Resumo:
This paper proposes a computationally efficient methodology for the optimal location and sizing of static and switched shunt capacitors in large distribution systems. The problem is formulated as the maximization of the savings produced by the reduction in energy losses and the avoided costs due to investment deferral in the expansion of the network. The proposed method selects the nodes to be compensated, as well as the optimal capacitor ratings and their operational characteristics, i.e. fixed or switched. After an appropriate linearization, the optimization problem was formulated as a large-scale mixed-integer linear problem, suitable for being solved by means of a widespread commercial package. Results of the proposed optimizing method are compared with another recent methodology reported in the literature using two test cases: a 15-bus and a 33-bus distribution network. For the both cases tested, the proposed methodology delivers better solutions indicated by higher loss savings, which are achieved with lower amounts of capacitive compensation. The proposed method has also been applied for compensating to an actual large distribution network served by AES-Venezuela in the metropolitan area of Caracas. A convergence time of about 4 seconds after 22298 iterations demonstrates the ability of the proposed methodology for efficiently handling large-scale compensation problems.
Resumo:
Mestrado em Engenharia Química
Resumo:
Mestrado em Engenharia Electrotécnica e de Computadores
Resumo:
Este trabalho insere-se no domínio da calibração energética dos equipamentos SPT, dando seguimento ao disposto na norma EN ISO 22476-3, de aplicação obrigatória em Portugal. Para tal foi utilizada uma vara instrumentada, cuja instrumentação consiste em strain-gauges e acelerómetros piezoeléctricos. Esta instrumentação encontra-se fixa a um trecho de vara com comprimento de 60 cm e para a aquisição dos dados foi utilizado o sistema SPT Analyzer® comercializado pela firma PDI. O sistema permite registar os dados provenientes da instrumentação: sinais de um par de strain-gauges, transformados em registos de força (F1 e F2) e sinais de um par de acelerómetros, convertidos em registos de velocidade (V1 e V2) ao longo do tempo. O equipamento permite a avaliação, em tempo real, da qualidade dos registos e da energia máxima transmitida à vara em cada golpe e o conhecimento do deslocamento vertical do trem de varas ocorrido em cada golpe do martelo. Por outro lado, baseando-se no tema acima referido, pretende-se ainda desenvolver esforços no sentido de melhorar o novo método interpretativo dos resultados dos ensaios SPT e sua aplicação ao dimensionamento de estacas, dado que a previsão da capacidade de carga de estacas constitui um dos desafios da engenharia de fundações por requerer a estimativa de propriedades do solo, alterações pela execução da fundação e conhecimento do mecanismo de interacção solo-estaca. Este novo procedimento baseia-se nos princípios da dinâmica, rompendo com as metodologias até aqui consagradas, de natureza essencialmente empírica. A nova forma de interpretar os ensaios SPT, consubstanciada nos princípios de conservação de energia na cravação do amostrador SPT, irá permitir converter analiticamente o valor Nspt numa força dinâmica de reacção à penetração. A decomposição desta força dinâmica permite efectuar análises comparativas entre as resistências unitárias mobilizadas no amostrador SPT (modelo) e as mobilizadas na estaca (protótipo).
Resumo:
Neste trabalho é desenvolvida uma bancada didáctica que permite simular o funcionamento de um sistema de microgeração. A bancada inclui uma máquina síncrona responsável pela geração de energia eléctrica acoplada a uma máquina de indução que simula a máquina primária. A máquina de indução é controlada por um sistema electrónico de controlo de potência (variador de velocidade) que permite manter constante a velocidade de rotação e consequentemente a frequência da tensão gerada pela máquina síncrona. Por sua vez, a excitação da máquina síncrona é controla por uma fonte de tensão externa. A parametrização e controlo do variador de velocidade, assim como o controlo da fonte de tensão externa, são feitos a partir dum software que corre num PC, que também monitoriza a tensão gerada pela máquina síncrona. Este software é ainda responsável pela interface com o utilizador. O software desenvolvido permite manter as características da tensão gerada pela máquina síncrona independentemente da carga imposta.
