249 resultados para Highway
Resumo:
(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1951, a total of 68,869 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2676 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads ----------------- $24,000,000 For secondary roads---------------- $41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) Unobligated available farm to market road funds are rapidly being placed under contract. (i) The letting of highway contracts is increasing rapidly. (j)- Iowa's highway program is estimated to cost $945,000,000 and will require twenty years to build. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.
Resumo:
(a) Iowa has a total of 101,620 miles of rural roads, both primary and secondary. (b) On January 1, 1952, a total of 71,493 miles of these rural roads were surfaced - mostly with gravel and crushed stone. (c) Additional roads are being surfaced at the rate of 2662 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 26.0 per cent from property taxes, 63.5 per cent from road use taxes, 10.5 per cent from Federal aid. (f) Annual income under present laws, available for highway construction, is approximately For primary roads------------------$23,000,000 For secondary roads---------------- 41,967,000 (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued. (h) The surplus of farm to market road funds created during and immediately following the War have now been placed under contract, with only a minimum working balance remaining in the fund. (i) Iowa's highway program was estimated to cost $945,000,000 and to require twenty years to build, by the 1948 Legislative Committee. This estimate would now have to be increased due to price increases and higher required standards. These are the highlights of Iowa's highway program. The details will follow in succeeding paragraphs.
Resumo:
(a) Iowa has a total of 101,451 miles of rural roads, both primary and secondary. (b) On January 1, l954, a total of 77,024 miles of these rural roads were surfaced - mostly with gravel and crushed stone. This is 5,53l miles greater than on January l, 1952. (c) Additional roads are being surfaced at the rate of 2766 miles per year. (d) Iowa's highway program provides for a surfaced road to every reasonably located rural home and a paved or other type of dustless surface on all primary roads. (e) Iowa's highway funds come 25.4 per cent from property taxes and special taxes......................................$29,708,546.67 63.7 per cent from road use taxes.......... 74,581,080.30 10.6 per cent from Federal Aid (1952 Act).. 12,424,000.00 0.3 per cent from miscellaneous receipts.. 287,922.86 ---- ------------- 100.0 $117,001,549.83 (f) Annual income under present laws, available for highway construction, is approximately, For primary roads $29,420,000.00 For secondary roads $44,328,000.00 In 19_3, $7,299,000 of secondary road construction funds was transferred to the maintenance fund. (g) Iowa's highway improvements are being paid for as built. No new bonds are being issued.
Resumo:
During the fiscal year, July 1, 1950 to June 30, 1951, the Iowa State Highway Commission expanded its research program by adding to the work under way during the previous fiscal year, fifteen substantial projects recommended to the Commission by the Iowa Highway Research Board. The major portion of the projects under way in the previous fiscal year have been active in this fiscal year. All of the additional projects have gotten under way during this fiscal year. This year, as in the past, the work has been performed partly by Commission forces and partly by outside agencies such as the Institute of Hydraulic Research at Iowa City, the State University of Iowa, Iowa State College, the Iowa Geological Survey and the United States Geological Survey. The major portion of the fifteen new projects has been assigned to these outside agencies.
Resumo:
This demonstration project consisted of three adjacent highway resurfacing projects using asphalt cement concrete removed from an Interstate highway which had become severely rutted.
Resumo:
This report addresses delays to freight shippers. Although the focus is on just-in-time (JIT) businesses, the authors also note that non JIT businesses also suffer delays that impact their productivity. The table of contents lists the following headings: chapter 1 - introduction - a trial application: the Des Moines metropolitan area; structure of the report; chapter 2 - reliability at the forefront of freight transport demand - manufacturing and inventory; just-in-time operations in the U.S.; transportation consequences; summary; chapter 3 - JIT operations in Iowa - survey and sample; trucking activity and service; just-in-time truck transportation in Iowa; assessment of factors affecting truck transportation service; summary and conclusions; chapter 4 - travel time uncertainty induced by incidents - a probabilistic model for incident occurrences and durations; calculation of delay; trial application; conclusions; and chapter 5 - conclusions and recommendations - conclusions; recommendations.
