28 resultados para hour


Relevância:

10.00% 10.00%

Publicador:

Resumo:

"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 3 - Road and Bridge Design. This module provides hands on examples of how to use metric measurements in the design of roads and structures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 5 - Motor Vehicle Enforcement. Examples from Iowa and Federal Motor Vehicle Codes are used as examples for hands on training for the vehicle enforcement type personnel using this module.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Record flooding occurred May 17-20, 1999, in the Volga and Wapsipinicon River Basins following thunderstorm activity over northeast Iowa. On Sunday, May 16, between 6 and 8 inches of rain fell during a 24- hour period over portions of Bremer, Butler, and Fayette Counties. Highest rainfall during this 24-hour period was 8.3 inches recorded north of Oelwein in southwest Fayette County. A peak discharge of 29,800 cubic feet per second in the Volga River at Mederville, 53,900 cubic feet per second in the Turkey River at Garber, and 31, 100 cubic feet per second in the Wapsipinicon River at Independence set new peak discharge records. The peak discharge at Garber was greater than a theoretical 500-year flood, and the peak discharge at Independence was the equivalent of a 90- year flood. Information about the basins, rain storms, flooding, and a profile of high water marks are presented for selected intervals along the Volga River, Wapsipinicon River, Crane Creek, Little Wapsipinicon River, and Otter Creek.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Record flooding occurred June 15-17, 1998, in the Nishnabotna and East Nishnabotna River basins following severe thunderstorm activity over southwest Iowa. More than 8 inches of rain fell over a large part of Cass County. The rain gage at Atlantic, Iowa recorded a 24-hour total rainfall of 13.18 inches, which established a new official State record for the greatest amount of rainfall in a 24-hour period. The peak discharge was 41,400 cubic feet per second in the East Nishnabotna River near Atlantic, 60,500 cubic feet per second in the East Nishnabotna River at Red Oak, and 65,100 cubic feet per second in the Nishnabotna River above Hamburg. The peak discharge at Atlantic was greater than the theoretical 200-year flood and the peak discharges at Red Oak and Hamburg were greater than the respective theoretical 500-year floods. Information about the basin, the rain storms, the flooding, and a profile of high water marks at selected intervals along the Nishnabotna and East Nishnabotna Rivers are presented in this report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

There are projects where opening the pavement to traffic in less than the 5 to 7 days is needed, but an 8 to 12 hour opening time is not necessary. The study examined fast track concrete with Type I cement and admixtures. The variables studied were: (1) cure temperature, (2) cement brand, (3) accelerators, and (4) water reducers. A standard water reducer and curing blankets appear to be effective at producing a 24 hour to 36 hour opening strength. An accelerator and/or high range water reducer may produce opening strength in 12 to 24 hours. Calcium chloride was most effective at achieving high-early strength.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report summarizes the findings of a research which was intended to evaluate the concrete strength and opening time for the full depth patching projects in Iowa under cold weather and whether or not cold water could be allowed in the mix. This research was performed both in the laboratory and in the field. The results indicated that with the present specification the concrete strength after five hours for two-lane patches which requires hot water and calcium chloride is about 1,600 psi. Hence, if a higher strength is desired, a longer curing time is required. Hot water will have to be used and water reducer is not recommended for two-lane patches. On the other hand, the concrete strength for multi-lane patches with either hot or cold water approaches 4,000 psi in less than 24 hours. There was only a slight difference in compressive strengths between the 24-hour and 36-hours curing times.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main sources of coarse aggregate for secondary slip form paving in Southwest Iowa exhibit undesirable "D" cracking. "D" cracking is a discoloration of the concrete caused by fine, hairline cracks. These cracks are caused by the freezing and thawing of moisture inside the coarse aggregate. The cracks are often hour glass shaped, are parallel to each other, and occur along saw joints. The B-4, a typical secondary mix, utilizes 50% fine aggregate and 50% coarse aggregate. It has been proposed that a concrete mix with less coarse aggregate and more fine aggregate might impede this type of deterioration. The Nebraska Standard 47B Mix, a 70% fine aggregate, and 30% coarse aggregate mix, as used by Nebraska Department of Roads produces concrete with ultimate strengths in excess of 4500 psi but because of the higher cost of cement (it is a six bag per cubic yard mix) is not competitive with our present secondary mixes. The sands of Southwest Iowa generally have poorer mortar strengths than the average Iowa Sand. Class V Aggregate also found in Southwest Iowa has a coarser sand fraction, therefore it has a better mortar strength, but exhibits an acidic reaction and therefore must be·used with limestone. This illustrates the need to find a mix for use in Southwest Iowa that possesses adequate strength and satisfactory durability at a low cost. The purpose of this study is to determine a concrete mix with an acceptable cement content which will produce physical properties similar to that of our present secondary paving mixes.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

