32 resultados para Proper
Resumo:
Nationwide, about five cents of each highway construction dollar is spent on culverts. In Iowa, average annual construction costs on the interstate, primary, and federal-aid secondary systems are about $120,000,000. Assuming the national figure applies to Iowa, about $6,000,000 are spent on culvert construction annually. For each one percent reduction in overall culvert costs, annual construction costs would be reduced by $60,000. One area of potential cost reduction lies in the sizing of the culvert. Determining the flow area and hydraulic capacity is accomplished in the initial design of the culvert. The normal design sequence is accomplished in two parts. The hydrologic portion consists of the determination of a design discharge in cubic feet per second using one of several available methods. This discharge is then used directly in the hydraulic portion of the design to determine the proper type, size, and shape of culvert to be used, based on various site and design restrictions. More refined hydrologic analyses, including rainfall-runoff analysis, flood hydrograph development, and streamflow routing techniques, are not pursued in the existing design procedure used by most county and state highway engineers.
Resumo:
A fire can engulf a structure in a matter of minutes. Understanding the basic characteristics of fire and learning the proper safety practices can be the key to surviving a house or building fire.
Resumo:
As our nation’s highway system continues to age, asphalt maintenance and rehabilitation techniques have become increasingly important. The deterioration of pavement over time is inevitable. Preventive maintenance is a strategy to extend the serviceable life of a pavement by applying cost-effective treatments that slow the deterioration of pavement and extend its usable life. Thin maintenance surfaces (TMSs) are preventive maintenance techniques that can effectively prolong the life of pavement when applied at an opportune time. Common TMSs include bituminous fog seal, bituminous seal coat, slurry seal, cold in-place recycling (CIR), and micro-surfacing. This research project investigated ways to improve Iowa Statewide Urban Design and Specifications (SUDAS) and Iowa Department of Transportation (DOT) documents regarding asphalt roadway maintenance and rehabilitation. Researchers led an effort to review and help ensure that the documents supporting proper selection, design, and construction for asphalt maintenance and rehabilitation techniques reflect the latest research findings on these processes: seal coating, slurry sealing, micro-surfacing, and fog sealing. Full results of this investigation are included in this report and its appendices. This report also presents a summary of the recommendations based on the study results.
Resumo:
The average Iowa family spends more than half of its annual household energy bill on heating and cooling. That’s a significant number, but you can dramatically reduce these costs—up to 20 percent, according to ENERGY STAR®—by making some simple energy-saving weatherization and insulation improvements to your home. In addition—with a little attention to proper ventilation—you can protect your home from moisture damage year-round, reduce problems caused by ice dams on the roof during the winter and significantly cut summer cooling costs. As a bonus, these projects can extend the life of your home and may increase the resale value of your property. If you like to fix things around the house, you can handle many of the projects suggested in this book and make the most of your energy-improvement budget. However, don’t hesitate to call a professional for help if you’d rather not do the work yourself; the dollars gained through energy savings in upcoming years will be worth the expense.
Resumo:
General principles • Everyone at the construction site, particularly foremen and supervisors, is responsible for recognizing and troubleshooting potential problems as they arise. • Batches of concrete should be consistent and uniformly mixed. • A major cause of pavement failure is unstable subgrade. The subgrade should consist of uniform material, and the subgrade system must drain well. • Dowel bars are important for load transfer at transverse joints on pavements with high truck volumes. Dowels must be carefully aligned, horizontally and vertically, to prevent pavement damage at the joints. • Stringlines control the slipform paver’s horizontal and vertical movement and ensure a smooth pavement profile. Once stringlines are set, they should be checked often and not disturbed. • Overfinishing the new pavement and/or adding water to the surface can lead to pavement surface problems. If the concrete isn’t sufficiently workable, crews should contact the project manager. Changes to the mixture or to paver equipment may reduce the problem. • Proper curing is critical to preventing pavement damage from rapid moisture loss at the pavement surface. • A well spaced and constructed system of joints is critical to prevent random cracking. • Joints are simply controlled cracks. They must be sawed during the brief time after the pavement has gained enough strength to prevent raveling but before it begins to crack randomly (the “sawing window”). • Seasonal and daily weather variations affect setting time and other variables in new concrete. Construction operations should be adjusted appropriately.
Resumo:
What we do: Since 1892, the Iowa Geological and Water Survey (IGWS) has provided earth, water, and mapping science to all Iowans. We collect and interpret information on subsurface geologic conditions, groundwater and surface water quantity and quality, and the natural and built features of our landscape. This information is critical for: Predicting the future availability of economic water supplies and mineral resources. Assuring proper function of waste disposal facilities. Delineation of geologic hazards that may jeopardize property and public safety. Assessing trends and providing protection of water quality and soil resources. Applied technical assistance for economic development and environmental stewardship. Our goal: Providing the tools for good decision making to assure the long-term vitality of Iowa’s communities, businesses, and quality of life. Information and technical assistance are provided through web-based databases, comprehensive Geographic Information System (GIS) tools, predictive groundwater models, and watershed assessments and improvement grants. The key service we provide is direct assistance from our technical staff, working with Iowans to overcome real-world challenges. This report describes the basic functions of IGWS program areas and highlights major activities and accomplishments during calendar year 2011. More information on IGWS is available at http://www.igsb.uiowa.edu/.
