42 resultados para Homogeneous Curing
Resumo:
Crack formation has been a problem on some recently constructed bridges in Iowa. Drying shrinkage has been considered a contributing factor in that cracking. The study was undertaken to evaluate some of those material properties that contribute to the magnitude of drying shrinkage. Cement content, cement composition, fly ash and retarding admixture were the factors studied. Concrete prisms were cast for seven mixes and, after curing, were exposed to 100 deg F heat at ambient humidity for 280 days. The following were observed from the testing: (1) Higher C3A content cement concrete produced larger shrinkage; (2) Use of fly ash increased shrinkage; (3) Use of retarder increased shrinkage; and (4) Lowering the cement content reduced the shrinkage.
Resumo:
This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.
Resumo:
Examination of field portland cement concrete cores, from Iowa pavements with premature deterioration, reveals extensive infilling of calcium sulfate aluminum (CSA) compound in their air voids. A previous study (Phase I) has shown some evidence of the correlation between freeze-thaw durability of concretes and ettringite infilling. To further verify the previous observation, a more extensive experimental program was conducted in this Phase 2 study. A total of 101 concrete mixes were examined. Seven cements, six fly ashes, two water reducers and three coarse aggregates were used in the concrete mixes. Specimens were under moist curing for up to 223 days before being subjected to the freeze-thaw cycling. An environmental treatment consisting of three consecutive wet [70 deg F (21 deg C) in distilled water]/dry [120 deg F (49 deg C) in oven] cycles was applied to some specimens. Immediately prior to the freeze-thaw cycling, most specimens were examined by a low-vacuum scanning electron microscope (SEM) for their microstructure. The results obtained further demonstrate the correlation between concrete freeze-thaw response and CSA compound infilling in the air voids. The extent of the infilling depends on the period of moist curing as well as the wet/dry treatment. The extent of the infilling also relates to materials used. Concrete mixes with extensive infilling are more vulnerable to the freeze-thaw attack. Based on the obtained results, material criteria on cements and fly ashes for mainline paving were proposed for minimizing potential infilling of CSA compound in concrete.
Resumo:
The interrelation of curing time, curing temperature, strength, and reactions in lime-bentonite-water mixtures was examined. Samples were molded at constant density and moisture content and then cured for periods of from 1 to 56 days at constant temperatures that ranged from 5C to 60C. After the appropriate curing time the samples were tested for unconfined compressive strength. The broken samples were then analyzed by x-ray diffractometer and spectrophotometer to determine the identity of the reaction products present after each curing period. It was found that the strength gain of lime-clay mixtures cured at different temperatures is due to different phases of the complex reaction, lime & clay to CSH(gel) to CSH(II) to CSH(I) to tobermorite. The farther the reaction proceeds, the higher the strength. There was also evidence of lattice substitutions in the structure of the calcium silicate hydrates at curing temperatures of 50C and higher. No consistent relationship between time, temperature, strength, and the S/A ration of reaction products existed, but in order to achieve high strengths the apparent C/S ration had to be less than two. The curing temperature had an effect on the strength developed by a given amount of reacted silica in the cured lime-clay mixture, but at a given curing temperature the cured sample that had the largest amount of reacted silica gave the highest strength. Evidence was found to indicate that during the clay reaction some calcium is indeed adsorbed onto the clay structure rather than entering into a pozzolanic reaction. Finally, it was determined that it is possible to determine the amount of silica and alumina in lime-clay reaction products by spectrophotometric analysis with sufficient accuracy for comparison purposes. The spectrophotometric analysis techniques used during the investigation were simple and were not time consuming.
Resumo:
An Iowa D.O.T. Laboratory built machine was constructed for the chloride permeability testing of concrete by measuring electric current through a specimen between a salt solution and a base solution. This study had two purposes. The first was to evaluate the machine's performance. To do this, three concrete mixes were made consisting of different cement factors and water/cement ratios. Each mix was tested for chloride ion content by the 90- day salt ponding method and for chloride permeability at a 28-day cure by the permeability machine. The results from each test were evaluated to see if there was correlation between chloride ion content and the chloride permeability. It was determined that there was a correlation and that the permeability machine was satisfactory for determining chloride permeability in concrete. The second purpose of this study was to examine the effects that pozzolans have on the chloride permeability of concrete. Four mixes were made: one without any pozzolans as a control, one with class C fly ash, one with class F fly ash, and one with silica fume. Specimens from each mix were evaluated for chloride ion content by the 90-day salt ponding test and by the laboratory built machine for chloride permeability after curing 28 days. Specimens from these mixes were also taken from the salt ponding slabs after completion of the ponding test to examine the effect chloride ion content has on the operation of the chloride permeability machine. Specimens containing pozzolans were also examined for chloride permeability after a cure of 180 days. It was determined that the addition of pozzolans to concrete lowers the chloride permeability as measured by the permeability machine. Class F fly ash and silica fume in the concrete had a major effect in lowering the chloride permeability in concrete as measured by the permeability machine.
Resumo:
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.