By October 1, 2014, the county engineer of each county shall provide a report to the department of transportation identifying all locations in the county where two different roads or highways having speed limits of 55 miles per hour or greater intersect but are not controlled by an official traffic-control signal or by official traffic-control devices that direct traffic approaching from every direction to stop or yield before entering the intersection. On or before December 31, 2014, the department shall file a report with the legislative services agency detailing the number of locations of the intersections identified in the county engineers’ reports.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Although extensive research has been conducted on urban freeway capacity estimation methods, minimal research has been carried out for rural highway sections, especially sections within work zones. This study attempted to fill that void for rural highways in Kansas, by estimating capacity of rural highway work zones in Kansas. Six work zone locations were selected for data collection and further analysis. An average of six days’ worth of field data was collected, from mid-October 2013 to late November 2013, at each of these work zone sites. Two capacity estimation methods were utilized, including the Maximum Observed 15-minute Flow Rate Method and the Platooning Method divided into 15-minute intervals. The Maximum Observed 15-minute Flow Rate Method provided an average capacity of 1469 passenger cars per hour per lane (pcphpl) with a standard deviation of 141 pcphpl, while the Platooning Method provided a maximum average capacity of 1195 pcphpl and a standard deviation of 28 pcphpl. Based on observed data and analysis carried out in this study, the suggested maximum capacity can be considered as 1500 pcphpl when designing work zones for rural highways in Kansas. This proposed standard value of rural highway work zone capacity could be utilized by engineers and planners so that they can effectively mitigate congestion at or near work zones that would have otherwise occurred due to construction/maintenance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) evaluated the PAS I Road Survey System from PAVEDEX, Inc. of Spokane, Washington. This system uses video photograph to identify and quantify pavement cracking and patching distresses. Comparisons were made to procedures currently used in the State. Interstate highway, county roads and city streets, and two shoulder sections were evaluated. Variables included travel speeds, surface type and texture, and traffic control conditions. Repeatability and distress identification were excellent on rigid pavements. Differences in distress identification and the effect of surface textures in the flexible test sections limited the repeatability and correlation of data to that of the Iowa DOT method. Cost data indicates that PAVEDEX is capable of providing comparable results with improved accuracy at a reasonable cost, but in excess of that experienced currently by the Iowa DOT. PAVEDEX is capable of providing network level pavement condition data at highway speeds and analysis of the data to identify 1/8-inch cracks at approximately 2-3 lane miles per hour with manual evaluation. Photo-logging capability is also included in the unit.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

On July 1, 2005, the State of Iowa implemented a 70 mile per hour (mph) speed limit on most rural Interstates. This document reports on a study of the safety effect of this change. Changes in speeds, traffic volume on and off the rural Interstate system (diversion), and safety (crashes) for on- and off-system roads were studied. After the change, mean and 85th percentile speeds increased by about 2 mph on rural Interstates, but speeding was reduced (the number of drivers exceeding the speed limit by 10 mph decreased from 20 per cent to about 8 per cent). Daytime and nighttime serious crashes were studied for a period of 14 and a half years prior to the change and 2 and a half years afterwards. Simple descriptive statistics reveal increases in all crash severity categories for the 2 and a half year period following the speed limit increase when compared to the most recent comparable 2 and a half year period prior to the increase. When compared to longer term trends, the increases were less pronounced in some severity levels and types, and for a few severity levels the average crash frequencies were observed to decrease. However, fatal and other serious cross-median crashes increased by relatively larger amounts as compared to expected random variation. The study also analyzed crash frequencies grouped into six-month periods, revealing similar findings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The main objective of this research was to evaluate the impact of temporary speed humps and speed tables on vehicle speeds, vehicle speed profiles, and traffic volumes along local and/or collector streets in several rural Iowa cities. A 25 mile per hour (mph) temporary speed hump and a 30 mph temporary speed table, both made of recycled rubber, were purchased to test the impact of temporary devices. Two cities volunteered and the speed hump/table was installed on two test streets in the city of Atlantic (Roosevelt Drive and Redwood Drive) and one test street in the city of Le Claire (Canal Shore Drive). The speed hump was installed first and then converted to a speed table. Each device was installed for a period of at least two weeks at the same location. Speed, volume, and resident opinion data were then collected and evaluated.