72 resultados para supply planning
Resumo:
Marrow radioiron uptake and marrow blood flow were measured in order to evaluate iron supply for erythropoiesis. Normal, phenylhydrazine-treated and bled animals were studied. The plasma iron turnover of seven normal rabbits was 1.49 +/- 0.22 mg/dl whole blood per d, of 11 rabbits treated 4 d before with phenylhydrazine was 5.16 +/- 1.81, and of four bled animals the plasma iron turnover was 3.75 +/- 1.61. The cardiac output and the percentage of blood flow to the marrow was increased in phenylhydrazine-treated and bled animals. Marrow iron flow in phenylhydrazine-treated animals was 38.3 +/- 32.6 micrograms/min per kg as compared with control values of 7.0 +/- 1.3 (P less than 0.01). This was due to an increase in marrow flow, an increase in plasma iron, and an increase in plasmatocrit. In bled animals, in spite of an increased marrow blood flow, marrow iron flow of 7.3 +/- 2.2 was similar to that of control animals due to a lower plasma iron concentration. The calculated marrow iron extraction of 3.7 +/- 2.4% in phenylhydrazine-treated animals was not different from that of control animals of 4.3 +/- 1.1, whereas extraction was increased in bled animals to 7.9 +/- 1.3 (P less than 0.01). In additional studies of transfused animals, acutely induced anemia was associated with an increased cardiac output, but also with a relative decrease in marrow flow, which left marrow iron supply unaffected. It would appear from these studies that an important mechanism for meeting the increased iron requirement of the hyperplastic erythroid marrow is an increase in marrow blood flow.
Resumo:
We introduce a width parameter that bounds the complexity of classical planning problems and domains, along with a simple but effective blind-search procedure that runs in time that is exponential in the problem width. We show that many benchmark domains have a bounded and small width provided thatgoals are restricted to single atoms, and hence that such problems are provably solvable in low polynomial time. We then focus on the practical value of these ideas over the existing benchmarks which feature conjunctive goals. We show that the blind-search procedure can be used for both serializing the goal into subgoals and for solving the resulting problems, resulting in a ‘blind’ planner that competes well with a best-first search planner guided by state-of-the-art heuristics. In addition, ideas like helpful actions and landmarks can be integrated as well, producing a planner with state-of-the-art performance.
Resumo:
Planning with partial observability can be formulated as a non-deterministic search problem in belief space. The problem is harder than classical planning as keeping track of beliefs is harder than keeping track of states, and searching for action policies is harder than searching for action sequences. In this work, we develop a framework for partial observability that avoids these limitations and leads to a planner that scales up to larger problems. For this, the class of problems is restricted to those in which 1) the non-unary clauses representing the uncertainty about the initial situation are nvariant, and 2) variables that are hidden in the initial situation do not appear in the body of conditional effects, which are all assumed to be deterministic. We show that such problems can be translated in linear time into equivalent fully observable non-deterministic planning problems, and that an slight extension of this translation renders the problem solvable by means of classical planners. The whole approach is sound and complete provided that in addition, the state-space is connected. Experiments are also reported.
Resumo:
Des del 1995 el Consell Europeu ha promogut l’aprenentatge d’una segona llengua a través d’una altra àrea en el que coneixem per CLIL (Contingut i Llengua Integrats en l’Aprenentatge) o en altres paraules: “una activitat en la qual l’aprenentatge d’una llengua estrangera és utilitzada com una eina per l’aprenentatge d’una àrea no linguística en la qual llengua i contingut tenen un mateix paper” (Marsh, 2002). Tot I així, “ensenyar una àrea a través d’una llengua estrangera no és el mateix que la integració de llengua i contingut”. CLIL comporta altres implicacions metodològiques pel que fa a la planificació, estratègies didàctiques i particularment al rol del docent. De fet, són aquests factors els que componen l’èxit o el fracàs en l’implementació de CLIL. i per aquest motiu pretenc analitzar i descriure les diferències entre una sessió de CLIL i una de llengua anglesa. Aquesta investigació és un estudi de cas que vol oferir una mirada a les diferències entre una unitat de CLIL i una de llengua anglesa portades a terme en un grup de 3r de primària a l’escola de Sant Miquel dels Sants (Vic) pel que fa a la planificació, les estratègies i actuacions del docent.
Resumo:
We studied the variations caused by stress in lipoprotein lipase (LPL) activity, LPL-mRNA, and local blood flow in LPL-rich tissues in the rat. Stress was produced by body immobilization (Immo): the rat's limbs were taped to metal mounts, and its head was placed in a plastic tube. Chronic stress (2 h daily of Immo) decreased total LPL activity in mesenteric and epididymal white adipose tissue (WAT) and was accompanied by a weight reduction of these tissues. In limb muscle, heart, and adrenals, total LPL activity and mRNA levels increased, and, in plasma, LPL activity and mass also increased. Acute stress (30-min Immo) caused a decrease in total LPL activity only in retroperitoneal WAT and an increase in preheparin plasma active LPL, but the overall weight of this tissue did not vary significantly. We propose an early release of the enzyme from this tissue into the bloodstream by some unknown extracellular pathways or other local mechanisms. These changes in this key energy-regulating enzyme are probably induced by catecholamines. They modify the flow of energy substrates between tissues, switching the WAT from importer to exporter of free fatty acids and favoring the uptake by muscle of circulating triacylglycerides for energy supply. Moreover, we found that acute stress almost doubled blood flow in all WAT studied, favoring the export of free fatty acids.