Resumo:
Approximately 65% of Iowa's roads are surfaced with aggregates composed of crushed limestone and/or gravel. Rural Iowan's regard these roads as a very important part of their lives. Therefore, the slide-tape presentation, "Maintaining Granular Surfaced Roads" was developed to aid the motor grader operator to better understand the procedures required t o maintain aggregate surfaced roads. A typical cross-section is presented with the proper nomenclature assigned to the roadway features to facilitate the operator's understanding of the basic terms used the program. The following areas are expanded: safety , dragging, cutting, intersections , superelevations, and reporting any discrepancies. The operator's attention to detail can enhance the economy of the state and contribute to the savings of lives on rural highways.
Resumo:
Transportation agencies in Iowa are responsible for a significant public investment with the installation and maintenance of traffic control devices and pavement markings. Included in this investment are thousands of signs and other inventory items, equipment, facilities, and staff. The proper application of traffic control devices and pavement markings is critical to public safety on streets and highways, and local governments have a prescribed responsibility under the Code of Iowa to properly manage these assets. This research report addresses current traffic control and pavement marking application, maintenance, and management in Iowa.
Resumo:
Timber material repair and replacement cost for timber bridges is a considerable expense to highway agencies in Iowa, especially to county road departments. To address these needs, the objectives of this investigation was to study the field effectiveness of various treatment alternatives used on Iowa roadway projects and to determine if the current specifications and testing are adequate for providing proper wood preservation. To satisfy the research needs, the project scope involved a literature review, identification of metrics, questionnaire survey of Iowa counties, onsite inspections, and a review of current specifications and testing procedures. Based on the preservative information obtained, the following general conclusions were made: Copper naphthenate is recommended as the plant-applied preservative treatment for timber bridges. Best Management Practices should be followed to ensure quality treatment of timber materials. Bridge maintenance programs need to be developed and implemented. The Iowa Department of Transportation specifications for preservative treatment are the regulating specification for bridges constructed with state or federal funding in Iowa and are also recommended for all other bridges.
Resumo:
This research project strives to help the Iowa Department of Transportation (DOT) fully achieve the full benefits of pavement preservation through training on proper selection, design, and application of pavement preservation treatments. In some cases, there is a lack of training when conducting one of these steps and the objective of applying pavement preservation techniques is compromised. Extensive amounts of literature on pavement preservation exist, but a structured approach on how to train staff in selecting, designing, and applying pavement preservation techniques is lacking. The objective of this project was to develop a training-oriented learning management system to address pavement preservation treatments (chip seals, fog seals, slurry systems, and crack seals and fills) as they are dealt with during the phases of selection, design, and construction. Early in the project, it was critical to identify the staff divisions to be trained and the treatments to be included. Through several meetings with the Iowa DOT, three staff divisions were identified: maintenance staff (in charge of selection), design staff, and construction staff. In addition, the treatments listed above were identified as the focus of the study due to their common use. Through needs analysis questionnaires and meetings, the knowledge gap and training needs of the agency were identified. The training modules developed target the gap from the results of the needs analysis. The concepting (selection) training focuses on providing the tools necessary to help make proper treatment selection. The design training focuses on providing the information necessary on the treatment materials (mostly binders and aggregates) and how to make proper material selection. Finally, the construction training focuses on providing equipment calibration procedures, inspection responsibilities, and images of poor and best practices. The research showed that it is important to train each division staff (maintenance, design, and construction) separately, as each staff division has its own needs and interests. It was also preferred that each treatment was covered on an individual basis. As a result of the research, it is recommended to evaluate the performance of pavement preservation treatments pre- and post-training continuously to compare results and verify the effectiveness of the learning management system.
Resumo:
Weathering steel is commonly used as a cost-effective alternative for bridge superstructures, as the costs and environmental impacts associated with the maintenance/replacement of paint coatings are theoretically eliminated. The performance of weathering steel depends on the proper formation of a surface patina, which consists of a dense layer of corrosion product used to protect the steel from further atmospheric corrosion. The development of the weathering steel patina may be hindered by environmental factors such as humid environments, wetting/drying cycles, sheltering, exposure to de-icing chlorides, and design details that permit water to pond on steel surfaces. Weathering steel bridges constructed over or adjacent to other roadways could be subjected to sufficient salt spray that would impede the development of an adequate patina. Addressing areas of corrosion on a weathering steel bridge superstructure where a protective patina has not formed is often costly and negates the anticipated cost savings for this type of steel superstructure. Early detection of weathering steel corrosion is important to extending the service life of the bridge structure; however, written inspection procedures are not available for inspectors to evaluate the performance or quality of the patina. This project focused on the evaluation of weathering steel bridge structures, including possible methods to assess the quality of the weathering steel patina and to properly maintain the quality of the patina. The objectives of this project are summarized as follows: Identify weathering steel bridge structures that would be most vulnerable to chloride contamination, based on location, exposure, environment, and other factors. Identify locations on an individual weathering steel bridge structure that would be most susceptible to chloride contamination, such as below joints, splash/spray zones, and areas of ponding water or debris. Identify possible testing methods and/or inspection techniques for inspectors to evaluate the quality of the weathering steel patina at locations discussed above. Identify possible methods to measure and evaluate the level of chloride contamination at the locations discussed above. Evaluate the effectiveness of water washing on removing chlorides from the weathering steel patina. Develop a general prioritization for the washing of bridge structures based on the structure’s location, environment, inspection observations, patina evaluation findings, and chloride test results.
