31 resultados para Economics, Finance|Transportation
Resumo:
This Task A Report summarizes the initial activities of the U.S. 20 Corridor Development Study. Task A constitutes a review of the portion of existing U.S. 20 from the Nebraska state line on the south side of Sioux City to the junction with U.S. 169 south of Ft. Dodge. · Preliminary study findings for this 119 mile corridor are summarized below.
Resumo:
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility
Resumo:
This study examines the feasibility of making a major financial investment in the improvement of U.S. 20 between Sioux City and Fort Dodge, Iowa. This 119-mile (191-km) highway segment of U.S. 20 currently includes 97 miles (156 km) of 2-lane highway and 22 miles (35 km) of 4-lane highway (on the west end near Sioux City and a short section near Holstein). This 119-mile (191-km) segment is predominantly rural in nature, and serves a region of Iowa that has not been economically prospering. Local business leaders and residents have long desired major improvements to this highway segment, not only because of the safety and travel efficiency implications, but also because of the belief that the highway, as mainly a two-lane facility, is retarding the corridor area's economic growth and well being. The study was divided into five sequential tasks: (A) Evaluation of Existing U.S. 20; (B) Improvement Alternatives, Costs and Traffic; (C) Screening of Alternative Candidate Improvements; (D) Economic Feasibility Analysis; and (E) Interpretation and Comparisons.
Resumo:
The results of a study which evaluates the Iowa Motor Vehicle Fuel Reduction Program have been summarized and described in this report. The Iowa Motor Vehicle Fuel Reduction Program was designed to demonstrate fuel savings through traffic signal modernization projects and provide direct benefits to motorists in Iowa.
Resumo:
On August 12, 1986, a public hearing was held in the Henry A. Wallace Building Auditorium, 900 East Grand Avenue, Des Moines, Iowa, for the purpose of receiving comments and statements from individuals, groups, and associations that have an interest in the limits of financial responsibility for intrastate passenger motor carriers.
Resumo:
This report was prepared for the Iowa Department of Transportation to document the results of a comprehensive study of the US 61 bypass corridor in Muscatine, Iowa. The focus of the study was to address community concerns regarding traffic safety and traffic operations. In completing the study, accident and traffic volume data was collected and analyzed. Input from the public and elected officials of the Muscatine community was also obtained. The goals of the project were to: Accurately identify the nature of the types of problems and the locations where the problems were occurring; Formulate a range of possible remedial measures; Analyze and test those proposed measures; Inform the community of the nature of the traffic problems and of the proposed remedies; Seek feedback from the community on those proposed remedies; Develop a comprehensive list of recommended improvements; Develop cost estimates and assign priorities to those possible improvements. An additional goal of this project was to identify possible Intelligent Transportation System (ITS) measures that could be used to address the safety and operations problems that have developed along this corridor. The proposed ITS measures were also to be analyzed to determine their likely benefits and their likely success if used at other locations elsewhere in Iowa.
Resumo:
An overview of the first 50 years of the Iowa State Highway Commission.
Resumo:
A list of proposed or added project to the 1999 Highway Accomplishment Program
Resumo:
An brief history of the developments in the Iowa highway administration between 1838 and 1929.
Resumo:
A brief history of Iowa highways.
Resumo:
A brief overview of Iowa's road bonds.
Resumo:
The purpose of this report is to compile and update the prior studies in order to select viable alternatives for inclusion in the Environmental Assessment to be prepared for this project.
Resumo:
The 2015 Corridor Management Plan for the Iowa Great River Road is modeled after similar plans for other National Scenic Byways: it is a dynamic, written document that describes the broad range of goals, objectives, policies, programs, projects and activities which can assist with protecting the intrinsic resources of a byway; interpreting the engaging stories of the byway; and promoting and presenting the byway with services and amenities to meet the needs and expectations of the traveling public.
Resumo:
The Iowa Department of Transportation spent $499,480 of the FY 2015 RUTF/PRF budget reversion in FY 2016 for desktop consumables, information technology professional services, training and computer equipment.
Resumo:
Senate File 2355, 85th General Assembly, states the Iowa Department of Transportation shall submit annual reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.