58 resultados para Standard penetration test

em Instituto Politécnico do Porto, Portugal


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The increasing complexity of VLSI circuits and the reduced accessibility of modern packaging and mounting technologies restrict the usefulness of conventional in-circuit debugging tools, such as in-circuit emulators for microprocessors and microcontrollers. However, this same trend enables the development of more complex products, which in turn require more powerful debugging tools. These conflicting demands could be met if the standard scan test infrastructures now common in most complex components were able to match the debugging requirements of design verification and prototype validation. This paper analyses the main debug requirements in the design of microprocessor-based applications and the feasibility of their implementation using the mandatory, optional and additional operating modes of the standard IEEE 1149.1 test infrastructure.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Electric vehicles introduction will affect cities environment and urban mobility policies. Network system operators will have to consider the electric vehicles in planning and operation activities due to electric vehicles’ dependency on the electricity grid. The present paper presents test cases using an Electric Vehicle Scenario Simulator (EVeSSi) being developed by the authors. The test cases include two scenarios considering a 33 bus network with up to 2000 electric vehicles in the urban area. The scenarios consider a penetration of 10% of electric vehicles (200 of 2000), 30% (600) and 100% (2000). The first scenario will evaluate network impacts and the second scenario will evaluate CO2 emissions and fuel consumption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ART-WiSe (Architecture for Real-Time communications in Wireless Sensor Networks) framework aims at the design of new communication architectures and mechanisms for time-sensitive Wireless Sensor Networks (WSNs). We adopted a two-tiered architecture where an overlay Wireless Local Area Network (Tier 2) serves as a backbone for a WSN (Tier 1), relying on existing standard communication protocols and commercial-off-the-shell (COTS) technologies – IEEE 802.15.4/ZigBee for Tier 1 and IEEE 802.11 for Tier 2. In this line, a test-bed application is being developed for assessing, validating and demonstrating the ART-WiSe architecture. A pursuit-evasion application was chosen since it fulfils a number of requirements, namely it is feasible and appealing and imposes some stress to the architecture in terms of timeliness. To develop the testbed based on the previously referred technologies, an implementation of the IEEE 8021.5.4/ZigBee protocols is being carried out, since there is no open source available to the community. This paper highlights some relevant aspects of the ART-WiSe architecture, provides some intuition on the protocol stack implementation and presents a general view over the envisaged test-bed application.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of adhesive joints has increased in recent decades due to its competitive features compared with traditional methods. This work aims to estimate the tensile critical strain energy release rate (GIC) of adhesive joints by the Double-Cantilever Beam (DCB) test. The J-integral is used since it enables obtaining the tensile Cohesive Zone Model (CZM) law. An optical measuring method was developed for assessing the crack tip opening (δn) and adherends rotation (θo). The proposed CZM laws were best approximated by a triangular shape for the brittle adhesive and a trapezoidal shape for the two ductile adhesives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years, power systems have experienced many changes in their paradigm. The introduction of new players in the management of distributed generation leads to the decentralization of control and decision-making, so that each player is able to play in the market environment. In the new context, it will be very relevant that aggregator players allow midsize, small and micro players to act in a competitive environment. In order to achieve their objectives, virtual power players and single players are required to optimize their energy resource management process. To achieve this, it is essential to have financial resources capable of providing access to appropriate decision support tools. As small players have difficulties in having access to such tools, it is necessary that these players can benefit from alternative methodologies to support their decisions. This paper presents a methodology, based on Artificial Neural Networks (ANN), and intended to support smaller players. In this case the present methodology uses a training set that is created using energy resource scheduling solutions obtained using a mixed-integer linear programming (MIP) approach as the reference optimization methodology. The trained network is used to obtain locational marginal prices in a distribution network. The main goal of the paper is to verify the accuracy of the ANN based approach. Moreover, the use of a single ANN is compared with the use of two or more ANN to forecast the locational marginal price.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In smart grids context, the distributed generation units based in renewable resources, play an important rule. The photovoltaic solar units are a technology in evolution and their prices decrease significantly in recent years due to the high penetration of this technology in the low voltage and medium voltage networks supported by governmental policies and incentives. This paper proposes a methodology to determine the maximum penetration of photovoltaic units in a distribution network. The paper presents a case study, with four different scenarios, that considers a 32-bus medium voltage distribution network and the inclusion storage units.