23 resultados para planting alternatives
Resumo:
Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.
Resumo:
Independence, respect, and equality are values important to all people. These values help define the concepts of autonomy (independence and freedom) and self-determination (the right to make decisions for one’s self). Because these rights are so valued in our society and are something that most of us would value for ourselves, the “least restrictive alternative” should always be considered before taking away a person’s civil and legal rights to make decisions for him or herself. The least restrictive alternative is an option, which allows a person to keep as much autonomy, and self-determination as possible while providing only the level of protection and supervision that is necessary. Some examples may include: representative payee for certain government benefit checks, joint bank accounts or advance directives for health care.
Resumo:
This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.
Wind Tunnel Analysis of the Effects of Planting at Highway Grade Separation Structures, HR-202, 1979
Resumo:
Blowing and drifting snow has been a problem for the highway maintenance engineer virtually since the inception of the automobile. In the early days, highway engineers were limited in their capability to design and construct drift free roadway cross sections, and the driving public tolerated the delays associated with snow storms. Modern technology, however, has long since provided the design expertise, financial resources, and construction capability for creating relatively snowdrift free highways, and the driver today has come to expect a highway facility that is free of snowdrifts, and if drifts develop they expect highway maintenance crews to open the highway within a short time. Highway administrators have responded to this charge for better control of snowdrifting. Modern highway designs in general provide an aerodynamic cross section that inhibits the deposition of snow on the roadway insofar as it is economically feasible to do so.
Resumo:
The North Fork Maquoketa River Headwaters (NFMRH) has been identified as impaired by nutrients, episodic slugs of ammonia and sediment. The NFMRH TMDL plan calls for a "phasing approach" to managing water quality when the origin is non-point source contaminants. This project will address phase 1 using a performance reward program for targeted cooperators to improve environmental index scores using cost-share, EQIP practices and flexible management alternatives. Pre-project assessments suggest that rewards should target refined management of erosion-prone fields and farms with livestock populations, which contribute to the P and N loads responsible for fertilizing filamentous algae blooms that depress dissolved oxygen concentrations in the NFMRH. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers to determine effective alternatives, such as no-till planting, to reduce nutrient and sediment delivery. These evironmental indexes will be especially useful for livestock producers in the livestock dense watershed. This project will extend a NRCS-sponsored Conservation Innovation Grant currently offered to producers in the Coffee Creek sub-watershed to a three-year, watershed-wide effort that will be necessary to make significant improvements in environmental management.
Resumo:
The goals of this project were to implement several stabilization methods for preventing or mitigating freeze-thaw damage to granular surfaced roads and identify the most effective and economical methods for the soil and climate conditions of Iowa. Several methods and technologies identified as potentially suitable for Iowa were selected from an extensive analysis of existing literature provided with Iowa Highway Research Board (IHRB) Project TR-632. Using the selected methods, demonstration sections were constructed in Hamilton County on a heavily traveled two-mile section of granular surfaced road that required frequent maintenance during previous thawing periods. Construction procedures and costs of the demonstration sections were documented, and subsequent maintenance requirements were tabulated through two seasonal freeze-thaw periods. Extensive laboratory and field tests were performed prior to construction, as well as before and after the two seasonal freeze-thaw periods, to monitor the performance of the demonstration sections. A weather station was installed at the project site and temperature sensors were embedded in the subgrade to monitor ground temperatures up to a depth of 5 ft and determine the duration and depths of ground freezing and thawing. An economic analysis was performed using the documented construction and maintenance costs, and the estimated cumulative costs per square yard were projected over a 20-year timeframe to determine break-even periods relative to the cost of continuing current maintenance practices. Overall, the sections with biaxial geogrid or macadam base courses had the best observed freeze-thaw performance in this study. These two stabilization methods have larger initial costs and longer break-even periods than aggregate columns, but counties should also weigh the benefits of improved ride quality and savings that these solutions can provide as excellent foundations for future paving or surface upgrades.
Resumo:
Report on a review of the Resource Enhancement and Protection (REAP) program and the Solid Waste Alternatives Program (SWAP) administered by the Department of Natural Resources (DNR) for the period July 1, 2009 through June 30, 2015
Resumo:
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility