32 resultados para Optimal monitoring
Resumo:
Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Gestão e Sistemas Ambientais
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
Dissertation submitted in partial fulfilment of the requirements for the Degree of Master of Science in Geospatial Technologies
Resumo:
Impact Assessment and Project Appraisal, vol. 22, n.1, March 2004, p. 47–62
Resumo:
Monitoring systems have traditionally been developed with rigid objectives and functionalities, and tied to specific languages, libraries and run-time environments. There is a need for more flexible monitoring systems which can be easily adapted to distinct requirements. On-line monitoring has been considered as increasingly important for observation and control of a distributed application. In this paper we discuss monitoring interfaces and architectures which support more extensible monitoring and control services. We describe our work on the development of a distributed monitoring infrastructure, and illustrate how it eases the implementation of a complex distributed debugging architecture. We also discuss several issues concerning support for tool interoperability and illustrate how the cooperation among multiple concurrent tools can ease the task of distributed debugging.
Resumo:
Dissertation to obtain the Master degree in Electrical Engineering and Computer Science
Resumo:
Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.
Resumo:
Dissertation submitted in partial fulfillment of the requirements for the Degree of Master of Science in Geospatial Technologies.
Resumo:
RESTAPIA 2012 - Int. Conf. on Rammed Earth Conservation, Valencia, 21-23 June 2012
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia Biomédica
Resumo:
The alignment of collective goals and individual behavior has been extensively studied by economists under a principal-agent framework. Two main solutions have been presented: explicit incentive contracts and monitoring. These solutions correspond to changes in the objective situation faced by individuals. However, an extensive literature in social psychology provides evidence that behavior is influenced, not only by situational constraints, but also by attitudes. Therefore, an important aspect of organization is to choose the structures and procedures that best contribute to the dissemination of the desired attitudes throughout the organization. This paper studies how the initial configuration of attitudes and the size of the organization affect the optimal organizational structure and the timing of information flows when the objective is to align the members' attitudes. We identify and characterize three factors that affect the optimal organizational structures and procedures and the degree of alignment of attitudes: (1) clustering effects; (2) member cross-influence effects; and (3) leader cross-influence effects.
Resumo:
We characterize the optimal job design in a multitasking environment when the firms rely on implicit incentive contracts (i.e., bonus payments). Two natural forms of job design are compared: (i) individual accountability, where each agent is assigned to a particular job and assumes full responsibility for its outcome; and (ii) team accountability, where a group of agents share responsibility for a job and are jointly accountable for its outcome. The key trade-off is that team accountability mitigates the multitasking problem but may weaken the implicit contracts. The optimal job design follows a cut-off rule: firms with high reputation concerns opt for team accountability, whereas firms with low reputation concerns opt for individual accountability. Team accountability is more likely the more acute the multitasking problem is. However, the cut-off rule need not hold if the firm combines implicit incentives with explicit pay-per-performance contracts.
Resumo:
Dissertação para obtenção do Grau de Doutor em Química Sustentável
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia Informática