231 resultados para Highway Infrastructure


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes the highway construction program, actual expenditures of the program and contractual obligations of the program for FY 2015.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the Iowa Department of Transportation's summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report, entitled Iowa Highway Research and Development Activities FY 2015, is submitted in compliance with Iowa Code section 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 30, 2015. It is also a report on projects completed during the fiscal year beginning July 1, 2014 and ending June 30, 2015. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This final report summarizes the activities of the archaeological surveys contract for primary roads, secondary roads, and urban systems. The contract is negotiated annually between the Iowa Department of Transportation and the University of Iowa. The information contained in this section of the report is composed of summaries abstracted from completed cultural resource reports on file with the Department of Transportation, the Office of Historic Preservation, and the Office of the State Archaeologist.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Engineering Research Institute at Iowa State University studied the organization and procedures for highway planning by all levels of government and the coordination among various state agencies and local governments in Iowa. Study information was derived from interviews, questionnaires, and a review of the literature. Representatives from state transportation or highway organizations in all states responded to questionnaires. Additionally, selected upper and intermediate level personnel from highway organizations in seven other states were interviewed and a visit was made to one state transportation department. Within Iowa, employees were interviewed in the Highway Commission, Office for Planning and Programming, Development Commission, Commerce Commission, Conservation Commission, and Highway Patrol. Nearly 600 officials of local governments in Iowa contributed factual data and opinions through questionnaires and interviews. Private citizens and consultants also provided input to the investigation through their responses to questionnaires. Twelve recommendations to improve highway planning in Iowa were formulated as a result of this study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 190 and Iowa Highway Research Board - Bulletin No. 19. This bulletin is a report on the development of bituminous paving mixtures containing various local materials and asphaltic binders. The laboratory investigations described in this bulletin were performed as part of Iowa Highway Research Board project HR-20, "Treating Loess, Fine Sands, and Limestone Dusts With Liquid Binders." This project was awarded to the Iowa Engineering Experiment Station of Iowa State University in 1952, and continued to June, 1958.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Joint Publications from Iowa Engineering Experiment Station - Bulletin No. 188 and Iowa Highway Research Board - Bulletin No. 17. In the design of highway bridges, the 'static live load is multiplied by a factor to compensate for the dynamic effect of moving vehicles. This factor, commonly referred to as an impact factor, is intended to provide for the dynamic response of the bridge to moving loads and suddenly applied forces. Many investigators have published research which contradicts the current impact formula 1,4,17. Some investigators feel that the problem of impact deals not only with the increase in over-all static live load but that it is an integral part of a dynamic load distribution problem. The current expanded highway program with the large number of bridge structures required emphasizes the need for investigating some of the dynamic behavior problems which have been generally ignored by highway engineers. These problems generally result from the inability of a designer to predict the dynamic response of a bridge structure. Many different investigations have been made of particular portions of the overall dynamic problem. The results of these varied investigations are inevitably followed by a number of unanswered questions. Ironically, many of the unanswered questions are those which are of immediate concern in the design of highway bridges, and this emphasizes the need for additional research on the problem of impact.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pinconnected high-truss single-lane bridge, was selected for a testing program which included ultimate load tests. The purpose of the ultimate load tests, which are summarized in this report, was to relate design and rating procedures presently used in bridge design to the field behavior of this type of truss bridge. The ultimate load tests consisted of ultimate load testing of one span of the bridge, of two I-shaped floorbeams, and of two panels of the timber deck. The theoretical capacity of each of these components is compared with the results from the field tests.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The state Departments of Transportation (DOTs) of Iowa, Michigan, and Minnesota formed a consortium to define and develop the next generation highway maintenance vehicle. The Center for Transportation Research and Education of Iowa State University provided staff support to the concept highway maintenance vehicle project, which focused on winter maintenance activities. Phase I of the three-phase project focused on describing the desirable functions of a concept maintenance vehicle. Phase II will include the development, operation, and evaluation of prototype winter maintenance vehicles. Phase III is envisioned to be a comprehensive fleet evaluation of prototype winter maintenance vehicles. This report covers the activities of Phase I. Phase I included conducting a literature review of materials related to winter highway maintenance activities, identifying ideal capabilities of a winter maintenance vehicle, inviting private sector equipment and technology providers to join the project and commit equipment and expertise for Phase II, and determining the specific equipment and technology to be included on the three prototype vehicles for the winter of 1996-1997. Phase I concluded by establishing that assembling the three prototype vehicles would be beneficial to the project and to the three state DOTs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In anticipation of regulation involving numeric turbidity limit at highway construction sites, research was done into the most appropriate, affordable methods for surface water monitoring. Measuring sediment concentration in streams may be conducted a number of ways. As part of a project funded by the Iowa Department of Transportation, several testing methods were explored to determine the most affordable, appropriate methods for data collection both in the field and in the lab. The primary purpose of the research was to determine the exchangeability of the acrylic transparency tube for water clarity analysis as compared to the turbidimeter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The major objective of this project is to evaluate image analysis for characterizing air voids in Portland cement contract (PCC) and asphalt concrete (AC) and aggregate gradation in asphalt concrete. Phase 1 of this project has concentrated on evaluation and refinement of sample preparation techniques, evaluation of methods and instruments for conducting image analysis, and finally, analysis and comparison of a select portion of samples. Preliminary results suggest a strong correlation between the results obtained from the linear traverse method and image analysis methods for determining percent air voids in concrete. Preliminary work with asphalt samples has shown that damage caused by a high vacuum of the conventional scanning electron microscope (SEM) may too disruptive. Alternative solutions have been explored, including confocal microscopy and low vacuum electron microscopy. Additionally, a conventional high vacuum SEM operating at a marginal operating vacuum may suffice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Provision of left turn lanes is a major problem which lacks an objective approach. Various techniques and procedures in use have been reviewed. Traffic characteristics at typical Iowa intersections have been measured. A rational approach for inclusion of a left turn lane has been developed, based on relating the benefits to the road user to the cost of providing the added turing lane. An analysis of field data gathered under this project indicates that the use of theoretical distribution to describe vehicle headways is not applicable to rural Iowa two lane roads. As an alternate approach the mass of field data gathered were examined using multiple regression techniques to yield equations for predicting stops and delays. The benefit-cost ratio technique is recommended as the criterion for decision making.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A contract for Project HR-20 "Treating Loess, Fine Sands and Soft Limestones with Liquid Binders" of the Iowa Highway Research Board was awarded in December, 1951, to the Iowa Engineering Experiment Station of Iowa State University as its Project 295-S. By 1954 the studies of the fine materials and asphalts had progressed quite well, and a method of treating the fine materials, called the atomization process, had been applied. A study was begun in 1954 to see if some of the problems of the atomization process could be solved with the use of foamed asphalt. Foamed asphalt has several advantages. The foaming of asphalt increases its volume, reduces its viscosity, and alters its surface tension so that it will adhere tenaciously to solids. Foamed asphalt displaces moisture from the surface of a solid and coats it with a thin film. Foamed asphalt can permeate deeply into damp soils. In the past these unusual characteristics were considered nuisances to be avoided if possible.