60 resultados para Link quality estimation
Resumo:
Dissertação para obtenção do Grau de Mestre em Engenharia Biomédica
Resumo:
This article develops a latent class model for estimating willingness-to-pay for public goods using simultaneously contingent valuation (CV) and attitudinal data capturing protest attitudes related to the lack of trust in public institutions providing those goods. A measure of the social cost associated with protest responses and the consequent loss in potential contributions for providing the public good is proposed. The presence of potential justification biases is further considered, that is, the possibility that for psychological reasons the response to the CV question affects the answers to the attitudinal questions. The results from our empirical application suggest that psychological factors should not be ignored in CV estimation for policy purposes, allowing for a correct identification of protest responses.
Resumo:
Dissertação para obtenção do Grau de Doutora em Estatística e Gestão de Risco, Especialidade em Estatística
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Informática
Resumo:
Dissertação para obtenção do Grau de Doutor em Alterações Climáticas e Políticas de Desenvolvimento Sustentável
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia do Ambiente
Resumo:
Water is a limited resource for which demand is growing. Contaminated water from inadequate wastewater treatment provides one of the greatest health challenges as it restricts development and increases poverty in emerging and developing countries. Therefore, the connection between wastewater and human health is linked to access to sanitation and to human waste disposal. Adequate sanitation is expected to create a barrier between disposed human excreta and sources of drinking water. Different approaches to wastewater management are required for different geographical regions and different stages of economic governance depending on the capacity to manage wastewater. Effective wastewater management can contribute to overcome the challenges of water scarcity. Separate collection of human urine at its source is one promising approach that strongly reduces the economic and load demands on wastewater treatment plants (WWTP). Treatment of source-separated urine appears as a sanitation system that is affordable, produces a valuable fertiliser, reduces pollution of water resources and promotes health. However, the technical realisation of urine separation still faces challenges. Biological hydrolysis of urea causes a strong increase of ammonia and pH. Under these conditions ammonia volatilises which can cause odour problems and significant nitrogen losses. The above problems can be avoided by urine stabilisation. Biological nitrification is a suitable process for stabilisation of urine. Urine is a highly concentrated nutrient solution which can lead to strong inhibition effects during bacterial nitrification. This can further lead to process instabilities. The major cause of instability is accumulation of the inhibitory intermediate compound nitrite, which could lead to process breakdown. Enhanced on-line nitrite monitoring can be applied in biological source-separated urine nitrification reactors as a sustainable and efficient way to improve the reactor performance, avoiding reactor failures and eventual loss of biological activity. Spectrophotometry appears as a promising candidate for the development and application of on-line nitrite monitoring. Spectroscopic methods together with chemometrics are presented in this work as a powerful tool for estimation of nitrite concentrations. Principal component regression (PCR) is applied for the estimation of nitrite concentrations using an immersible UV sensor and off-line spectra acquisition. The effect of particles and the effect of saturation, respectively, on the UV absorbance spectra are investigated. The analysis allows to conclude that (i) saturation has a substantial effect on nitrite estimation; (ii) particles appear to have less impact on nitrite estimation. In addition, improper mixing together with instabilities in the urine nitrification process appears to significantly reduce the performance of the estimation model.
Resumo:
The Corporate world is becoming more and more competitive. This leads organisations to adapt to this reality, by adopting more efficient processes, which result in a decrease in cost as well as an increase of product quality. One of these processes consists in making proposals to clients, which necessarily include a cost estimation of the project. This estimation is the main focus of this project. In particular, one of the goals is to evaluate which estimation models fit the Altran Portugal software factory the most, the organization where the fieldwork of this thesis will be carried out. There is no broad agreement about which is the type of estimation model more suitable to be used in software projects. Concerning contexts where there is plenty of objective information available to be used as input to an estimation model, model-based methods usually yield better results than the expert judgment. However, what happens more frequently is not having this volume and quality of information, which has a negative impact in the model-based methods performance, favouring the usage of expert judgement. In practice, most organisations use expert judgment, making themselves dependent on the expert. A common problem found is that the performance of the expert’s estimation depends on his previous experience with identical projects. This means that when new types of projects arrive, the estimation will have an unpredictable accuracy. Moreover, different experts will make different estimates, based on their individual experience. As a result, the company will not directly attain a continuous growing knowledge about how the estimate should be carried. Estimation models depend on the input information collected from previous projects, the size of the project database and the resources available. Altran currently does not store the input information from previous projects in a systematic way. It has a small project database and a team of experts. Our work is targeted to companies that operate in similar contexts. We start by gathering information from the organisation in order to identify which estimation approaches can be applied considering the organization’s context. A gap analysis is used to understand what type of information the company would have to collect so that other approaches would become available. Based on our assessment, in our opinion, expert judgment is the most adequate approach for Altran Portugal, in the current context. We analysed past development and evolution projects from Altran Portugal and assessed their estimates. This resulted in the identification of common estimation deviations, errors, and patterns, which lead to the proposal of metrics to help estimators produce estimates leveraging past projects quantitative and qualitative information in a convenient way. This dissertation aims to contribute to more realistic estimates, by identifying shortcomings in the current estimation process and supporting the self-improvement of the process, by gathering as much relevant information as possible from each finished project.
Resumo:
This study deals with investigating the groundwater quality for irrigation purpose, the vulnerability of the aquifer system to pollution and also the aquifer potential for sustainable water resources development in Kobo Valley development project. The groundwater quality is evaluated up on predicting the best possible distribution of hydrogeochemicals using geostatistical method and comparing them with the water quality guidelines given for the purpose of irrigation. The hydro geochemical parameters considered are SAR, EC, TDS, Cl-, Na+, Ca++, SO4 2- and HCO3 -. The spatial variability map reveals that these parameters falls under safe, moderate and severe or increasing problems. In order to present it clearly, the aggregated Water Quality Index (WQI) map is constructed using Weighted Arithmetic Mean method. It is found that Kobo-Gerbi sub basin is suffered from bad water quality for the irrigation purpose. Waja Golesha sub-basin has moderate and Hormat Golena is the better sub basin in terms of water quality. The groundwater vulnerability assessment of the study area is made using the GOD rating system. It is found that the whole area is experiencing moderate to high risk of vulnerability and it is a good warning for proper management of the resource. The high risks of vulnerability are noticed in Hormat Golena and Waja Golesha sub basins. The aquifer potential of the study area is obtained using weighted overlay analysis and 73.3% of the total area is a good site for future water well development. The rest 26.7% of the area is not considered as a good site for spotting groundwater wells. Most of this area fall under Kobo-Gerbi sub basin.