Evaluation of Type I Cement Fast Track Concrete, MLR-87-6, 1988
Data(s) |
01/10/1988
|
---|---|
Resumo |
There are projects where opening the pavement to traffic in less than the 5 to 7 days is needed, but an 8 to 12 hour opening time is not necessary. The study examined fast track concrete with Type I cement and admixtures. The variables studied were: (1) cure temperature, (2) cement brand, (3) accelerators, and (4) water reducers. A standard water reducer and curing blankets appear to be effective at producing a 24 hour to 36 hour opening strength. An accelerator and/or high range water reducer may produce opening strength in 12 to 24 hours. Calcium chloride was most effective at achieving high-early strength. |
Formato |
|
Identificador |
http://publications.iowa.gov/17154/1/IADOT_mlr8706_Eval_Type_I_Cement_Fast_Track_Concrete_1988.pdf (1988) Evaluation of Type I Cement Fast Track Concrete, MLR-87-6, 1988. Transportation, Department of |
Idioma(s) |
en |
Relação |
http://publications.iowa.gov/17154/ |
Palavras-Chave | #Transportation #Materials #Roads and highways #Research #Concrete |
Tipo |
Departmental Report NonPeerReviewed |