Resumo:
The purpose of the research was to develop a more realistic design criteria for distribution of wheel loads on highway bridges. A comprehensive study was made of the· static load distribution in a broad range of short and medium span bridge types used by today's designers.
Resumo:
This Task A Report summarizes the initial activities of the U.S. 20 Corridor Development Study. Task A constitutes a review of the portion of existing U.S. 20 from the Nebraska state line on the south side of Sioux City to the junction with U.S. 169 south of Ft. Dodge. · Preliminary study findings for this 119 mile corridor are summarized below.
Resumo:
In February the U.S. 20 Corridor Development Study's Steering Committee met to review Report A. At that meeting the Committee selected seven alternatives to be evaluated from a cost and traffic perspective. This report, Report B, presents the cost and traffic evaluation of these seven alternatives. This Report B and its cost and traffic estimates will be reviewed at the next Steering Committee meeting. At that time it is possible that, based on the traffic and cost estimates, one or more of the alternatives will be eliminated from further consideration. After that meeting the Consultant will initiate the more in-depth analyses, including the economic feasibility
Resumo:
This study examines the feasibility of making a major financial investment in the improvement of U.S. 20 between Sioux City and Fort Dodge, Iowa. This 119-mile (191-km) highway segment of U.S. 20 currently includes 97 miles (156 km) of 2-lane highway and 22 miles (35 km) of 4-lane highway (on the west end near Sioux City and a short section near Holstein). This 119-mile (191-km) segment is predominantly rural in nature, and serves a region of Iowa that has not been economically prospering. Local business leaders and residents have long desired major improvements to this highway segment, not only because of the safety and travel efficiency implications, but also because of the belief that the highway, as mainly a two-lane facility, is retarding the corridor area's economic growth and well being. The study was divided into five sequential tasks: (A) Evaluation of Existing U.S. 20; (B) Improvement Alternatives, Costs and Traffic; (C) Screening of Alternative Candidate Improvements; (D) Economic Feasibility Analysis; and (E) Interpretation and Comparisons.
Resumo:
The proposed Davenport to Lacrosse route corridor includes the Iowa counties of Scott, Clinton, Jackson, and Dubuque. In addition, an influence region has been defined which includes six additional counties. The region is predominantly agricultural, however, following the national trend, movement away from the small farm to large mechanized operations has created an adequate labor force for the two major industrial cities of Davenport and Dubuque. From a total 1971 regional work force of 186,990, only 23,190, or slightly over 12% were engaged in agriculture, 91% of the land area being agricultural notwithstanding. It is forecasted that the urban population of the two counties containing the above cities will increase by 26% between 1970 and 1990, while the population of the remaining region counties can expect only a 3% increase.
Resumo:
The Data Processing Department of ISHC has developed coding forms to be used for the data to be entered into the program. The Highway Planning and Programming and the Design Departments are responsible for coding and submitting the necessary data forms to Data Processing for the noise prediction on the highway sections.
Resumo:
This report serves as a record of the Assessment activities, which consisted of a review of local, county, state, and federal records, interviews, and site reconnaissance. Sections 2 through 4 of this report document information gathered. during the records search and site visits for the Assessment. Section 5 presents the findings and conclusions of the Assessment.
Resumo:
The Iowa Department of Transportation (IDOT) is currently considering improvements for US Highway 65 (US-65) and Iowa State Highway 330 (IA-330) in Polk and Jasper Counties, Iowa. As part of its project planning effort, IDOT is preparing an Environmental Assessment (EA) report which will include a section entitled "Hazardous Waste" to identify known sites in or near the proposed corridors that are, or could be, contaminated with hazardous or petroleum substances.
Resumo:
An overview of the first 50 years of the Iowa State Highway Commission.