Resumo:
From the point of view of local development cultural tourism events represent an opportunity since they are distributed homogeneously by the Catalan territory and are experiencing a vertiginous growth as a way to differentiate the existing supply. In our study a sample of 264 telephone surveys made to organizers of events in Catalonia has been compiled, with the purpose of characterizing the existing supply, thematic typologies, management models, commercialization inputs and economic impact. The results allow us to characterize events from the point of view of their tourist potential. Finally some recommendations are set out to develop future tourism policies based on events according to product differentiation, seasonality, competitiveness and creativity.
Resumo:
Peer-reviewed
Resumo:
Open source is typically outside of normal commercial software procurement processes.The Challenges.Increasingly diverse and distributed set of development resources.Little/no visibility into the origins of the software.Supply Chain Comparison: Hardware vs Software.Open source has revolutionized the mobile and device landscape, other industries will follow.Supply chain management techniques from hardware are useful for managing software.SPDX A standard format for communicating a software Bill of Materials across the supply chain.Effective management and control requires training, tools, processes and standards.
Resumo:
Voltage fluctuations caused by parasitic impedances in the power supply rails of modern ICs are a major concern in nowadays ICs. The voltage fluctuations are spread out to the diverse nodes of the internal sections causing two effects: a degradation of performances mainly impacting gate delays anda noisy contamination of the quiescent levels of the logic that drives the node. Both effects are presented together, in thispaper, showing than both are a cause of errors in modern and future digital circuits. The paper groups both error mechanismsand shows how the global error rate is related with the voltage deviation and the period of the clock of the digital system.
Resumo:
This paper presents a probabilistic approach to model the problem of power supply voltage fluctuations. Error probability calculations are shown for some 90-nm technology digital circuits.The analysis here considered gives the timing violation error probability as a new design quality factor in front of conventional techniques that assume the full perfection of the circuit. The evaluation of the error bound can be useful for new design paradigms where retry and self-recoveringtechniques are being applied to the design of high performance processors. The method here described allows to evaluate the performance of these techniques by means of calculating the expected error probability in terms of power supply distribution quality.
Resumo:
The supply voltage decrease and powerconsumption increase of modern ICs made the requirements for low voltage fluctuation caused by packaging and on-chip parasitic impedances more difficult to achieve. Most of the research works on the area assume that all the nodes of the chip are fed at thesame voltage, in such a way that the main cause of disturbance or fluctuation is the parasitic impedance of packaging. In the paper an approach to analyze the effect of high and fast current demands on the on-chip power supply network. First an approach to model the entire network by considering a homogeneous conductive foil is presented. The modification of the timing parameters of flipflops caused by spatial voltage drops through the IC surface are also investigated.
Resumo:
The first section of this paper summarises the most relevant charateristics of the contemporary tourist model, also called postfordist or postmodernist. In the second part the traditional tourist model developed in the Costa Brava in the past decades, is reviewed. Emphasising the saturation of tourist facilities on the coast line, expansive urban growth, thanks to a tolerant administration, poor complementary supply and concentrated demand in few markets and the proximity of Barcelona conurbation, stressed by second homes. In the third section, some strategies developed in recent years to readapt the Costa Brava to the new tendencies in tourism, are presented. Incorporation of the inland to the tourist product, new planning policics, lessening urban densities and height, and a change in mind in favour of protected natural areas, diversification of demand with new markets, specially form Eastern Europe (although this might be considered as a continuation ofthe traditional tourist model) and the emergence of local strategies oriented towards the creation of new tourist products based upon natural and cultural resources
Resumo:
Spain’s transport infrastructure policy has become a paradigmatic case of oversupply and of mismatch with demand. The massive expansion of the country’s transport infrastructure over the last decade has not been a response to demand bottlenecks or previously identified needs. For this reason, the intensity of use today on all interurban modes of transport in Spain falls well below that of other EU countries. This paper analyzes the institutional and regulatory factors that have permitted this policy, allowing us to draw lessons from the Spanish case that should help other countries avoid the pitfalls and shortcomings of Spanish policy.
Resumo:
Spain’s transport infrastructure policy has become a paradigmatic case of oversupply and of mismatch with demand. The massive expansion of the country’s transport infrastructure over the last decade has not been a response to demand bottlenecks or previously identified needs. For this reason, the intensity of use today on all interurban modes of transport in Spain falls well below that of other EU countries. This paper analyzes the institutional and regulatory factors that have permitted this policy, allowing us to draw lessons from the Spanish case that should help other countries avoid the pitfalls and shortcomings of Spanish policy.
Resumo:
The effect of dissolved nutrients on growth, nutrient content and uptake rates of Chaetomorpha linum in a Mediterranean coastal lagoon (Tancada, Ebro delta, NE Spain) was studied in laboratory experiments. Water was enriched with distinct forms of nitrogen, such as nitrate or ammonium and phosphorus. Enrichment with N, P or with both nutrients resulted in a significant increase in the tissue content of these nutrients. N-enrichment was followed by an increase in chlorophyll content after 4 days of treatment, although the difference was only significant when nitrate was added without P. P-enrichment had no significant effect on chlorophyll content. In all the treatments an increase in biomass was obseved after 10 days. This increase was higher in the N+P treatments. In all the treatments the uptake rate was significantly higher when nutrients were added than in control jars. The uptake rate of N, as ammonium, and P were significantly higher when they were added alone while that of N as nitrate was higher in the N+P treatment. In the P-enriched cultures, the final P-content of macroalgal tissues was ten-fold that of the initial tissue concentrations, thereby indicating luxury P-uptake. Moreover, at the end of the incubation the N:P ratio increased to 80, showing that P rather than N was the limiting factor for C. linum in the Tancada lagoon. The relatively high availability of N is related to the N inputs from rice fields that surround the lagoon and to P binding in sediments.