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Currently, power systems (PS) already accommodate a substantial penetration of distributed generation (DG) and operate in competitive environments. In the future, as the result of the liberalisation and political regulations, PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage and provide market agents to ensure a flexible and secure operation. This cannot be done with the traditional PS operational tools used today like the quite restricted information systems Supervisory Control and Data Acquisition (SCADA) [1]. The trend to use the local generation in the active operation of the power system requires new solutions for data management system. The relevant standards have been developed separately in the last few years so there is a need to unify them in order to receive a common and interoperable solution. For the distribution operation the CIM models described in the IEC 61968/70 are especially relevant. In Europe dispersed and renewable energy resources (D&RER) are mostly operated without remote control mechanisms and feed the maximal amount of available power into the grid. To improve the network operation performance the idea of virtual power plants (VPP) will become a reality. In the future power generation of D&RER will be scheduled with a high accuracy. In order to realize VPP decentralized energy management, communication facilities are needed that have standardized interfaces and protocols. IEC 61850 is suitable to serve as a general standard for all communication tasks in power systems [2]. The paper deals with international activities and experiences in the implementation of a new data management and communication concept in the distribution system. The difficulties in the coordination of the inconsistent developed in parallel communication and data management standards - are first addressed in the paper. The upcoming unification work taking into account the growing role of D&RER in the PS is shown. It is possible to overcome the lag in current practical experiences using new tools for creating and maintenance the CIM data and simulation of the IEC 61850 protocol – the prototype of which is presented in the paper –. The origin and the accuracy of the data requirements depend on the data use (e.g. operation or planning) so some remarks concerning the definition of the digital interface incorporated in the merging unit idea from the power utility point of view are presented in the paper too. To summarize some required future work has been identified.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power Systems (PS), have been affected by substantial penetration of Distributed Generation (DG) and the operation in competitive environments. The future PS will have to deal with large-scale integration of DG and other distributed energy resources (DER), such as storage means, and provide to market agents the means to ensure a flexible and secure operation. Virtual power players (VPP) can aggregate a diversity of players, namely generators and consumers, and a diversity of energy resources, including electricity generation based on several technologies, storage and demand response. This paper proposes an artificial neural network (ANN) based methodology to support VPP resource schedule. The trained network is able to achieve good schedule results requiring modest computational means. A real data test case is presented.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Significant work has been done in the areas of Pervcomp/Ubicomp Smart Environments with advances on making proactive systems, but those advances have not made these type of systems accurately proactive. On the other hand a great deal is needed to make systems more sensible/sensitive and trustable (both in terms of reliability and privacy). We put forward the thesis that a more integral and social-aware sort of intelligence is needed to effectively interact, decide and act on behalf of people’s interest and that a way to test how effective systems are achieving these desirable behaviour is needed as a consequence. We support our thesis by providing examples on how to measure effectiveness in variety of different environments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mathematical Program with Complementarity Constraints (MPCC) finds applica- tion in many fields. As the complementarity constraints fail the standard Linear In- dependence Constraint Qualification (LICQ) or the Mangasarian-Fromovitz constraint qualification (MFCQ), at any feasible point, the nonlinear programming theory may not be directly applied to MPCC. However, the MPCC can be reformulated as NLP problem and solved by nonlinear programming techniques. One of them, the Inexact Restoration (IR) approach, performs two independent phases in each iteration - the feasibility and the optimality phases. This work presents two versions of an IR algorithm to solve MPCC. In the feasibility phase two strategies were implemented, depending on the constraints features. One gives more importance to the complementarity constraints, while the other considers the priority of equality and inequality constraints neglecting the complementarity ones. The optimality phase uses the same approach for both algorithm versions. The algorithms were implemented in MATLAB and the test problems are from MACMPEC collection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Engenharia Química