Resumo:
The Iowa DOT has been using blended cements in ternary mixes since 1999. Use of these supplementary cementitious materials gives concrete with higher strengths and much lower permeability. Use of these materials has been incorporated for use in High Performance Concrete (HPC) decks to achieve lower permeability and thus long term performance. Since we have been using these materials in paving, it would be informative to determine what concrete pavement properties are enhanced as related to high performance concrete. The air void system was excellent at a spacing factor of 0.0047 in (0.120 mm). AVA spacing factor results are much higher than the hardened air void analysis. Although only 3 samples were tested between the image analysis air content and the RapidAir457, there is pretty good agreement between those test methods. Air void analysis indicates that excessive vibration was not required to place the concrete. Vibration was well within the specification limits with an average of 6683 vpm’s with a standard deviation of 461. Overall ride of the project was very good. The average smoothness for the project was 2.1 in/mile (33.8 mm/km). The International Roughness Index (IRI) was 81 in/mi (1.29 m/km). The compressive strength was 6260 psi (43.2 MPa) at 28 days and 6830 (47.1 MPa) at 56 days. The modulus of rupture by third point loading (MOR-TPL) tested at 28 days was 660 psi (4.55 MPa). The AASHTO T277 rapid chloride permeability results at 28 days using the Virginia cure method correlate fairly well with the 56 and 90 day results with standard curing. The Virginia cure method 28 day results were 2475 coulombs and the standard cure 56 and 90 day test results were 2180 and 2118, respectively.
Resumo:
Portland cement concrete is an outstanding structural material but stresses and cracks often occur in large structures due to drying shrinkage. The objective of this research was to determine the change in length due to loss of moisture from placement through complete drying of portland cement concrete. The drying shrinkage was determined for four different combinations of Iowa DOT structural concrete mix proportions and materials. The two mix proportions used were an Iowa DOT D57 (bridge deck mix proportions) and a water reduced modified C4 mix. Three 4"x 4"x 18" beams were made for each mix. After moist curing for three days, all beams were maintained in laboratory dry air and the length and weight were measured at 73°F ± 3°F. The temperature was cycled on alternate days from 73°F to 90°F through four months. From four months through six months, the temperature was cycled one day at 73°F and six days at 130°F. It took approximately six months for the concrete to reach a dry condition with these temperatures. The total drying shrinkage for the four mixes varied from .0106 in. to .0133 in. with an average of .0120 in. The rate of shrinkage was approximately .014% shrinkage per 1% moisture loss for all four mixes. The rate and total shrinkage for all four mixes was very similar and did not seem to depend on the type of coarse aggregate or the use of a retarder.
Resumo:
The effect of curing temperature, in the range of 4.4 to 22.8 degrees C (40 to 73 degrees F), on strength development was studied based on the maturity and pulse velocity measurements in this report. The strength-maturity relationships for various mixes using a Type I cement and using a Type IP cement, respectively, were experimentally developed. The similar curves for early age strength development of both the patching concrete, using a Type I cement with the addition of calcium chloride, and the fast track concrete, using a Type III cement and fly ash, have also been proposed. For the temperature ranges studied, the strength development of concrete can be determined using a pulse velocity measurement, but only for early ages up to 24 hours. These obtained relationships can be used to determine when a pavement can be opened to traffic. The amount of fly ash substitution, up to 30%, did not have a significant influence on the strength-maturity relationship.
Resumo:
A two-stage mixing process for concrete involves mixing a slurry of cementitious materials and water, then adding the slurry to coarse and fine aggregate to form concrete. Some research has indicated that this process might facilitate dispersion of cementitious materials and improve cement hydration, the characteristics of the interfacial transition zone (ITZ) between aggregate and paste, and concrete homogeneity. The goal of the study was to find optimal mixing procedures for production of a homogeneous and workable mixture and quality concrete using a two-stage mixing operation. The specific objectives of the study are as follows: (1) To achieve optimal mixing energy and time for a homogeneous cementitious material, (2) To characterize the homogeneity and flow property of the pastes, (3) To investigate effective methods for coating aggregate particles with cement slurry, (4) To study the effect of the two-stage mixing procedure on concrete properties, (5) To obtain the improved production rates. Parameters measured for Phase I included: heat of hydration, maturity, and rheology tests were performed on the fresh paste samples, and compressive strength, degree of hydration, and scanning electron microscope (SEM) imaging tests were conducted on the cured specimens. For Phases II and III tests included slump and air content on fresh concrete and compressive and tensile strengths, rapid air void analysis, and rapid chloride permeability on hardened concrete.
Resumo:
Use of bridge deck overlays is important in maximizing bridge service life. Overlays can replace the deteriorated part of the deck, thus extending the bridge life. Even though overlay construction avoids the construction of a whole new bridge deck, construction still takes significant time in re-opening the bridge to traffic. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. Reducing the construction time could have an effect on reducing the socioeconomic costs associated with bridge deck rehabilitation and the inconvenience caused to travelers. This work included three major tasks with literature review, field investigation, and laboratory testing. Overlay concrete mix used for present construction takes long curing hours and therefore an investigation was carried out to find fast-curing concrete mixes that could reduce construction time. Several fast-cuing concrete mixes were found and suggested for further evaluation. An on-going overlay construction project was observed and documented. Through these observations, several opportunities were suggested where small modifications in the process could lead to significant time savings. With current standards of the removal depth of substrate concrete in Iowa, it takes long hours for the removal process. Four different laboratory tests were performed with different loading conditions to determine the necessary substrate concrete removal depth for a proper bond between the substrate concrete and the new overlay concrete. Several parameters, such as failure load, bond stress, and stiffness, were compared for four different concrete removal depths. Through the results and observations of this investigation several conclusions were made which could reduce bridge deck overlay construction time.
Resumo:
Four series of five specimens each were investigated for static and fatigue strength. These four series differed in that there were two variables, the first being the subsidence of concrete around reinforcing bars and the second being shrinkage due to two different curing conditions. The combinations of these variables were then compared to each other by use of, load-deflection curves and S-H fatigue curves.