Resumo:
Este trabalho é baseado no simulador de redes PST2200 do Laboratório de Sistemas de Energia (LSE) pois está avariado com vários problemas conhecidos, designadamente: - Defeito de isolamento (disparo de diferencial), - Desregulação da velocidade da máquina primária (motor DC), - Circuito de excitação da máquina síncrona inoperacional, - Inexistência de esquemas elétricos dos circuitos do simulador, - Medidas desreguladas e com canais de medida com circuito impresso queimado. O trabalho executado foi: - O levantamento e desenho de raiz (não existe qualquer manual) dos esquemas dos 10 módulos do simulador, designadamente naqueles com avaria ou com desempenho problemático a fim de que se possa ter uma visão mais pormenorizada dos circuitos e seus problemas, por forma a intervir para os minimizar e resolver, - Foi realizado o diagnóstico de avaria do simulador e foram propostas soluções para os mesmos, - Realizaram-se as intervenções propostas e aprovadas. Nas intervenções realizadas, os princípios orientadores foram: - Aumentar a robustez do equipamento por forma a garantir a sua integridade a utilizações menos apropriados e manobras 'exóticas' próprias de alunos, que pela sua condição, estão em fase de aprendizagem, - Atualizar o equipamento, colocando-o em sintonia com o 'estado da arte', - Como fator de valorização suplementar, foi concebida e aplicada a supervisão remota do funcionamento do simulador através da rede informática. Foram detetados inúmeros erros: - Má ligação do motor de corrente continua ao variador, resultando a falta de controlo da frequência da rede do sistema, - Ligações entre painéis trocadas resultando em avarias diversas das fontes de alimentação, - Cartas eletrónicas de medidas avariadas e que além de se reparar, foram também calibradas. Devido ao mecenato da empresa Schnitt + Sohn participando monetariamente, fez-se o projeto de alteração e respetiva execução de grande parte do simulador aumentando a fiabilidade do mesmo, diminuindo assim a frequência das avarias naturais mais as que acontecem involuntariamente devido a este ser um instrumento didático. Além do trabalho elétrico, foi feito muito trabalho de chaparia para alteração de estrutura e suporte do material com diferenças de posicionamento. Neste trabalho dá-se também alguns exemplos de cálculo e simulação das redes de transporte que se pode efetuar no simulador como estudo e simulação de avarias num sistema produtivo real. Realizou-se a monitorização de dois aparelhos indicadores de parâmetros de energia (Janitza UMG96S) através duma rede com dois protocolos ethernet e profibus utilizando o plc (Omron CJ2M) como valorização do trabalho.
Resumo:
This paper is a contribution for the assessment and comparison of magnet properties based on magnetic field characteristics particularly concerning the magnetic induction uniformity in the air gaps. For this aim, a solver was developed and implemented to determine the magnetic field of a magnetic core to be used in Fast Field Cycling (FFC) Nuclear Magnetic Resonance (NMR) relaxometry. The electromagnetic field computation is based on a 2D finite-element method (FEM) using both the scalar and the vector potential formulation. Results for the magnetic field lines and the magnetic induction vector in the air gap are presented. The target magnetic induction is 0.2 T, which is a typical requirement of the FFC NMR technique, which can be achieved with a magnetic core based on permanent magnets or coils. In addition, this application requires high magnetic induction uniformity. To achieve this goal, a solution including superconducting pieces is analyzed. Results are compared with a different FEM program.
Resumo:
P-NET is a multi-master fieldbus standard based on a virtual token passing scheme. In P-NET each master is allowed to transmit only one message per token visit. In the worst-case, the communication response time can be derived considering that, in each token cycle, all stations use the token to transmit a message. In this paper, we define a more sophisticated P-NET model, which considers the actual token utilisation. We then analyse the possibility of implementing a local priority-based scheduling policy to improve the real-time behaviour of P-NET.