Resumo:
The Capitol grounds have been evolving through planned and unplanned actions for more than 150 years. The 1857 Constitutio established Des Moines as the capital. The commissioners appointed to choose a site decided on land donated by Wilson Alexander Scott and Harrison Lyon. Located on the east side of the Des Moines River, on a gently rising hill, the site for the Iowa State Capitol began with fewer than 10 acres. The Old Brick Capitol was built in the center of that 10-acre plot, and the area to the north was used as a public park until work began on the present day Capitol. In 1884, the two-year process of moving from the Old Brick Capitol to the new Capitol began. The state commissioned John Weidenman to design the first formal decoration of the grounds. Weidenman’s plans for the west approach to the Capitol included planting statues, and walkways. The State held some additional land but not necessarily land adjacent to the Capitol. In 1909, legislation was passed, and in 1913, the Thirty-Fifth General Assembly enacted controversial legislation to acquire additional land. A commission was formed to locate a purposed monument honoring the long-serving U.S. Senator William B. Allison. E.L. Masqueray was hired as the architect expert focusing on the selection of a proper site for the proposed Allison Memorial. Masqueray’s plan detailed the placement of buildings and potential monuments. Growth of the Capitol Complex, as known today, began.
Resumo:
The average thickness of the existing asphalt cement concrete (ACC) along route E66 in Tama County was 156 mm (6.13 in.). The rehabilitation strategy called for widening the base using the top 75 mm (3 in.) of the existing ACC by a recycling process involving cold milling and mixing with additional emulsion/rejuvenator. The material was then placed into a widening trench and compacted to match the level of the milled surface. The project had the following results: (1) Cold recycled ACC pavement provided adequate pavement structure for a low volume road; (2) Premature cracking of the ACC in the widened pavement area was caused by compaction of the mix over a saturated subgrade; and (3) Considerably less transverse and longitudinal cracking was observed with 75 mm (3 in.) of cold recycled ACC and a 50 mm (2 in.) hot mix ACC overlay than with a conventional hot mix overlay with no cold recycling. More research should be done on efficient construction procedures and incorporating longer test sections for proper evaluation.
Resumo:
This research consisted of five laboratory experiments designed to address the following two objectives in an integrated analysis: (1) To discriminate between the symbol Stop Ahead warning sign and a small set of other signs (which included the word-legend Stop Ahead sign); and (2) To analyze sign detection, recognizability, and processing characteristics by drivers. A set of 16 signs was used in each of three experiments. A tachistoscope was used to display each sign image to a respondent for a brief interval in a controlled viewing experiment. The first experiment was designed to test detection of a sign in the driver's visual field; the second experiment was designed to test the driver's ability to recognize a given sign in the visual field; and the third experiment was designed to test the speed and accuracy of a driver's response to each sign as a command to perform a driving action. A fourth experiment tested the meanings drivers associated with an eight-sign subset of the 16 signs used in the first three experiments. A fifth experiment required all persons to select which (if any) signs they considered to be appropriate for use on two scale model county road intersections. The conclusions are that word-legend Stop Ahead signs are more effective driver communication devices than symbol stop-ahead signs; that it is helpful to drivers to have a word plate supplementing the symbol sign if a symbol sign is used; and that the guidance in the Manual on Uniform Traffic Control Devices on the placement of advance warning signs should not supplant engineering judgment in providing proper sign communication at an intersection.
Resumo:
The Iowa demonstration project to promote the rehabilitation of bridge deck concrete by rebonding delaminations with injected epoxy is a 150 ft x 150 ft high truss bridge on Iowa route No. 210 over Indian Creek near Maxwell in Story County (Service level D, AADT-730, Inventory Rating HS-16.9, Operating Rating HS-25). The objective of this study was to evaluate the effectiveness of repairing a delaminated bridge deck by epoxy injection, specifically a bridge deck with a delaminated portland cement concrete overlay. Observations noted during the project lead to the following conclusions: The delaminations rebonded with epoxy have remained solid through five years. The percentage of delamination has stayed essentially the same for both the epoxy injected and non-repaired areas. Epoxy injection appears to be a practical, cost effective alternative to other forms of deck rehabilitation when undertaken at the proper time. Cost effectiveness would reduce dramatically if delayed until breakouts have occurred. On the other hand it would be a slow, labor intensive process if undertaken too early when delaminations are small.