gaging stations in the Turkey River Basin using flood information collected during 1902-95. Information on temporary bench marks and reference points established in the Turkey River Basin during 1981, 1992, and 1996 also is included in the report. A flood history describes rainfall conditions for floods that occurred during 1922, 1947, 1972, 1979, and 1991.
Resumo:
This summary of legislation enacted by the General Assembly has been prepared for the use of legislators and other interested parties. The summary of each legislative enactment has been assigned to a major subject category. This compilation provides interested persons with quick reference to legislation enacted in specific areas and generally informs persons of the contents and effective date of the legislation. NOTE: This is a large file and may take a few minutes to load.
Resumo:
This summary of legislation enacted by the General Assembly has been prepared for the use of legislators and other interested parties. The summary of each legislative enactment has been assigned to a major subject category. This compilation provides interested persons with quick reference to legislation enacted in specific areas and generally informs persons of the contents and effective date of the legislation. NOTE: This is a large file and may take a few minutes to load.
Resumo:
This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.
Resumo:
Data tables describing the length and vehicle-miles of travel on Iowa's 1975 proposed interstate system, broken down by interstate. No text is available.
Resumo:
This manual provides a set of procedural rules and regulations for use in functionally classifying all roads and streets in Iowa according to the character of service they are intended to provide. Functional classification is a requirement of the 1973 Code of Iowa (Chapter 306) as amended by Senate File 1062 enacted by the 2nd session of the 65th General Assembly of Iowa. Functional classification is defined as the grouping of roads and streets into systems according to the character of service they will be expected to provide, and the assignment of jurisdiction over each class to the governmental unit having primary interest in each type of service. Stated objectives of the legislation are: "Functional classification will serve the legislator by providing an equitable basis for determination of proper source of tax support and providing for the assignment of financial resources to the governmental unit having responsibility for each class of service. Functional classification promotes the ability of the administrator to effectively prepare and carry out long range programs which reflect the transportation needs of the public." All roads and streets in legal existence will be classified. Instructions are also included in this manual for a continuous reporting to the Highway Commission of changes in classification and/or jurisdiction resulting from new construction, corporation line changes, relocations, and deletions. This continuous updating of records is absolutely essential for modern day transportation planning as it is the only possible way to monitor the status of existing road systems, and consequently determine adequacy and needs with accuracy.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.
Resumo:
This inventory of transit services in Iowa covers urban transit, intercity passenger bus carriers and charter operators, taxicab operations, rural transit services and special services, and includes the results of questionnaire and interview surveys, and the resulting recommendations. The recommendations urge a centralized source of data and expertise, a public information program, the utilization of federal aid, the continuance of existing transit services with no dimunition of service level, the establishment of new services in communities of over 20,000 population, the sponsorship of demonstrations in communities with populations of 10,000 to 20,000, and the development and improvement of rural transit service. Based on state and local community experience, recommendations are made concerning revenue sources to support transit in Iowa, and four alternative state transit assistance programs are presented.
Resumo:
As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. Two of these were incorporated into a comprehensive test program to study the behavior of old pin-connected high-truss single-lane bridges. The test program consisted of ultimate load tests, service load tests and a supplementary test program. The results reported in this report cover the service load tests on the two bridges as well as the supplementary tests, both static and fatigue, of eyebar members removed from the two bridges. The field test results of the service loading are compared with theoretical results of the truss analysis.