Resumo:
In this paper we address the real-time capabilities of P-NET, which is a multi-master fieldbus standard based on a virtual token passing scheme. We show how P-NET’s medium access control (MAC) protocol is able to guarantee a bounded access time to message requests. We then propose a model for implementing fixed prioritybased dispatching mechanisms at each master’s application level. In this way, we diminish the impact of the first-come-first-served (FCFS) policy that P-NET uses at the data link layer. The proposed model rises several issues well known within the real-time systems community: message release jitter; pre-run-time schedulability analysis in non pre-emptive contexts; non-independence of tasks at the application level. We identify these issues in the proposed model and show how results available for priority-based task dispatching can be adapted to encompass priority-based message dispatching in P-NET networks.
Resumo:
While the earliest deadline first algorithm is known to be optimal as a uniprocessor scheduling policy, the implementation comes at a cost in terms of complexity. Fixed taskpriority algorithms on the other hand have lower complexity but higher likelihood of task sets being declared unschedulable, when compared to earliest deadline first (EDF). Various attempts have been undertaken to increase the chances of proving a task set schedulable with similar low complexity. In some cases, this was achieved by modifying applications to limit preemptions, at the cost of flexibility. In this work, we explore several variants of a concept to limit interference by locking down the ready queue at certain instances. The aim is to increase the prospects of schedulability of a given task system, without compromising on complexity or flexibility, when compared to the regular fixed task-priority algorithm. As a final contribution, a new preemption threshold assignment algorithm is provided which is less complex and more straightforward than the previous method available in the literature.
Resumo:
We present a 12*(1+|R|/(4m))-speed algorithm for scheduling constrained-deadline sporadic real-time tasks on a multiprocessor comprising m processors where a task may request one of |R| sequentially-reusable shared resources.
Resumo:
In this paper we consider global fixed-priority preemptive multiprocessor scheduling of constrained-deadline sporadic tasks that share resources in a non-nested manner. We develop a novel resource-sharing protocol and a corresponding schedulability test for this system. We also develop the first schedulability analysis of priority inheritance protocol for the aforementioned system. Finally, we show that these protocols are efficient (based on the developed schedulability tests) for a class of priority-assignments called reasonable priority-assignments.
Resumo:
Consider global fixed-priority preemptive multiprocessor scheduling of implicit-deadline sporadic tasks. I conjecture that the utilization bound of SM-US(√2−1) is √2-1.
Resumo:
Real-time scheduling usually considers worst-case values for the parameters of task (or message stream) sets, in order to provide safe schedulability tests for hard real-time systems. However, worst-case conditions introduce a level of pessimism that is often inadequate for a certain class of (soft) real-time systems. In this paper we provide an approach for computing the stochastic response time of tasks where tasks have inter-arrival times described by discrete probabilistic distribution functions, instead of minimum inter-arrival (MIT) values.
Resumo:
Si3N4 tools were coated with a thin diamond film using a Hot-Filament Chemical Vapour Deposition (HFCVD) reactor, in order to machining a grey cast iron. Wear behaviour of these tools in high speed machining was the main subject of this work. Turning tests were performed with a combination of cutting speeds of 500, 700 and 900 m min−1, and feed rates of 0.1, 0.25 and 0.4 mm rot−1, remaining constant the depth of cut of 1 mm. In order to evaluate the tool behaviour during the turning tests, cutting forces were analyzed being verified a significant increase with feed rate. Diamond film removal occurred for the most severe set of cutting parameters. It was also observed the adhesion of iron and manganese from the workpiece to the tool. Tests were performed on a CNC lathe provided with a 3-axis dynamometer. Results were collected and registered by homemade software. Tool wear analysis was achieved by a Scanning Electron Microscope (SEM) provided with an X-ray Energy Dispersive Spectroscopy (EDS) system. Surface analysis was performed by a profilometer.