40 resultados para Capacity expansion planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

For the 2004 strategic planning process at Iowa Workforce Development, Director Richard Running asked for as much input from all staff as possible. As a result, planning staff designed an extensive process to gather input over about a three month period during the late spring and summer: • A Guide to Staff Involvement was drafted and distributed to staff in offices throughout the state. This guide provided a brief explanation of the planning process and quoted extensively from the Vilsack/Pederson Leadership Agenda and the 2003 IWD strategic plan to illustrate each step and to show examples of alignment. The guide also provided suggestions for staff in various locations and work units to conduct their own planning sessions. The structure was designed to solicit feedback regarding elements (vision, mission, guiding principles, goals and strategies) of the existing 2003 plan. Particular attention was devoted to securing non-management staff’s perspective during the internal and external assessment exercises. • Several local offices did conduct their own structured input sessions following the suggested guidelines and sent the results to planning staff in the central administrative offices. • Other work units in many locations opted to ask planning staff to facilitate planning sessions for them. The results of these sessions were also gathered by planning staff. In all, dozens of input sessions were held and hundreds of IWD staff participated directly in the process. Because all the sessions followed similar guidelines, it was relatively easy to combine all of the input received and spot common themes that surfaced from the many sessions. A composite of all the flip chart notes was compiled into one large document (for those who like lots of detail) and another document summarized the key themes that emerged. This information was used in a day-long planning retreat on August 20. Management staff members from throughout the department were invited and each work unit and sub-state region also brought a non-management staff person as well. This group reviewed the themes from the earlier sessions and then addressed each element of the 2003 plan, proposing refinements for almost all sections. Subsequently, senior management reviewed the results of the retreat and made the final decisions for the new 2004 plan. This thorough approach, with its special emphasis on input from line staff, did result in some significant changes to IWD’s plan. Local office staff, for example, consistently expressed the need to step up our marketing efforts, especially with employers. Another need that was expressed clearly and often was the need to beef up staff training efforts, much of the capacity for which had been lost in budget and staff reductions a few years ago. Neither of these issues is new, but the degree of concern expressed by IWD staff has caused us to elevate their importance in this year’s plan.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PM2002B: People own wooded acreages and woodlands for a variety of reasons that may include: timber production, firewood production, recreation, wildlife habitat, aesthetics, and alternative forest products. Most of Iowa’s forestland is privately held, and the majority of ownership is fragmented into an average of ten acres (Forest Reserve Survey, 2004). In fact, the average size of an individual forest or woodlot ownership has been steadily declining for several years due in part to population growth, urban sprawl, and changes in land ownership. Studies indicate that the probability of a sustainable woodlot decreases as the population increases. At the same time, most woodlot owners want to be good stewards and protect and enhance the forest that they own. To achieve this goal, careful forest planning and management is required especially when managing the land for multiple objectives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We assess the international competitiveness of the dairy industries in Argentina and Chile, combining recent market intelligence gathered from field visits with quantitative simulations of global policy reform scenarios. Both countries exhibit strong potential for export growth but face significant internal and external barriers to expanding their dairy industries. Global policy reforms would resolve some of the international obstacles to their expansion. Argentina has great potential, but it is handicapped by its current macroeconomic policies, trade policy distortions, and the uncertainty associated with policy implementation. Chile is more limited in terms of natural capacity for expansion, but it has a positive trade and investment environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the annual report of the State Planning Commission. It tells about the program that the state has finished work on and is still working on. Plus plans for progress of the capital areas and surrounding buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Legislative Council established the Continuity of Government Planning Interim Study Committee in 2006 and authorized the Committee to meet during the 2006 Legislative Interim. The Committee was given the following charge: Examine issues relating to the continued functioning of state government following a disaster, including gubernatorial succession, replacement of constitutional officers and department heads, legislative elections to fill vacancies, and continued funding of state government if the General Assembly is unable to meet and pass a budget.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Administrative Services - Human Resources Enterprise (DAS-HRE) has developed a variety of tools and resources to address those concerns. Loss of institutional knowledge, or knowledge transfer as it is more frequently referred to, is one of the main topics of the Workforce Planning Guide. Potential difficulties finding new workers was one of the major reasons for adding a chapter on recruitment in the Applicant Screening Manual.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information on the Promising Transition Practices shared at the September 28, 2007 Capacity Building Forum sponsored by Improving Transition Outcomes with Iowa Vocational Rehabilitation Services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Special investigation of the Area XV Regional Planning Commission located in Ottumwa, Iowa for the period July 1, 2000 through June 30, 2006

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state's transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. Iowa's transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2009-2013 highway section is financially balanced and was developed to achieve several objectives. The Commission's primary highway investment objective is the safety, maintenance and preservation of Iowa's existing highway system. The Commission has allocated an annual average of $321 million to achieve this objective. This includes $185 million in 2009 and $170 million annually in years 2010-2013 for preserving the interstate system. It includes $114 million in 2009, $100 million in 2010 and $90 million annually in years 2011-2013 for non-interstate pavement preservation. It includes $38 million annually in 2009 and 2010, and $35 million annually in years 2011-2013 for non-interstate bridges. In addition, $15 million annually is allocated for safety projects. However, due to increasing construction costs, flattened revenues and overall highway systems needs, the Commission acknowledges that insufficient funds are being invested in the maintenance and preservation of the existing highway system. Another objective involves investing in projects that have received funding from the federal transportation act and/or subsequent federal transportation appropriation acts. In particular, funding is being used where it will complete a project, corridor or useable segment of a larger project. As an investment goal, the Commission also wishes to advance highway projects that address the state's highway capacity and economic development needs. Projects that address these needs and were included for completion in the previous program have been advanced into this year's Program to maintain their scheduled completion. This program also includes a small number of other projects that generally either represent a final phase of a partially programmed project or an additional segment of a partially completed corridor. The TIME-21 bill, Senate File 2420, signed by Governor Chet Culver on April 22, provides additional funding to cities, counties and the Iowa DOT for road improvements. This will result in additional revenue to the Primary Road Fund beginning in the second half of FY2009 and gradually increase over time. The additional funding will be included in future highway programming objectives and proposals and is not reflected in this highway program. The Iowa DOT and Commission appreciate the public's involvement in the state's transportation planning process. Comments received personally, by letter, or through participation in the Commission's regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa's transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT's Web site at iowadot.gov for additional and regular updates about the department's programs and activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agency Performance Plan, Division of Criminal and Juvenile Justice Planning, Department of Human Rights

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report outlines the strategic plan for Iowa Division of Criminal and Juvenile Justice Planning including,goals and mission.