4 resultados para Production Effort Unit

em Instituto Politécnico do Porto, Portugal


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a complete, quadratic programming formulation of the standard thermal unit commitment problem in power generation planning, together with a novel iterative optimisation algorithm for its solution. The algorithm, based on a mixed-integer formulation of the problem, considers piecewise linear approximations of the quadratic fuel cost function that are dynamically updated in an iterative way, converging to the optimum; this avoids the requirement of resorting to quadratic programming, making the solution process much quicker. From extensive computational tests on a broad set of benchmark instances of this problem, the algorithm was found to be flexible and capable of easily incorporating different problem constraints. Indeed, it is able to tackle ramp constraints, which although very important in practice were rarely considered in previous publications. Most importantly, optimal solutions were obtained for several well-known benchmark instances, including instances of practical relevance, that are not yet known to have been solved to optimality. Computational experiments and their results showed that the method proposed is both simple and extremely effective.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Neste documento, apresenta-se o reflexo sobre o trabalho de estágio desenvolvido entre 17 de Fevereiro e 31 de Julho de 2014, nas instalações da Fábrica das Estruturas Metálicas da Faurecia, em São João da Madeira, num Projecto Final no âmbito de Implementação de Ferramentas Lean. O objetivo proposto foi a participação na procura e implementação de soluções, com vista à melhoria contínua do sistema de produção. Foi utilizado, para esse efeito, um vasto conjunto de ferramentas entre as quais os 5S, QRCI, Standardized Work, entre outras e amplamente empregues na indústria automóvel (e nesta empresa em particular), através do Sistema de Excelência Faurecia (FES), aplicado ao ramo de negócio onde está solidamente implantada esta multinacional de origem francesa. O período de tempo em que decorreu o estágio constituiu uma oportunidade única para o estagiário contactar com os problemas existentes no departamento de produção, num mercado tão concorrencial e competitivo como é o da indústria de componentes para automóveis. O presente trabalho de estágio apresenta duas vertentes distintas: uma de caráter interno à empresa e outra relativa aos fornecedores e clientes. Em termos internos, foi visível a batalha pela diminuição das variabilidades que surgem no plano da produção ao absorver grande parte do esforço dos agentes que trabalham na otimização dos processos. Externamente, observou-se a dificuldade em encontrar fornecedores adequados a satisfazer os aprovisionamentos da Faurecia, em quantidade e qualidade, e um elevado grau de exigência imposto por parte dos vários clientes. Por fim, este Projeto possibilitou a aplicação de conhecimentos adquiridos não só ao longo do curso como também durante a realização do estágio, o conhecimento da realidade industrial e o enriquecimento técnico e pessoal.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In the present paper we consider a differentiated Stackelberg model, when the leader firm engages in an R&D process that gives an endogenous cost-reducing innovation. The aim is to study the licensing of the cost-reduction by a per-unit royalty and a fixed-fee. We analyse the implications of these types of licensing contracts over the R&D effort, the profits of the firms, the consumer surplus and the social welfare. By using comparative static analysis, we conclude that the degree of the differentiation of the goods plays an important role in the results.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Este relatório de estágio foi desenvolvido no âmbito do estágio de final de curso, em ambiente industrial, do Mestrado em Engenharia e Gestão Industrial da ESEIG. O estágio foi realizado na Continental Mabor S.A., situada em Vila Nova de Famalicão, mais especificamente no Departamento de Engenharia Industrial. A indústria dos pneus está inserida num mercado cada vez mais competitivo e exigente, em que os custos e os prazos de entrega devem ser cada vez menores e a qualidade do produto cada vez maior. Por esses motivos, é necessária uma constante melhoria dos processos produtivos. Para que este esforço de melhoria contínua seja bem-sucedido é necessário recorrer por vezes a prémios de produção, para incentivar uma maior produtividade. Contudo cada pneu tem tempos de produção diferentes de máquina para máquina e é preciso corrigir esses tempos em prol de uma justa atribuição de prémios. O presente trabalho teve como principal objetivo atualizar as perturbações e atualizar os tempos-máquina no setor de construção de pneus. Inicialmente foi recolhido o tempo de aplicação do capply (material que pertence ao pneu) para futuramente verificar se será possível prever o tempo de aplicação de capply, consoante os metros de aplicação. Como não foi possível estabelecer uma correlação, não será exposta a análise até se chegar a essa conclusão. Depois fez-se o estudo das perturbações, com recurso à cronometragem, na maior das cinco divisões da fábrica - a construção. Por último fez-se a recolha dos tempos-máquina de vários tipos de construção de pneus em todos os módulos de construção de pneus (KM e PU), através do método filmagem. Conseguiu-se singularizar os tempos para cada máquina de forma a tornar, mais justo os prémios de produção atribuídos aos operadores, no curto prazo, e optimizar a produção e o tempo-padrão.