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Mestrado em Engenharia Electrotécnica e de Computadores

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este trabalho teve como objectivo a optimização das condições de crescimento de biomassa algal tendo em vista a sua utilização como fonte de lípidos para biocombustíveis. Assim, procedeu-se à inoculação de duas estirpes, a Dunaliella tertiolecta (água salgada) e a Tetraselmis subcordiformis (água salobra), seleccionando-se a Dunaliella tertiolecta uma vez que esta apresentou um crescimento mais rápido. Escolhida a estirpe a usar, avaliou-se a influência da composição do meio de cultura da espécie, variando-se a concentração de macronutrientes (Magnésio, Potássio, Azoto, Fósforo) e de micronutrientes (Manganês, Zinco, Ferro, Cobalto) presentes no meio em 10 e 20 vezes, comparativamente à do meio de cultura padrão, o meio Artificial Seawater Medium with Vitamins. Avaliou-se o crescimento algal, a uma temperatura de 25 ºC ± 2 ºC, com uma intensidade de iluminação de 5000 lux (lâmpadas luz dia) e fotoperíodos 12:12 h, controlando possíveis contaminações nas culturas em estudo. Para os ensaios realizados com a Dunaliella tertiolecta, os melhores resultados para a produtividade média e máxima de biomassa, 63,06 mgbiomassa seca/L.dia e 141,79 mgbiomassa seca/L.dia, respectivamente, foram obtidos no ensaio em que se fez variar 10 vezes a concentração de azoto (sob a forma de nitrato). Os resultados mais satisfatórios para o teor lípidico e para a produtividade lipídica máxima, 33,45% e 47,43 mgóleo/L.dia respectivamente, também foram obtidos no ensaio em que se fez variar 10 vezes a concentração de azoto (sob a forma de nitrato), (com extracção dos lípidos usando o método de Bligh e Dyer). Foram testados dois solventes para a extracção de lipídos, o clorofórmio e o hexano, tendose obtido resultados superiores com o clorofórmio, comparativamente aos obtidos quando se usou hexano, com excepção do ensaio em que se aumentou 20 vezes a concentração de fósforo no meio de cultura das microalgas. Verificou-se que, em todos os ensaios foi atingido o estado estacionário sensivelmente na mesma altura, isto é, decorridos cerca de 25 dias após o início do estudo, excepto os ensaios em que se fez variar a concentração de cobalto, para os quais as culturas não se adaptaram às alterações do meio, acabando por morrer passados 15 dias. A adição dos macronutrientes e micronutrientes usados nos ensaios, nas quantidades testadas, não influenciou significativamente a produtividade lipídica, com excepção do azoto e ferro. Conclui-se que o aumento da concentração de azoto para 10x o valor padrão potencia o aumento da produtividade lipídica máxima para mais do dobro (3,6 vezes – Padrão: 13,25 mgóleo/L.dia; 10x N: 47,43 mgóleo/L.dia) e que o aumento da concentração de ferro para 10x o valor padrão potencia o aumento da produtividade lipídica máxima para aproximadamente o dobro (1,9 vezes - Padrão: 14,61 mgóleo/L.dia; 10x Fe: 28,04 mgóleo/L.dia). Nos ensaios realizados com adição de azoto ou ferro, os resultados obtidos para a concentração, teor lípidico e produtividade lipídica máxima, foram sempre superiores aos do padrão correspondente, pelo que se pode concluir que estes ensaios se apresentam como os mais promissores deste estudo, embora o ensaio mais satisfatório tenha sido aquele em que se promoveu a alteração da concentração de azoto para 10 vezes o valor padrão.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Este trabalho insere-se no domínio da calibração energética dos equipamentos SPT, dando seguimento ao disposto na norma EN ISO 22476-3, de aplicação obrigatória em Portugal. Para tal foi utilizada uma vara instrumentada, cuja instrumentação consiste em strain-gauges e acelerómetros piezoeléctricos. Esta instrumentação encontra-se fixa a um trecho de vara com comprimento de 60 cm e para a aquisição dos dados foi utilizado o sistema SPT Analyzer® comercializado pela firma PDI. O sistema permite registar os dados provenientes da instrumentação: sinais de um par de strain-gauges, transformados em registos de força (F1 e F2) e sinais de um par de acelerómetros, convertidos em registos de velocidade (V1 e V2) ao longo do tempo. O equipamento permite a avaliação, em tempo real, da qualidade dos registos e da energia máxima transmitida à vara em cada golpe e o conhecimento do deslocamento vertical do trem de varas ocorrido em cada golpe do martelo. Por outro lado, baseando-se no tema acima referido, pretende-se ainda desenvolver esforços no sentido de melhorar o novo método interpretativo dos resultados dos ensaios SPT e sua aplicação ao dimensionamento de estacas, dado que a previsão da capacidade de carga de estacas constitui um dos desafios da engenharia de fundações por requerer a estimativa de propriedades do solo, alterações pela execução da fundação e conhecimento do mecanismo de interacção solo-estaca. Este novo procedimento baseia-se nos princípios da dinâmica, rompendo com as metodologias até aqui consagradas, de natureza essencialmente empírica. A nova forma de interpretar os ensaios SPT, consubstanciada nos princípios de conservação de energia na cravação do amostrador SPT, irá permitir converter analiticamente o valor Nspt numa força dinâmica de reacção à penetração. A decomposição desta força dinâmica permite efectuar análises comparativas entre as resistências unitárias mobilizadas no amostrador SPT (modelo) e as mobilizadas na estaca (protótipo).