8 resultados para Australian construction industry


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau de Doutor em Engenharia Industrial

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Proceedings IGLC-18, July 2010, Technion, Haifa, Israel

Relevância:

90.00% 90.00%

Publicador:

Resumo:

21th Annual Conference of the International Group for Lean Construction (IGLC 21), July 2013, Fortaleza, Brazil

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Dissertação para obtenção do Grau Mestre em Engenharia Civil – Perfil de Construção

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The scope of the following study is to present an alternative and preventive dispute resolution method known as Dispute Resolution Board. The Dispute Resolution Board mechanism is included in construction contracts to support project participants in avoiding and resolving disputes. Over the years the construction industry dealt with the resolution of claims and disputes through several methods. One of the most successful and lasting is the Dispute Resolution Board. A Dispute Resolution Board is a board of impartial professionals formed at the start of the project to follow construction progress, prevent arising disputes, and assist in the resolution of disputes during the project. When a dispute arises the Board meets with the parties to settle this dispute. The recommendation of this Board is non-binding for the parties. In Portugal there is no experience with this form of conciliation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Vanadium dioxide (VO2) is a promising material with large interest in construction industry and architecture, due to its thermochromic properties. This material may be used to create "smart" coatings that result in improvements in the buildings energy efficiency, by reducing heat exchanges and, consequently, the need for acclimatization. In this work, VO2 thin films and coatings were produced and tested in laboratory, to apply in architectural elements, such as glass, rooftop tiles and exterior paints. Thin films were produced by RF magnetron sputtering and VO2 nanoparticles were obtained through hydrothermal synthesis, aiming to create "smart" windows and tiles, respectively. These coatings have demonstrated the capability to modulate the transmittance of infrared radiation by around 20%. The VO2 nanoparticle coatings were successfully applied on ceramic tiles. The critical temperature was reduced to around 40ºC by tungsten doping. Ultimately, two identical house models were built, in order to test the VO2 coatings, in real atmospheric conditions during one of the hottest months of the year, in Portugal – August.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The scope of the following study is to present an alternative and preventive dispute resolution method known as Dispute Resolution Board. The Dispute Resolution Board mechanism is included in construction contracts to support project participants in avoiding and resolving disputes. Over the years the construction industry dealt with the resolution of claims and disputes through several methods. One of the most successful and lasting is the Dispute Resolution Board. A Dispute Resolution Board is a board of impartial professionals formed at the start of the project to follow construction progress, prevent arising disputes, and assist in the resolution of disputes during the project. When a dispute arises the Board meets with the parties to settle this dispute. The recommendation of this Board is non-binding for the parties. In Portugal there is no experience with this form of conciliation.